ML20013E096
| ML20013E096 | |
| Person / Time | |
|---|---|
| Issue date: | 04/15/2020 |
| From: | NRC/NRR/DNRL |
| To: | NRC/OCIO |
| Murray D, 415-7646 | |
| Shared Package | |
| ML20013E077 | List: |
| References | |
| 3150-0151, NRC-2019-0216 | |
| Download: ML20013E096 (20) | |
Text
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr Regulatory Guide (RG) 1.206, "Applications for Nuclear Power Plants" conduct of pre-application activities 2
1 2
25,000 50000
$13,900,000 Subtotal: General Provisions 3
3 50360
$14,000,080 Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr 52.15(b) - Burden covered under 10 CFR 50.30(a), (b), and (f),
approved by OMB under Clearance No. 3150-0011.
Filing requirements n/a n/a n/a n/a n/a n/a 52.16 - Burden covered under 10 CFR 50.33(a) - (d) and 50.33(j),
approved by OMB under Clearance No. 3150-0011 requires that the application contain all of the information required by 10 CFR 50.33(a) through (d) and (j) n/a n/a n/a n/a n/a n/a 52.17(a)(1) site safety analysis report 0
0 0
0 0
$0 52.17(a)(2) - Burden covered under 10 CFR 51.50, approved by OMB under Clearance No. 3150-0021 A complete environmental report as required by 10 CFR 51.50(b).
0 0
0 0
0
$0 52.17(b)(1) submitting information on physical characteristics of the proposed site that could pose a significant impediment to the development of emergency plans 0
0 0
0 0
$0 52.17(b)(2)(i) and 52.17(b)(3) without ITAAC propose major features of the emergency plans in the site SAR 0
0 0
0 0
$0 52.17(b)(2)(i) and 52.17(b)(3) with ITAAC propose major features of the emergency plans in the site SAR 0
0 0
0 0
$0 52.17(b)(2)(ii) and 52.17(b)(3) propose complete and integrated emergency plans in the site SAR 0
0 0
0 0
$0 52.17(b)(4) include a description of contacts and arrangements made with Federal, State, and local governmental agencies with emergency planning responsibilities 0
0 0
0 0
$0 application for exemption NRC expects 0 new ESP application over the next 3 years. (0/3=0)
TABLE 1 ANNUAL REPORTING BURDEN 10 CFR PART 52 SUBPART A: EARLY SITE PERMITS (ESPs)
GENERAL PROVISIONS 360 360
$100,080 52.7 (Respondent is same as in Subpart C below. Only one exemption is expected to be requested annually) 1 1
1
52.17(c) - Burden covered under 10 CFR 50.10(d)(3), approved by OMB under Clearance No. 3150-0011 Limited work authorization (LWA) n/a n/a n/a n/a n/a n/a 52.29(a) requirements for a renewal application of any ESP 0
0 0
0 0
$0 52.35 requires the holder to notify the agency of the non-nuclear use 0
0 0
0 0
$0 52.39(b) - Burden covered under 10 CFR 52.79(b) applicants for a CP, OL, or COL who have filed an application referencing an ESP to update their emergency preparedness information provided under 52.17(b) n/a n/a n/a n/a n/a n/a 52.39(d) an applicant referencing an ESP may include in its application a request for a variance from one or more site characteristics, design parameters, or terms and conditions of the ESP, or from the site SAR 0
0 0
0 0
$0 52.39(e) - Burden covered under 10 CFR 50.90, approved by OMB Clearance No. 3150-0011 holder of an ESP may not make changes to the ESP n/a n/a n/a n/a n/a n/a Subtotal: Subpart A 0
0 0
$0
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr 52.45 - Burden covered under 10 CFR 52.46 and 52.47 an application for a DC may be filed even if an application for a CP or COL for such a facility has not been filed n/a n/a n/a n/a n/a n/a 52.46 - Burden covered under 10 CFR 50.33 (a) - (c) and 50.33 (j),
approved by OMB under Clearance No. 3150-0011 requires DC applicants to submit the information required by 10 CFR 50.33 n/a n/a n/a n/a n/a n/a 52.47(a), except (a)(6) & (a)(27) requires that a DC application contain a Final Safety Analysis Report (FSAR) 1 1
