| | | Reporting criterion |
|---|
| 05000281/LER-1982-001, Forwards LER 82-001/03L-0 | Forwards LER 82-001/03L-0 | |
| 05000281/LER-1982-001-03, /03L-0:on 820105,loss of Accurate Control of Boric Acid Concentrations of Unit 2 Bit & C Bast Occurred on 820105,08,15 & 18.Caused by Inleakage to Bit Via MOV-2867 A&B.Boron Concentration Returned to Tech Spec Limit | /03L-0:on 820105,loss of Accurate Control of Boric Acid Concentrations of Unit 2 Bit & C Bast Occurred on 820105,08,15 & 18.Caused by Inleakage to Bit Via MOV-2867 A&B.Boron Concentration Returned to Tech Spec Limit | |
| 05000280/LER-1982-001-03, /03L-0:on 820106,spurious Safety Injection Caused Phase 1 Containment Isolation.Trip Valve TV-CC-109B Failed to Close.Caused by Teflon Tape Preventing Operation of 3-way SOV That Controls TV-CC-109B | /03L-0:on 820106,spurious Safety Injection Caused Phase 1 Containment Isolation.Trip Valve TV-CC-109B Failed to Close.Caused by Teflon Tape Preventing Operation of 3-way SOV That Controls TV-CC-109B | |
| 05000280/LER-1982-001, Forwards LER 82-001/03L-0 | Forwards LER 82-001/03L-0 | |
| 05000280/LER-1982-002-03, /03L-0:on 820120,both Containment Pumps Declared Inoperable by Failing to Develop Flow.Caused by Water Accumulation in Common Discharge Piping.Piping Drained & Pumps Returned to Svc | /03L-0:on 820120,both Containment Pumps Declared Inoperable by Failing to Develop Flow.Caused by Water Accumulation in Common Discharge Piping.Piping Drained & Pumps Returned to Svc | |
| 05000280/LER-1982-003-03, /03L-0:on 820122,loss of Boric Acid Flow to Blender Observed.Caused by Inadequate Insulation on FT-1113 & Adjacent Piping.Blockages Removed or Freed & Addl Insulation Added to Prevent Recurrence | /03L-0:on 820122,loss of Boric Acid Flow to Blender Observed.Caused by Inadequate Insulation on FT-1113 & Adjacent Piping.Blockages Removed or Freed & Addl Insulation Added to Prevent Recurrence | |
| 05000281/LER-1982-003-03, /03L-0:on 820108,PT-27 Revealed Ampere Readings for Heat Tracing Panel 10 Circuits 1B,2A & 5B & Panel 11 Circuit 2A,4C & 5B Found Below Acceptance Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested | /03L-0:on 820108,PT-27 Revealed Ampere Readings for Heat Tracing Panel 10 Circuits 1B,2A & 5B & Panel 11 Circuit 2A,4C & 5B Found Below Acceptance Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested | |
| 05000281/LER-1982-004, Forwards LER 82-004/03L-0 | Forwards LER 82-004/03L-0 | |
| 05000280/LER-1982-004-03, /03L-0:on 820112,fire Hydrants 1-FP-89,1-FP-63, 1-FP-73 & 1-FP-98 Would Not Open.Caused by Freezing of Stagnant Water in Body of Hydrant Due to Unusually Low Temp. Frequency of Insps to Be Increased During Winter Months | /03L-0:on 820112,fire Hydrants 1-FP-89,1-FP-63, 1-FP-73 & 1-FP-98 Would Not Open.Caused by Freezing of Stagnant Water in Body of Hydrant Due to Unusually Low Temp. Frequency of Insps to Be Increased During Winter Months | |
| 05000281/LER-1982-004-03, /03L-0:on 820112,at 85% Power,Boron Injection Tank Recirculation Lost Due to Failure of Pump 1-CH-P-2D Leaving Only Two Boric Acid Transfer Pumps Serviceable.Caused by Failure of Mechanical Seal.Pump Repaired | /03L-0:on 820112,at 85% Power,Boron Injection Tank Recirculation Lost Due to Failure of Pump 1-CH-P-2D Leaving Only Two Boric Acid Transfer Pumps Serviceable.Caused by Failure of Mechanical Seal.Pump Repaired | |
| 05000280/LER-1982-005-03, /03L-0:on 820207,trip Valve TV-SS-204B Was Discovered Open & Would Not Close W/O Operator Intervention. Caused by Misalignment of Actuation Disk.Actuation Disk Adjusted | /03L-0:on 820207,trip Valve TV-SS-204B Was Discovered Open & Would Not Close W/O Operator Intervention. Caused by Misalignment of Actuation Disk.Actuation Disk Adjusted | |
