ML20050N695
| ML20050N695 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/01/1982 |
| From: | Devincentis J PUBLIC SERVICE CO. OF NEW HAMPSHIRE, YANKEE ATOMIC ELECTRIC CO. |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20050N696 | List: |
| References | |
| SBN-248, NUDOCS 8204140422 | |
| Download: ML20050N695 (4) | |
Text
y v.
t stAMW STAH N IL) PUBLIC SERVICE fnsineeAng Offire-Compnny of N ew Hampnhka 1671 WoretWw Roadiue$dhd, Framinoham. Mnsu (617 ) - 872. E l d r$
,.,3 April 1,1982 SEN-248
.\\
t7
<N 8
4 h,., n of'T T.F.
B 7.1.2
=
th fiff United States Nuclear Regulatory Commission h
R O
Washington, D.
C.
20555 j
e At t entio n:
Mr. Frank J. Miraglia, Chief 6'
Licensing Branch No. 3 7Tr_,
Division of Licensing
References:
(a) Const ruc t ion Pe rmi t s CPPR-135 and CPPR-136, Docket Nos.
50-443 and 50-444 (b)
PSNil Letter, dated November 27, 1981, " Response to Acceptance Review Roquests for Additional Inforination a
(RAIs)," J. DeVincentis to D. C.
Eisenhut
~
Subject:
Scabrook Station Fire Protection Prog rata
Dear Sir:
In fulfillment of our cocmitments, relative to the Seabrook Station Fire delineated in Ref erence (b), we have enclosed two copies Protection Program, of the following exhibits:
Exhibit 1:
Comparison to 10 CFR 50 (Appendix R); Fire Protection Program for Operating Nuclear Power Plants.
Exhi bit 2:
Scabrook Station Fire Protection Program Evaluation and Corapa rison to BTP APCSB 9.5-1, Appendix A, Revision 1, April, 1982.
Exhibit 3:
Scabrook Station Fire Protection of Safe Shutdown Capability (10 CFR 50, Appendix R), April, 1982.
Ten additional copies of the above Exhibits will be provided to the NRC Project Manager in the near future.
Very truly yours,
" YANKEE ATOMIC LLECTRIC COMPANY U
l J. DeVincentis Project Hannger Enclosures J
I 1
cc: Cage Babcock and Associates, Inc.
135 Mdison Avenue Einhurst, Illinois 60126 Attn:
Robert Barnes 8204140422 820401 DR ADOCK 05000443 PDR ope
9 1
EXHIBIT 1 COMPARISON TO APPENDIX R TO 10CFn50_; FIRC Pit 0TECTION PROCPAM FOR OPERATING __ NUCLEAR POWER PIANTS Re f e re nce s :
(1) Seabrook Station Final Safety Analysis Repo rt (2) Seabrook Station Fire Protection Program Evaluation and Q)mparison to flTP 9.5-1, Appendix A (3) Seabrook Station Fire Protection of Safe Shutdown capability (10CFR50, Appendix R)
Public Service Company of New !!ampshire (PSNH) has reviewed Appendix R to 10CFR50 to detemine any area where the Seabrook Station Fire Protection Prograra does not meet with the intent of Appendix R.
The results of that c
review are as follows:
Section II A, Fi re Protection Program We comply with the intent of this section. See Reference 2, Pages F13/15 Section II B, Fire Hazard Analysis We co= ply with the intent of thin ocction.
See Reference 2, in total, and Reference 3.
Section II C, Fire Prevention Features We will comply with the intent of this cection.
See Reference 1. Section 9.5.1 f or systems info rmation.
A site Fire Brigade will be established and will be on site at all timec af ter the start of plant operations.
S_cction II D, Alternative or Dedicated Shutdown capahtlicy We comply with the intent of this section. See Reference 3.
Section III A, Water Supp1f en for Fire Suppression Systems We co:aply with the intent of this section.
See Reference 1 Section 9.5 1, and Ref erence 2, Pagen F-19/21 Section111B,SectionalIcolationValv$c We cooply with the intent of this section.
See Reference 1, Section 9.5.1.
Section III C, Hyd ran_t Inolation Valvec We comply with the intent of this section.
No available references go to this minute detail.
.e O
.f
Section i f I D, flinua l Fi re Supprensinn We consply with the intent of t.his section.
Soc Reference 1, Section 9.5.1.
Section III E, Hyd rostatic floce Te st s We will comply with the intent of this section.
At this time, these procedures havn not been developed.
Upon their completion, we will cocpa re them to Appendix R guidelines to insure compliance.
Section III F Automatic Fire De t ec t ion We do not fully comply with this section.
References (2) and (3) list where we do comply and our basis for this.
Section III C,_ Fire Protection of Safe Shutdown Capa bi li t y to the exemptions We comply with the intent of this section subject requested in Reference 3 Section III H. Fire Brigade We will comply with the intent of this section subject to a possible exemption request uith ref erence to the necessity that "tvo brigade members shall have suf ficient training in, or knowledge of, plant to understand the effects of fire and fire safety-related systems The staffing of the Fire suppressants on cafe chiitdown capability.
been established beyond the acknowledncent that it Brigade has not yet will contain five people and the shift supervisor vill not be a member.
have decided upon the staffing, ue vill compare it to Appendix R Once we f or compliance and discuss the need for an exemption with you.
Fire Brigade Training Section III I,_
We will comply with the intent of this section.
See Reference 1, Section 13.2 1.lc.
Section III J, Eme rgency Lightine, See Reference 2, We will comply with the intent of this section.
Pay.c F-88.
Section III K.
Administ ra t i ve Cont rol s of this section after plant operation.
We vill comply with the intent Administrative control procedures dealing with thin have not yet been to the detail of developed.
After development, we vill compare them Appendix R for compliance.
Alternativ_e and Dedicated Shutdown Capability Section 111 L,_
We will comply with the intent of this section subject to any exceptions noted in Re fe rence 3.
a 3-
~
b
,Se c t i o-t III M, l'I re Ha r ri e r Ca ble Pene t ra t i on Sea l (Na t i f iccit ion Cabic penet rar i no sea l qua ll'f icat ion will meet the intent of the requi rem.*er s of the St anda rd Revicu Plan.
Sec t i r,n III
_N, Fi re TA1 ors L'c wi ll coiaply wit h t he intent of this section.
Section III O, Oil Collec tion System for Reactor Coolant Pump L'e vill cotaply wi th the intent of this :;cction f o r U::i t 1 As you are studicr. are currently underway on development of a fire re t a rdent a wa re,
lubricating fluid for Reactor Coolant Pu cip s.
If this lubricating fluid is available for use in the future, we vill possibly request an exemption frors this section for Unit 2.
c ev=
I l
l l
4 AIACH El\\~~
l
,