1 35,300 35,300
$9,813,400 52.47(a)(6) - Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 n/a n/a n/a n/a n/a n/a 52.47(a)(27) requires a DC application to contain a FSAR that describes the design-specific probabilistic risk assessment (PRA) and its results 1
1 1
45,400 45,400
$12,621,200 52.47(b)(1) requires that a DC application contain proposed inspections, tests, analyses, and acceptance criteria (ITAAC) 1 1
1 25,300 25,300
$7,033,400 52.47(b)(2) - Burden covered under 10 CFR 51.55, approved by OMB under Clearance No. 3150-0021 n/a n/a n/a n/a n/a n/a 52.47(c)(1) - Burden covered under 10 CFR 52.47(a) and 52.47(b) n/a n/a n/a n/a n/a n/a 52.47(c)(2) - Burden covered under 10 CFR 52.47(a) and 52.47(b) n/a n/a n/a n/a n/a n/a 52.51 - Burden covered under 10 CFR 52.47(a) n/a n/a n/a n/a n/a n/a 52.57(a) provides a procedure for application for renewal of a DC 0
0 0
10,000 0
$0 52.63(b)(1) - Burden covered under 10 CFR 52.7 n/a n/a n/a n/a n/a n/a Subtotal: Subpart B 1
3 106,000
$29,468,000 SUBPART B: STANDARD DESIGN CERTIFICATIONS (DCs)
NRC expects 1 new DC applications and 2 new DC renewal applications over the next 3 years. (3/3=1.0)
[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr 52.75 - Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.77 - Burden covered under 10 CFR 50.33, approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.79(a), except (a)(45) & (a)(46) addresses a COL application that does not reference any other type of Part 52 license, certification, or approval 0
0 0
58,420 0
$0 52.79(a)(45) - Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 n/a n/a n/a n/a n/a n/a 52.79(a)(46) requires a COL application to contain a FSAR that describes the plant-specific probabilistic risk assessment or analysis (PRA) and its results 0.67 1
0.67 54,000 36,180
$10,058,040 52.79(b) addresses a COL application that references an ESP 0
0 0
102,368 0
$0 52.79(c) addresses a COL application that references a design approval 0
0 0
46,460 0
$0 52.79(d) addresses a COL application that references a DC 0.33 1
0.33 31,460 10,382
$2,886,140 52.79(e) addresses a COL application that references a manufactured reactor licensed under Subpart F of 10 CFR Part 52 0
0 0
36,460 0
$0 52.79(b) & (d) addresses a COL application that references both an ESP and DC 0.33 1
0.33 26,560 8,765
$2,436,614 52.80(a) - 40,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> for applications which do not reference a DC application 0.33 1
0.33 40,000 13,200
$3,669,600 SUBPART C: COMBINED LICENSES (COLs)
NRC expects 1 new COL application over the next 3 years 5 COLs under construction; 0 COLs in operation NRC expects to receive a total of 2 All ITAAC Complete Notifications over the next 3 years (2/3=0.67) 1 new COLs referencing a DC application (1/3=0.33 responses/year) and 1 new COL referencing both ESP and DC applications (1/3=0.33 responses per year) (1/3=0.33) requires that a COL application contain the proposed inspections, tests, and analyses, i
l di th li bl t
10,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> for applications that do not reference a certified design 0.33 1
0.33 10,000 3,300
$917,400 52.80(b) - Burden covered under 10 CFR 51.50, approved by OMB under Clearance No. 3150-0021 n/a n/a n/a n/a n/a n/a 52.80(c) - Burden covered under 10 CFR 50.10(d)(3), approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.80(d) requires applicants for power reactor operating licenses under Part 52 to include in their applications information on the plan for implementing the requirements of 10CFR 50.155(b), and the requirement and planned locations of the equipment on which the strategies and guidelines will rely.