| 05000280/LER-1982-006-03, /03L-0:on 820211,w/unit at 100% power,PT-27 Revealed That Amp Readings for Heat Tracing Panel 11,circuit 6A Was Below Acceptance Criteria.Caused by Excessive Heat. Defective Heat Tracing Replaced & Tested | /03L-0:on 820211,w/unit at 100% power,PT-27 Revealed That Amp Readings for Heat Tracing Panel 11,circuit 6A Was Below Acceptance Criteria.Caused by Excessive Heat. Defective Heat Tracing Replaced & Tested | |
| 05000280/LER-1982-007-03, /03L-0:on 820119,PT-27C Revealed Amp Reading for Heat Tracing Panel 9,circuit 20B Below Acceptance Criteria. Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested | /03L-0:on 820119,PT-27C Revealed Amp Reading for Heat Tracing Panel 9,circuit 20B Below Acceptance Criteria. Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested | |
| 05000280/LER-1982-007, Forwards LER 82-007/03L-0 | Forwards LER 82-007/03L-0 | |
| 05000281/LER-1982-007-03, /03L-0:on 820118,periodic Test 10 Revealed Unidentified Leak Rate Greater than 1 Gallon Per Minute. Caused by Inlet Flange Leak on Relief Valve.Flange Gasket Replaced | /03L-0:on 820118,periodic Test 10 Revealed Unidentified Leak Rate Greater than 1 Gallon Per Minute. Caused by Inlet Flange Leak on Relief Valve.Flange Gasket Replaced | |
| 05000280/LER-1982-008-03, /03L-0:on 820121,instrument Malfunction Resulted in Loss of All Pressurized Heaters.Caused by Short in One Pressurized Level Comparator.Short Repaired & Pressurizer Control Sys Returned to Normal Condition | /03L-0:on 820121,instrument Malfunction Resulted in Loss of All Pressurized Heaters.Caused by Short in One Pressurized Level Comparator.Short Repaired & Pressurizer Control Sys Returned to Normal Condition | |
| 05000281/LER-1982-008-03, /03L-0:on 820118,fault Occurred on Feeder Cables to B Reserve Station Svc Transformer.Isolation of Fault de-energized Emergency Bus.Caused by Flashover to Ground & to Adjacent Phase Due to Spraying of Insulators | /03L-0:on 820118,fault Occurred on Feeder Cables to B Reserve Station Svc Transformer.Isolation of Fault de-energized Emergency Bus.Caused by Flashover to Ground & to Adjacent Phase Due to Spraying of Insulators | |
| 05000280/LER-1982-009-03, /03L-0,on 820128,inadequate Svc Water Flow Resulted in Higher 2-CH-P-1C Lubricating Oil Temp.Pump Declared Inoperable.Caused by Foreign Object in Svc Water Temp Control Valve Body.Object Removed | /03L-0,on 820128,inadequate Svc Water Flow Resulted in Higher 2-CH-P-1C Lubricating Oil Temp.Pump Declared Inoperable.Caused by Foreign Object in Svc Water Temp Control Valve Body.Object Removed | |
| 05000280/LER-1982-010-03, /03L-0:on 820105,while Removing Unit from Svc, Spurious Safety Injection Signal Generated & Trip Valve Failed to Close.Cause Not Found.Investigation Continuing | /03L-0:on 820105,while Removing Unit from Svc, Spurious Safety Injection Signal Generated & Trip Valve Failed to Close.Cause Not Found.Investigation Continuing | |
| 05000280/LER-1982-011-03, /03L-0:on 820126,three Incidents of Unsampled Release from Subsurface Drains to Discharge Canal Occurred. Caused by Operator Error.Administrative Controls Established to Notify Health Physics Prior to Pumping of Drains | /03L-0:on 820126,three Incidents of Unsampled Release from Subsurface Drains to Discharge Canal Occurred. Caused by Operator Error.Administrative Controls Established to Notify Health Physics Prior to Pumping of Drains | |
