ML20041E796

From kanterella
Jump to navigation Jump to search
Annunciator Response Procedure Ann 4.14-30, Bus 9 Level Three Trip
ML20041E796
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/11/1982
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20041E788 List:
References
ANN-4.14-30-C, NUDOCS 8203120329
Download: ML20041E796 (2)


Text

l

-s c:v.c-se ANN 4.14-30-C Original JAN 111982 P

T OPERATION 5 REVIEW COMMITTEE APPROVAL Annunciator Response Procedure c

~

No. ANN 4.14-30 N

' " ~

ScL?

  1. dl!Ada APPRO D Y%T oEmmTENDENT EFFECTIVE OATE v,'u/e.2 1.0 ALARM TITLE:

Bus 9 Level Three Trip 2.0 MODULE NUMBER:

J 1.1-6 Lower

3.0 SETPOINT

62B/1-9 agastat dropout actuated by at least two out of three selected level three units.

1 The level three units are set for 3940 volts.

4.0 SIGNIFICANCE

Indicates that at least two out of three level three units have failed or a low voltage exists.

An undervoltage trip will occur if a safety injection signal occurs following the low voltage actuation.

5.0 PROCEDURE

5.1 If there are no safety injection at this time, a level three trip alarm will be initiated. Once this alarm is received, the operator should notify CONVEX to try and increise the 115KV switchyard voltage.

If the voltage can't be restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the operator must bring the plant to Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

5.2 If a safety injection signal occurs while the degraded voltage logic is producing an output, the 86/1-9 lockout relay will operate. This relay will operate the 277, 27Y1, and 27Y2 relays. These relays will do the following:

c 27Y/1-9 Operate 4/EG2B (to start the diesel)

Initiate Load Shedding (through the 94LS/1-9 relay)

Trip and Lockout 4971 Close 6T7 initiate Close of 52/EG2B Block Auto Start of Charging Pump P-18-1A Initiate Sequencing of Service Water Pump P-37-lC or P-37-ID.

8203120329 820304 (1

Page 1 of 2 PDR ADOCK 05000213 f

P PDR

,C/

}

l' '

ANN 4.14-30-C

,, l Originni JAN 11 B82 27Y1/1-9 Trip HPSI Pump P-15-1A Trip LPSI Pump P92A Trip Charging Pump P-18-1A 27Y2/1-9 Trip and Lockout 3T9 Trip and Lockout 9T3 When resetting these relays,'it is important that the 86/1-9 be reset before 27Y-1-9 and that 27Y-1-9 and safety injection 4A and 4B relays be reset prior to resetting 4/EG2A.

l

)

4 ff Page 2 of 2 9