300 0
0 52.93(a) - Burden covered under 10 CFR 52.7 n/a n/a n/a n/a n/a n/a 52.93(b) - Burden covered under 10 CFR 52.39 n/a n/a n/a n/a n/a n/a 52.93(c) - Burden covered under 10 CFR 52.171 n/a n/a n/a n/a n/a n/a 52.99(a) requires licensees to submit to the NRC, no later than 1 year after issuance of a COL, a detailed schedule for completing the inspections, tests, or analyses in the ITAAC and provide updates to the ITAAC schedule every 6 months thereafter 5
2 10 20 200
$55,600 52.99(c)(1) requires that, after issuance of the COL, the licensee notify the NRC that the inspections, tests, or analyses in the ITAAC have been successfully completed and that the corresponding acceptance criteria have been met (ITAAC Closure Notification) 5 206 1030 40 41,200
$11,453,600 52.99(c)(2) requires that the licensee notify the NRC in a timely manner of new information that materially alters the basis for determining that either inspections, tests, or analyses were performed as required, or that acceptance criteria are met (ITAAC Post-closure Notifications) 5 3
15 20 300
$83,400 including those applicable to emergency planning, that the licensee shall perform
52.99(c)(3) requires that, if the licensee has not provided, by the date 225 days before the scheduled date for initial loading of fuel, the notification required by paragraph (c)(1) of this section for all ITAAC, then the licensee must notify the NRC that the inspections, tests, or analyses for all uncompleted ITAAC will be successfully completed and all acceptance criteria will be met prior to operation (Uncompleted ITAAC Notifications) 5 62 310 40 12,400
$3,447,200 52.99(c)(4) requires that the licensee to notify the NRC that all ITAAC are complete (All ITAAC Complete Notification) 0.67 1
0.67 8
5
$1,490 52.99(d)(1) & 52.99(d)(2) - Burden covered under 10 CFR 52.39 (variances) and 52.7 (exemptions) n/a n/a n/a n/a n/a n/a 52.103(a) requires that the licensee shall notify the NRC of its scheduled date for initial loading of fuel no later than 270 days before the scheduled date and shall notify the NRC of updates to its schedule every 30 days thereafter 5
2 10 10 100
$27,800 52.110(a) requirements for when a licensee has determined to permanently cease operations 0
0 0
20 0
$0 52.110(d) requires that, before or within 2 years following permanent cessation of operations, the licensee submit a post shutdown decommissioning activities report 0
0 0
3,000 0
$0 52.110(g) requirements following submittal of the post-shutdown decommissioning activities report 0
0 0
20 0
$0 52.110(h)(3) requires that within 2 years following permanent cessation of operations, if not already submitted, the licensee shall submit a site-specific decommissioning cost estimate 0
0 0
20 0
$0 52.110(h)(4) requirements for decommissioning activities 0
0 0
20 0
$0 Subtotal: Subpart C 6.33 1377.66 126,032
$35,036,885
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr 52.135 - Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.136 - Burden covered under 10 CFR 50.33(a) - (d) and 50.33 (j),
approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.137(a), except (a)(6) & (a)(25) requires that a design approval application contain a FSAR 0.33 1
0.33 42,000 13,860
$3,853,080 52.137(a)(6) - Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 n/a n/a n/a n/a n/a n/a 52.137(a)(25) requires a design approval application to contain a FSAR that describes the design-specific PRA and its results 0.33 1
0.33 54,000 17,820
$4,953,960 Subtotal: Subpart E 0.33 0.33 31680 8807040 Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr 52.155 - Burden covered under 10 CFR 50.30, approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.156 - Burden covered under 10 CFR 50.33(a) - (d) and 50.33(j),
approved by OMB under Clearance No. 3150-0011 n/a n/a n/a n/a n/a n/a 52.157, except 52.157(f)(9) & (f)(31) requires that a ML application contain a FSAR 0
0 0
50,000 0
$0 52.157(f)(9) - Burden covered under 10 CFR 20.1406, approved by OMB under Clearance No. 3150-0014 n/a n/a n/a n/a n/a n/a SUBPART F: MANUFACTURING LICENSES SUBPART E: STANDARD DESIGN APPROVALS NRC expects 1 new design approval applications over the next 3 years (1/3=0.33 responses per year)
NRC expects 0 new manufacturing license applications over the next 3 years.
