Forwards Insp Rept 50-324/74-05 on 740325-27.New Unresolved Items Identified.Violations Noted
ML20044C497
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/09/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20044C467 List:
References
FOIA-92-569 NUDOCS 9303230139
Download: ML20044C497 (4)


See also: IR 05000324/1974005

Text

,

,

.

.

__

_.

.

..

j

. . .

_,

.

-

4

!

'

,

,

i

,,

)

.!

'!

.

APR

919M

In Reply Refer.To:'

-f

RO:II:RCP

I

50-324/74-5

i

)

Carolina Power and Light Company

Atta: ~ Mr. J. A. Jones

.

Executive Vice President

Engineering, Construction

and Operations

336 Payetteville Street

i

Raleigh, North Carolina

27602

-(

Centlemen:

,

This refers to the inspection conducted by Mr. R. C. Parker of this

j

office on March.25-27, 1974, of activities authorized by AEC Construction

Fernit No. CFPR-67 for the Brunswick 2 facility, and to the discussion

,

of our f4=d4=_== held by Mr. R. C. Parker with Mr. E. G. Hollosell at

the conclusion of the inspection.

1

Areas examined during the inspection and our~ findings'are' discussed-

I

in the enclosed inspection report. Within these areas, the inspection

consisted of selective ====inacion of procedures and representative

'

records, interviews with persennel, and observations by the inspector.

'

The results of our followup of previously identified matters are

contained in the enclosed report as follows:

'

The status of unresolved items identified in previous inspection

!

reports is discussed in Section IV of the sinunary of the enclosed -

I

report.

'

}

l

!

New unresolved items are identified in Section III of the summary of

]

the enclosed report.

i

During the inspection it was found that certain activities under your

l

license appear to be in violation of Appendix B to 10 CPR 50 of the

-i

ABC Esgulations, " Quality Assurance Critaria for Nuclear Power Plant."

The violatimas and references to the pertinent requirements are identified..

,

-

in Section 1 of the simumary of the enclosed report.

,

4

i

!

'

i

)

-

'

,

!

-

l

I

l

9303230139 930202

p.~

'

PDR

FOIA

i

O'MEALI92-569

PDR

-

I

t

!

.

'

,

i

%

'

i

- t

l-)

Carolina Power and Light

-2-

l

Company

7pg 3 g g

i

This notica is sent to you pursuant to the provisions of Section 2.201

!

of the AEC's " Rales of Practice," Part 2. Title 10, Code of Pederal

i

' Regulations. Section 2.201 requires you to submit to this offica,

I

within 20 days of your receipt of this notice, a written statement

l

or esplanation in reply. including:

(1) corrective steps which have

l

been taken by you, and the results achieved; (2) corroetive staps

!

which win be taken to avoid further violations; and (3) the date

l

when full compliance will be achieved.

'j

t

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

l

Title 10, code of Federal Regulations, a copy of this letter and the.

i

enclosed inspection report will be placed in the ABC's Public Doetusent

' '

Room. If this report contains any information that you believe to be

i

proprietary, it is aseessary that you submit a written application to

'

this office requesting that such information be withheld from publie

'

,

disclosure. If no proprietary information is identified, a written

i

statement to that affect should be submitted. If an application is

submitted, it must fully identify the bases for which information is

i

claimed to be proprietary. The application should be'propared so that

!

information sought to be withheld is incorporated in a separate paper

'

and referenced in the application since the application will be placed

in the Public Doetment Room. Your application, or written statement,

'

should be submitted to us within 20 days. If we are not contacted as

specified, the enclosed report and this. letter mey then be placed in the

'

Public Dociament Room.

Should you have any questions concerning this letter, we will be glad

[

to discuss them with you.

!

Very truly yours,

O'icin l s,ang g

a

N. c, g,,

'

Norman C. Mooaley

Director

j

Enclosars:

30 Inspection Emport No.

50-324/74-5

'

.j

.

!

l

!

omcr > Roe Td

l

umSI

Wi-I-I

{

RCPa

kk

R.

ewis

NCMqseley

" *'" 476//4

4/

DATE&

- - - }/74

4/ /74

k

~

7brtu AEC-818 (Rev 643)

i

e. s. e.,s

ase, essene. wacs atHis7en-e

i

!

_

.-

.

t

,

!

.

,.

t

,

!

!

t

!

.

!

r

i

!

Ltr to Carolina Power and Light Company

'

dM

'

APR 3 91974

i

!

DISTRIBUTION:

H. D.

Thornburg, RO

!

RO:HQ (4)

!

<,

<

Directorate of Licensing (4)

!

~-
-

_:

_ _ DR --Central- File. s - ..; - -- . ...-- . . 3:3 -- - -

,'p

-- .-

. __

_

- - - -_

_ ...:...-

..

,

!

  • NSIC

_

  • State

!

,

%

  • To be dispatched at a later date

,

fi

[

t

i

!

P

f

,

i

I

i

+

.

-p

- _ _ _ _ - _ - _ - - _ _ _ _ _ _ _ _ - - - - _

.

.

-

.

i

,

l

l

!

Carolina Power and Light Company

Brunswick 2

APR ]b tm

!

RO Inspection Report No. 50-324/74-5

i

cc w/ encl:

H. D. Thornburg, RO

RO:HQ (5)

DR Central Files

i

Regulatory Standards (3)

'

Directorate of Licensing (13)

cc encl. only:

  • PDR
  • NSIC
  • State
  • To be dispatched at a later date

1

1

?

!

!

l

l

I

i

i

l

i

1

.

__--_

_ ____

_________________________________________________.____._____.____._____________M