ML20042C019
| ML20042C019 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 03/23/1982 |
| From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| IPN-82-32, NUDOCS 8203300080 | |
| Download: ML20042C019 (2) | |
Text
POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLuwaus CincLE NEW YORK. N. Y.1o019 (212, 397 6200 GEORGET SERRY TRUSTEES oramatino op rican
"" ic"u *v'v"ea s
- a:::::=::c'~""'
GE04GE L ING ALLS v>C e cualmwAN JOSEPH R SC IEDER
,,,gofff a ca's*
ai neewano u rLv~~
ao=E ar a wistouri March 23, 1982 LEnov w. siscLAin "c][r,"55/c"t
,=E oEasc u n. cL Ann IPN-82-32 Director of Nuclear Reactor Regulation
"[.*.,",.'"cY,u....1 U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 g
Establishment of Onsite Review Committee
Reference:
1.
USNRC Notice of Violation and Imposed Civil Penalty dated November 9, 1981 -
ij R.C.
DeYoung to G.T.
Berry 2.
PASNY December 9, 1981 letter-
_ /~
~'
J.P.
Bayne to R.C.
DeYoung 4
. !/
- /
Dear Sir:
Pr J/;
- f. 'lW' In the Authority's response (reference 2) to the November 9,
1981 Notice of Violation (Reference 1), we outlined correc-tive measures being taken to avoid incidents of the type ex-perienced from recurring.
One of these measures was the es-tablishment of an independent Onsite Review Committee (ORC).
This committee will report directly to the Headquarters Office, and will be staffed by one supervisor and three en-gineers.
As originally planned, the ORC was to have been staffed and functional prior to the start of Cycle 5.
Because of j
difficulties in hiring qualified engineers to staff the ORC,
~
the committee at the start of Cycle 5 was composed of a chairman.
As of March 22, 1982 an additional temporary member has been assigned.
This configuration will continue until permanent members are hired.
00/
Che Authority is makin. every attempt to hire the per-sonnel necessary so that the ORC can fully assume it's J
responsibilities.
Recruiting efforts are currently underway.
/ 0 r2033OOO90 820323 PDR ADOCK 05000333 C
=. - -.
.. ~. _
a.
v If you have any questions, do not hesitate to contact i
.us.
Very truly yours,
.. Q 1 (iguWn-j
,b ' J.(P.)Bayne N
Senibr Vice President Nuclear Generation JPB/JE:mp cc:
Ronald C. Haynes Regional Administrator U.S. Nuclear Regulatory Commission Region I i
631 Park Avenue King of Prussia, PA 19406 J.
Linville, Resident Inspector U.S. Nuclear Regulatory Commission P.I.
Box 136
- Lycoming, N.Y.
10093 Richard C. DeYoung, Director Office of Inspection and Enforcement l
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 i
i 1
l i-t i
7 k
A 4
m
~,
4.,,
,~g.
e,.-..
%,-r,-
a-,--
7
-n----,
,-, -