52.157(f)(31) requires a ML application to contain a FSAR that describes the design-specific PRA and its results 0
0 0
54,000 0
$0 52.158(a) require that a ML application contain the proposed inspections, tests and analyses that the licensee who will be operating the reactor shall perform, and the acceptance criteria 0
0 0
30,000 0
$0 52.158(b) - Burden covered under 10 CFR 51.54, approved by OMB under Clearance No. 3150-0021 n/a n/a n/a n/a n/a n/a 52.171(b) - Burden covered under 10 CFR 50.90 & 50.91, approved by OMB under Clearance No 3150-0011 n/a n/a n/a n/a n/a n/a 52.177 contains requirements for renewal of an application for a ML previously issued by the NRC 0
0 0
10,000 0
$0 Subtotal: Subpart F 0
0 0
0 Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr IX.A.2 - Burden covered under 10 CFR 52.99(c)(1) n/a n/a n/a n/a n/a n/a X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0
0 0
0 0
$0 X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0
0 0
0 0
$0 X.B.3.c - Burden covered under X.B.1 and X.B.2 n/a n/a n/a n/a n/a n/a Appendix A Total 0
0 0
$0 NRC expects 0 applicants to reference the System 80+ Design Certification Rule over the next 3 years.
APPENDIX A: ABWR DESIGN CERTIFICATION RULE NRC expects 0 COL applicants referencing the ABWR Design Certification Rule over the next 3 years.
APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE NRC expects 0 COL licensees referencing Appendix A NOT under construction over the next 3 years.
NRC expects 0 COLs referencing Appendix B under construction over the next 3 years
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr IX.A.2 - Burden covered under 10 CFR 52.99(c)(1) n/a n/a n/a n/a n/a n/a X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0
2 0
8 0
$0 X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0
1 0
500 0
$0 X.B.3.c - Burden covered under X.B.1 and X.B.2 n/a n/a n/a n/a n/a n/a Appendix B Total 0
0 0
$0 Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr IX.A.2 - Burden covered under 10 CFR 52.99(c)(1) n/a n/a n/a n/a n/a n/a X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0
2 0
8 0
$0 X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0
1 0
500 0
$0 X.B.3.c - Burden covered under X.B.1 and X.B.2 n/a n/a n/a n/a n/a n/a Appendix C Total 0
0 0
$0 APPENDIX C: AP600 DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the AP600 Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix C under construction over the next 3 years
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr IX.A.2 - Burden covered under 10 CFR 52.99(c)(1) n/a n/a n/a n/a n/a n/a X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 9
2 18 8
144
$40,032 X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 9
1 9
500 4,500
$1,251,000 X.B.3.c - Burden covered under X.B.1 and X.B.2 n/a n/a n/a n/a n/a n/a Appendix D Total 9
27 4644
$1,291,032 Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr IV.A.2.a, c-h (Burden covered in 10 CFR 52.79) n/a n/a n/a n/a n/a n/a IV.A.2.b (Burden included in X.B below) n/a n/a n/a n/a n/a n/a X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0
0 0
0 0
$0 X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0
0 0
0 0
$0 X.B.3.a (Burden covered in 10CFR52.79) n/a n/a n/a n/a n/a n/a X.B.3.b (Burden covered in X.B.1, X.B.2) n/a n/a n/a n/a n/a n/a X.B.3.c(Burden in 10 CFR50.59(d) + 10CFR50.71(e) n/a n/a n/a n/a n/a n/a Appendix E Total 0
0 0
$0 Subtotal: Appendices A through E 9
27 4,644
$1,291,032
[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
NRC expects 0 COL applicants to reference the ESBWR Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix E NOT under construction over the next 3 years.
NRC expects 4 COL applicants to reference the AP1000 Design Certification Rule over the next 3 years.
APPENDIX E: ESBWR DESIGN CERTIFICATION RULE NRC expects 0 COL licensees referencing Appendix D NOT under construction over the next 3 years.
APPENDIX D: AP1000 DESIGN CERTIFICATION RULE NRC expects 5 COL licensees referencing Appendix D under construction over the next 3 years.
Section Description Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr IV.A.2.a (Burden covered under 10CFR52.79) (COL applicant) n/a n/a n/a n/a n/a n/a IV.A.2.b (Burden included in X.B below) (COL applicant) n/a n/a n/a n/a n/a n/a IV.A.2.c (Burden covered under 10CFR52.79) (COL applicant) n/a n/a n/a n/a n/a n/a IV.A.2.d (Burden covered under 10CFR52.79) (COL applicant) n/a n/a n/a n/a n/a n/a IV.A.2.e (Burden covered under 10CFR52.79) (COL applicant) n/a n/a n/a n/a n/a n/a IV.A.2.f (Burden covered under 10CFR52.79) (COL applicant) n/a n/a n/a n/a n/a n/a IV.A.3 (Burden covered under 10CFR52.79) (COL applicant) n/a n/a n/a n/a n/a n/a X.B.1 (COL applicant) requires COL applicants or licensees who reference this design certification to submit reports on departures from the plant-specific DCD.