| 05000280/LER-1982-012-03, /03L-0,on 820131,amp Readings for Heat Tracing Circuits 23A & C on Panels 8 & 9 Found Below Acceptance Criteria.Apparently Caused by Inadvertent Damage to Heat Tracing Tape During Cleanup Operations.Tape Replaced | /03L-0,on 820131,amp Readings for Heat Tracing Circuits 23A & C on Panels 8 & 9 Found Below Acceptance Criteria.Apparently Caused by Inadvertent Damage to Heat Tracing Tape During Cleanup Operations.Tape Replaced | |
| 05000281/LER-1982-013, Forwards LER 82-013/03L-0 | Forwards LER 82-013/03L-0 | |
| 05000280/LER-1982-013-03, /03L-0:on 820126,dropped Control Rod Resulted in Quadrant to Average Power Tilt of Greater than 2%.Caused by Corroded Conductors in Power Supply Due to Break in Cable Admitting Moisture.Cable Repaired & Control Rod Realigned | /03L-0:on 820126,dropped Control Rod Resulted in Quadrant to Average Power Tilt of Greater than 2%.Caused by Corroded Conductors in Power Supply Due to Break in Cable Admitting Moisture.Cable Repaired & Control Rod Realigned | |
| 05000281/LER-1982-013-03, /03L-0:on 820124,radioiodine Sample Taken 6-h & 28 Minutes Following Thermal Power Increase,Exceeded Tech Spec Time Limit.Caused by Delayed Oncoming Shift Chemists Due to Traffic Problems | /03L-0:on 820124,radioiodine Sample Taken 6-h & 28 Minutes Following Thermal Power Increase,Exceeded Tech Spec Time Limit.Caused by Delayed Oncoming Shift Chemists Due to Traffic Problems | |
| 05000280/LER-1982-014-03, /03L-0:on 820127,amp Readings for Heat Tracing Panel 8,circuit 2B Found Below Acceptance Criteria.Caused by Excessive Heat Tape.Defective Heat Tracing Replaced. Manner in Which Borated Lines Are Heat Traced Changed | /03L-0:on 820127,amp Readings for Heat Tracing Panel 8,circuit 2B Found Below Acceptance Criteria.Caused by Excessive Heat Tape.Defective Heat Tracing Replaced. Manner in Which Borated Lines Are Heat Traced Changed | |
| 05000280/LER-1982-015-03, /03L-0,on 820129,while Performing PT-33,low Control Room Envelope Pressure of .045 Inches of Water Found.Caused by Deterioration of Weather Stripping Around Doors.Weather Stripping Replaced | /03L-0,on 820129,while Performing PT-33,low Control Room Envelope Pressure of .045 Inches of Water Found.Caused by Deterioration of Weather Stripping Around Doors.Weather Stripping Replaced | |
| 05000280/LER-1982-016-03, /03L-0:on 820131,loss of Boric Acid Flow to Blender Observed While Attempting Blend to Vol Control Tank. Caused by Loss of Heat Tracing & Damaged Insulation Upstream of Flow Transmitter.Tracing Replaced | /03L-0:on 820131,loss of Boric Acid Flow to Blender Observed While Attempting Blend to Vol Control Tank. Caused by Loss of Heat Tracing & Damaged Insulation Upstream of Flow Transmitter.Tracing Replaced | |
| 05000280/LER-1982-017-03, /03L-0:on 820131,PR-27 Revealed Ampere Readings for Heat Tracing Panels 8 & 9,circuits 24A & C Below Acceptance Criteria.Caused by Loss of Heat Tracing Due to Excessive Heat.Tracing Replaced.Design Change Initiated | /03L-0:on 820131,PR-27 Revealed Ampere Readings for Heat Tracing Panels 8 & 9,circuits 24A & C Below Acceptance Criteria.Caused by Loss of Heat Tracing Due to Excessive Heat.Tracing Replaced.Design Change Initiated | |
| 05000280/LER-1982-018, Forwards LER 82-018/03L-0 | Forwards LER 82-018/03L-0 | |
| 05000280/LER-1982-018-03, /03L-0:on 820121,PT-27 Revealed Amp Readings for Heat Tracing Panels 8 & 9,circuit 13A,below Acceptable Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested | /03L-0:on 820121,PT-27 Revealed Amp Readings for Heat Tracing Panels 8 & 9,circuit 13A,below Acceptable Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested | |
| 05000280/LER-1982-019-03, /03L-0:on 820202,PT-27 Revealed Ampere Readings for Heat Tracing Circuits 24C,25A,panel 2 & Circuit 24D, Panels 1 & 2 (Boron Injection Tank Recirculation Line) Below Acceptance Criteria.Caused by Loss of Heat Tracing | /03L-0:on 820202,PT-27 Revealed Ampere Readings for Heat Tracing Circuits 24C,25A,panel 2 & Circuit 24D, Panels 1 & 2 (Boron Injection Tank Recirculation Line) Below Acceptance Criteria.Caused by Loss of Heat Tracing | |
| 05000280/LER-1982-020-03, /03L-0:on 820205,w/unit at 100% Power,Loss of Boric Acid Flow to Blender Was Observed.Caused by Operating Mechanism Failure on Valve 1-CH-88.Valve Mechanism Repaired | /03L-0:on 820205,w/unit at 100% Power,Loss of Boric Acid Flow to Blender Was Observed.Caused by Operating Mechanism Failure on Valve 1-CH-88.Valve Mechanism Repaired | |
| 05000280/LER-1982-021-03, /03L-0:on 820415,w/unit Operating at Steady State 96% power,2 Emergency Diesel Generator Found Stuck in Lower Position.Caused by Speed Control Governor Being Physically Stuck in Lower Position | /03L-0:on 820415,w/unit Operating at Steady State 96% power,2 Emergency Diesel Generator Found Stuck in Lower Position.Caused by Speed Control Governor Being Physically Stuck in Lower Position | |
| 05000280/LER-1982-022-03, /02L-0:on 820209,relief Valve RV-GW-103 Opened Causing Pressure Transient in Process Vent Sys & Damaging Process Vent Flow Transmitter.Caused by Momentary Pressure Spike That Overranged Flow Transmitter.Transmitter Replaced | /02L-0:on 820209,relief Valve RV-GW-103 Opened Causing Pressure Transient in Process Vent Sys & Damaging Process Vent Flow Transmitter.Caused by Momentary Pressure Spike That Overranged Flow Transmitter.Transmitter Replaced | |
| 05000280/LER-1982-022, Forwards Updated LER 82-022/03X-1 & LER 82-047/01T-0 | Forwards Updated LER 82-022/03X-1 & LER 82-047/01T-0 | |
| 05000280/LER-1982-023-03, /03L-0:on 820212,PT-39B.2 & PT-39B.1 Revealed That Snubbers 1-RC-HSS-131,1-WFPD-HSS-15 & 1-SHP-HSS-35B Were Inoperable Due to Low Oil Reservoir Level.Caused by Seal Leakage.Snubbers Replaced &/Or Repaired | /03L-0:on 820212,PT-39B.2 & PT-39B.1 Revealed That Snubbers 1-RC-HSS-131,1-WFPD-HSS-15 & 1-SHP-HSS-35B Were Inoperable Due to Low Oil Reservoir Level.Caused by Seal Leakage.Snubbers Replaced &/Or Repaired | |
| 05000281/LER-1982-023, Forwards LER 82-023/03L-0 | Forwards LER 82-023/03L-0 | |
| 05000281/LER-1982-023-03, /03L-0:on 820420 W/Boric Acid Transfer Pump 1-CH-P-2D Tagged for Maint,Boron Injection Tank Recirculation Lost Due to Failure of 1-CH-P-2C.Caused by Reversal of Slow Speed Motor Leads.Pump Repaired | /03L-0:on 820420 W/Boric Acid Transfer Pump 1-CH-P-2D Tagged for Maint,Boron Injection Tank Recirculation Lost Due to Failure of 1-CH-P-2C.Caused by Reversal of Slow Speed Motor Leads.Pump Repaired | |
| 05000280/LER-1982-024-01, /01T-0:on 820524,weld Leak on a Steam Generator Channel Head Drain Piping at 2-RC-159 Identified During RCS Integrity Test PT-11.Caused by Random Defect in Root Weld, Possibly Due to Split Pass | /01T-0:on 820524,weld Leak on a Steam Generator Channel Head Drain Piping at 2-RC-159 Identified During RCS Integrity Test PT-11.Caused by Random Defect in Root Weld, Possibly Due to Split Pass | |
| 05000280/LER-1982-025-03, /03L:on 820509,control Room Operator Overfilled B Accumulator Beyond Upper Tech Spec Limit.Caused by Operator error.HCV-2852B Opened to Drain Accumulator Tank to Tech Spec Limits | /03L:on 820509,control Room Operator Overfilled B Accumulator Beyond Upper Tech Spec Limit.Caused by Operator error.HCV-2852B Opened to Drain Accumulator Tank to Tech Spec Limits | |
