Advises That Encl IE Bulletin 78-03, Potential Explosive Gas Mixture Accumulations Associated W/Bwr Offgas Sys Operations, Has Been Sent to Listed Licensee for Action/ Info
ML20028C458
Person / Time
Site: Monticello, Dresden, Perry, Fermi, Duane Arnold, Clinton, Quad Cities, La Crosse, Big Rock Point, LaSalle, 05000000, Zimmer, Bailly
Issue date: 02/10/1978
From: Pappas H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Boyd R, Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
Shared Package
ML20027A594 List: ... further results
References
FOIA-82-545 NUDOCS 8301100212
Download: ML20028C458 (3)


Text

7 l- -, 4 y.

_ pa a80 UNITEo STATES

+

/

0g%

NUCLEAR. REGULATORY COMMISSION

['

~$

RECloN lli

- t. ? "

. j.

799 ROOSEVELT RO Ao t

of CLEN ELLYN. ILUNOIS 60137

%,*****sd.

FEB 16. 8 MEMORANDUM FOR: Those on Attached List FROM:

Helen Pappas,-Chief, Administrative Branch

SUBJECT:

IE BULLETIN NO. 78-03 The attached IE Bulletin No. 78-03 titled " Potential Explosive Gas Mixture Accumulations Associated With BWR Offgas System Operations" was sent to the following licensees on February 10, 1978, for:

Action Commonwealth Edison Conpany Dresden 1, 2, 3 (50-10, 50-237, 50-249)

Quad-Cities 1, 2 (50-254, 50-265)

Consumers Power Company Big Rock Point -(50-155) l Dairyland Power Cooperative LACBWR (50-409)

Iowa Electric Light and Power Company Duane Arnold (50-331) i Northern States Power Company Monticello (50-263)

Information Cincinnati Gas and Electric Company Zimmer (50-358)

Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441) i Commonwealth Edison Company La Salle 1, 2 (50-373, 50-374) 8301100212 821207 PDR FOIA HIATTS2-545 PDR

c 9

Those on Attached List FEB 1 c. 8 Detroit Edison Company Fermi 2 (50-341)

Illinois Power Company Clinton 1, 2 (50-461, 50-462)

Northern Indiana Public Service Company Bailly (50-367)

(L J /. 9;jA d Helen Pappas, Chief Administrative Branch

Enclosures:

1.

IE Bulletin No. 78-03 2.

List of IE Bulletins Issued in 1978 9

L

,*,,v Addressees - Memorandum dated February 10, 1978 AD/RCI nr AD/ROI MIPC (Rizzo)

Standards Development NRR:DPM (Boyd)

NRR: DOR (Stello)

-e

=

February 10, 1978 IE Bulletin No. 78-03 POTENTIAL EXPLOSIVE GAS MIXTURE ACCUMULATIONS ASSOCIATED WITH BWR OFFCAS SYSTEM OPERATIONS Description of Circumstances:

On December 13, 1977, two hydrogen explosions occurred at the Millstone Nuclear Power Station Unic No. 1, a boiling water reactor (BWR).

The first explosion occurred at 9:30 a.m. and was mostly confined to the offgas system. Damage was relatively minor, including the breaking of glass faces on offgas system flow differential pressure gag;es, the blowout of a rupture disk and the evacuation of loop seals between the offgas system drain lines and stack base sump.

The second explosion occurred at 1:00 p.m. outside the offgas system in the two-level room at the base of the plant stack. This explosion blev the stack base space door into a warehouse about 200 feet away, breached the reinforced concrete ceiling between the stack chimney and the stack base space, extensively damaged the ceiling beams, dislodged the 2-ton concrete plugs in the floor above the offgas system particulate filters, damaged the stack radiation monitor isokinetic probe supports, and produced cracks in the stack. These cracks were vertical, with a maximum separation at the surface of 1/16 inch; however, the overall structural capability of the stack was not impaired.

One man was injured by the blast, receiving a concussion, skin abrasions, and contamination. Ile was hospitalized because of the concussion and was released four days after the event.

The licensee's review of the event concluded that the action taken to restore offgas system drain line loop seals in the stack base space had not been successful. Without these seals, gases from the offgas system accumulated in the space, resulting in an explosive mixture which was probably ignited by a spark f rom the level switch in the stack base sump.

Inadequate ventilation of the stack base space and the lack of equipment installed to monitor explosive gas concentrations within the enclosed area were concluded to be contributing factors.

1,494Af"A?17

- is s

t*,..t IE Bulletin No. 78-03 February 10, 1978 By way of background, it is recognized that accumulation of explosive hydrogen mixtures was considered in the design of the BWR offgas system.

As a result, the design has prevented major releases of airborne radio-activity in the approximately 25 known hydrogen gas explosions that have occurred within the offgas systems of operating BWRs. Extensive mechanical damage to equipment and structures, however, in~ addition to uncontrolled' release of radioactive material, have resulted from five explosions, including the Millstone event, where hydrogen gas accumulated outside of the offgas system.

Action to be Taken by Licensees:

For all BWR power reactor facilities with an operating license:

1.

Review the operations and maintenance procedures related to the offgas system to assure proper operation in accordance with all design parameters. Include in this review measures you have taken or will take to prevent inadvertent actions (such as are strikes) which might cause ignition of the mixture of gases contained in the offgas piping.

2.

Review the adequacy of the ventilation of spaces and areas through which offgas system piping containing explosive mixtures of gases pass. The review should consider ventilation losses and off-normal offgas system operation, such as lack of dilution steam, lost loop seals, blown rupture disks, bypassing recombiners, and leakage of offgas int'o isolated pdreions of systems.

3.

For those spaces and areas identified,' describe what action you have taken or plan to take to assure that explosive. mixtures cannot accumulate, that monitoring equipment will warn of such an accumulation, and that disposal of such mixtures will be controlled without resulting in a damaging explosion.

4.

Loop seals are potential offgas leakage paths following a pressure transient in the offgas system piping. Describe your design features to minimize and detect the loss of liquid from loop seals and describe operating procedures which assure prompt detection and re-seal of the blown loop seals.

5.

Review operating and emergency procedures. to assure that your operating staff has adequate guidance to respond properly to effgas systen explosions.

1 i

(*

t z

IE Bulletin No. 78-03 February 10, 1978 6.

Within 45 calendar days of the date of issue of this bulletin,.

report in writing to the Director of the appropriate NRC Regional Office, the results of your review and your plan of action with regard to Items 1 through 5.

A copy of your report should be sent to the United States Nuclear Regulatory Commission, Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D. C. 20555.

For all BWR power reactor facilities with a construction permit, this Bulletin is for information only and no written response is required.

Approved by GAO, B180225 (R0072); clearance expires 7/31/80. Approval was given under a blanket clearance specifically for identified generic problems,

s

  • . ;?

~

?,s o'

... ~

IE Bulletin No. 78-03 February 10, 1978 LISTING OF IE BULLETINS ISSUED IN 1978 Bulletin Subj ect Date Issued Issued To No.

78-01 Flammable Contact -

1/16/78 All Power Reactor Arm Retainers in G.E.

Facilities with an CR120A Relays Operating License (OL) or Construc-tion Permit (CP) 78-02 Terminal Block 1/30/78 All Power Reactor Qualification Facilities with an Operating License (OL) or Construc-Permit (CP)

Page 1 of 1 i