0 0
0 8
0
$0 X.B.2 (COL applicant) requires COL applicants or licensees who reference this design certification to submit updates to its plant-specific DCD that reflect generic changes to and plant
specific departures from the generic DCD.
0 0
0 500 0
$0 X.B.3.a (Burden covered under 10CFR52.79) n/a n/a n/a n/a n/a n/a X.B.3.b (Burden covered under X.B.1, X.B.2) n/a n/a n/a n/a n/a n/a X.B.3.c (Burden covered under 10 CFR50.59(d) + 10CFR50.71(e))
n/a n/a n/a n/a n/a n/a Total 0
0 0
$0 APPENDIX F: APR1400 DESIGN CERTIFICATION RULE NRC expects 0 COL applicants to reference the APR1400 Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix F NOT under construction over the next 3 years.
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per
Response
Total Annual Burden Hours Estimate Annual Cost @ $278/hr Paragraph 2 requires that each COL application submitted pursuant to this appendix be submitted as specified in 52.75 and 10 CFR 2.101 and that each application state that the applicant wishes to have the application considered under 10 CFR Part 52, Appendix N 0
0 0
10 0
$0 Paragraph 3 requirements for what each application should include 0
0 0
40 0
$0 Paragraph 4 - Burden covered under 10 CFR 52.80(c) n/a n/a n/a n/a n/a n/a Subtotal: Appendix N 0
0 0
$0 Total Part 52 Reporting Burden 15.66 1,411 318,716
$88,603,037 APPENDIX N: STANDARDIZATION OF NUCLEAR POWER PLANT DESIGNS:
COMBINED LICENSES TO CONSTRUCT AND OPERATE NUCLEAR POWER REACTORS OF IDENTICAL DESIGN AT MULTIPLE SITES NRC expects 0 combined license applicants to use Appendix N over the next 3 years.
Applicant/Licensee Name Reporting Section 2021 2022 2023 NuScale DC application Subpart B A
AP1000 DC renewal application
- Subpart B N
N Oklo COL (non-LWR reactor)
- Subpart C N
N N
- Subpart C N
N N
Vogtle Unit 4 COL Subpart C & Appendix D Z
Summer Unit 2 COL Subpart C & Appendix D N
N N
Summer Unit 3 COL Subpart C & Appendix D N
N N
NuScale SDA application Subpart B N
N N
Bellefonte 1 COL Subpart C N
N N
For reporting purposes it is assume that each unit will submit a separate report Notes:
NOTE: Bell Bend, Callaway, Calvert Cliffs, Comanche Peak, Grand Gulf, Nine Mile Point, River Bend, Lee, Shearon Harris, and Victoria County COL applications are suspended or withdrawn; and therefore, have been removed from the table. Summer, Levy, and South Texas Project COLs were terminated at the request of the licensees; and therefore, have been removed from the table.
- = new application submitted during this reporting period N = license/permit/design certification not yet issued; A = license/permit/design certification issued; Z = initial fuel load Continue ITAAC complete notifications 12 per year until notification of all ITAAC met ANNUAL REPORTING BURDEN UNDER 10 CFR 52.99(a) 10 CFR PART 52 TABLE 3
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @
$278/hr 52.47 requirements for the contents of applications for the certification of a standard plant design 1
500 500
$139,000 Regulatory Guide (RG) 1.206, "Applications for Nuclear Power Plants" provides guidance on the format and content of applications and on the conduct of pre-application activities submitted under 10 CFR Part 52.