| 05000280/LER-1982-026-03, /03L-0:on 820618,electrical Penetration Found Improperly Sealed.Caused by Personnel Failure to Restore Penetration to Original State Following Cable Installation. Penetration Sealed | /03L-0:on 820618,electrical Penetration Found Improperly Sealed.Caused by Personnel Failure to Restore Penetration to Original State Following Cable Installation. Penetration Sealed | |
| 05000280/LER-1982-027-03, /03L-0:on 820513,performance of PT 27B Revealed Amp Readings for Heat Tracing Panels 8 & 9,circuit 21A,below Acceptance Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced | /03L-0:on 820513,performance of PT 27B Revealed Amp Readings for Heat Tracing Panels 8 & 9,circuit 21A,below Acceptance Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced | |
| 05000280/LER-1982-028-03, /03L-0:on 820513,both Charging Pump Svc Water pumps,2-SW-10A & 10B,lost Suction.Caused by Clogged Suction Line Strainer Due to Marine Growth & Increased Use of Svc Water by Chillers | /03L-0:on 820513,both Charging Pump Svc Water pumps,2-SW-10A & 10B,lost Suction.Caused by Clogged Suction Line Strainer Due to Marine Growth & Increased Use of Svc Water by Chillers | |
| 05000280/LER-1982-029-03, /03L-0:on 820518,during Periodic Test 2-PT-39B-2 Snubbers 2-RC-HSS-162 & 163 Found to Have Empty Remote Reservoir.Caused by Damaged O Ring on Common Valve Block. O Ring Replaced | /03L-0:on 820518,during Periodic Test 2-PT-39B-2 Snubbers 2-RC-HSS-162 & 163 Found to Have Empty Remote Reservoir.Caused by Damaged O Ring on Common Valve Block. O Ring Replaced | |
| 05000280/LER-1982-029-01, /01T-0:on 820222,steam Line Flow Instruments for a Main Steam Line,Channels 3 & 4, & B Main Steam Line,Channel 3,reported Inoperable During Startup.Caused by Lack of Power Supply Fuses to Transmitters.Fuses Replaced | /01T-0:on 820222,steam Line Flow Instruments for a Main Steam Line,Channels 3 & 4, & B Main Steam Line,Channel 3,reported Inoperable During Startup.Caused by Lack of Power Supply Fuses to Transmitters.Fuses Replaced | |
| 05000280/LER-1982-029, Forwards LER 82-029/01T-0 | Forwards LER 82-029/01T-0 | |
| 05000280/LER-1982-030-03, /03L-0:on 820526,during Cold Shutdown,Preparations for Filling Reactor Coolant Loop a Resulted in RCS Boron Dilution.Caused by Temporary Malfunction of Boric Acid Flow Controller.Controller Functioning Properly | /03L-0:on 820526,during Cold Shutdown,Preparations for Filling Reactor Coolant Loop a Resulted in RCS Boron Dilution.Caused by Temporary Malfunction of Boric Acid Flow Controller.Controller Functioning Properly | |
| 05000280/LER-1982-031-03, /03L-0:on 820222,RHR Sample Sys Containing Isolation Trip valve,TV-SS-103A,opened W/O Operator Action & Could Not Be Closed from Control Room.Cause Not Yet Identified.Redundant Trip Valve Closed | /03L-0:on 820222,RHR Sample Sys Containing Isolation Trip valve,TV-SS-103A,opened W/O Operator Action & Could Not Be Closed from Control Room.Cause Not Yet Identified.Redundant Trip Valve Closed | |
| 05000280/LER-1982-032-03, /03L-0:on 820531,pressure in Nitrogen Bottle Supplying Emergency Air to PCV-MS-202A & B Found Below Tech Spec Limit.Caused by Fitting Leaks in Air Lines.Fittings Tightened & Pressurized Bottle Installed | /03L-0:on 820531,pressure in Nitrogen Bottle Supplying Emergency Air to PCV-MS-202A & B Found Below Tech Spec Limit.Caused by Fitting Leaks in Air Lines.Fittings Tightened & Pressurized Bottle Installed | |
| 05000280/LER-1982-033-03, /03L-0:on 820530,w/unit at 96% Power,Charging Pump Svc Water Pump 2-SW-P-10B Failed to Develop Sufficient Discharge Pressure.Caused by Insufficient Npsh.Svc Water to Chillers Throttled | /03L-0:on 820530,w/unit at 96% Power,Charging Pump Svc Water Pump 2-SW-P-10B Failed to Develop Sufficient Discharge Pressure.Caused by Insufficient Npsh.Svc Water to Chillers Throttled | |