2 5000 10,000
$2,780,000 52.57(a)-renewals provides a procedure for application for renewal of a DC -
requires updating any of the information that was submitted under Sections 52.46 and 52.47 1
500 500
$139,000 52.63(b)(2) requires that licensees who reference a standard DC must maintain records of all changes to the facility 3
1,500 4,500
$1,251,000 52.63(c) & 52.73(b) requires applicants for CPs, OLs, or COLs who reference standard DCs, SDAs, or MLs to acquire or complete, and make available for audit, detailed design-related information normally contained in procurement, construction, and installation specifications 3
500 1,500
$417,000 Subtotal 10 17,000
$4,726,000 Recordkeepers under 52.63(b)(2) and 52.63(b) are noted as the same record keeper and are only counted once.
See Table 1 below for listing of the 20 recordkeepers.
TABLE 2 ANNUAL RECORDKEEPING BURDEN 10 CFR PART 52 NRC expects 3 new applications to be submitted over the next 3 years (3/3=1)
NRC expects 1 new DC renewal application to be submitted over the next 3 years. (1/3=0.33)
NRC expects there to be 3 COL licensees who reference a standard DC by the end of FY2023
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @
$278/hr X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 2
34 68
$18,904 X.A.2 - Burden covered under 10 CFR 50.71(e) n/a n/a n/a n/a X.A.3 - Burden covered under 10 CFR 50.59(d) n/a n/a n/a n/a X.A.4.a Requires the applicant for the amendment to the U.S. ABWR design to maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal) 1 1
1
$278 X.A.4.a Requires the applicant for the amendment to the AP1000 design to maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal) 1 1
1
$278 Appendix A Total 4
70
$19,460
[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
NRC expects 1 applicant to maintain records for the AP1000 Design Certification Rule over the next 3 years.
NRC expects 1 applicant to maintain records for the ABWR Design Certification Rule over the next 3 years.
APPENDIX A: ABWR DESIGN CERTIFICATION RULE
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @
$278/hr X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 0
34 0
$0 X.A.2 - Burden covered under 10 CFR 50.71(e) n/a n/a n/a n/a X.A.3 - Burden covered under 10 CFR 50.59(d) n/a n/a n/a n/a Section Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @
$278/hr X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 0
34 0
$0 X.A.2 - Burden covered under 10 CFR 50.71(e) n/a n/a n/a n/a X.A.3 - Burden covered under 10 CFR 50.59(d) n/a n/a n/a n/a APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE NRC expects 0 applicant to maintain records for the System 80+ Design Certification Rule over the next 3 years. (This certified design has expired)
APPENDIX C: AP600 DESIGN CERTIFICATION RULE NRC expects 0 applicant to maintain records for the AP600 Design Certification Rule over the next 3 years. (This certified design has expired)
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @
$278/hr X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 1
34 34
$9,452 X.A.2 - Burden covered under 10 CFR 50.71(e) n/a n/a n/a n/a X.A.3 - Burden covered under 10 CFR 50.59(d) n/a n/a n/a n/a Appendix D Total 1
34
$9,452 Section Description of requirement No. of Recordkeepers Burden Hours per Recordkeeper Total Annual Burden Hours Cost @ $278/Hr X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 1
34 34
$9,452 X.A.2 (Burden covered under 10CFR50.71(e))
n/a n/a n/a n/a X.A.3 (Burden covered under 10CFR50.59(d))
n/a n/a n/a n/a Appendix E Total 1
34
$9,452 APPENDIX E: ESBWR DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the ESBWR Design Certification Rule over the next 3 years.
APPENDIX D: AP1000 DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the AP1000 Design Certification Rule over the next 3 years.
Section Description of Requirement No. of Recordkeepers Burden Hours per Recordkeeper Total Annual Burden Hours Cost @ $278/Hr X.A.1(similar burden to 10CFR50.71(e)) (DCD applicant) requires that the applicant for this appendix shall maintain a copy of the generic DCD that includes all generic changes that are made to Tier 1 and Tier 2, and the generic TS and other operational requirements.
1 34 34
$9,452 X.A.2 (Burden covered under 10CFR50.71(e)) (COL applicant) n/a n/a n/a n/a X.A.3 (Burden covered under 10CFR50.59(d)) (DCD & COL applicant) n/a n/a n/a n/a X.A.4.a (DCD applicant) requires that the applicant for the APR1400 design shall maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal).
1 3
3
$834 X.A.4.b (COL applicant) requires that the applicant or licensee who references this appendix shall maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) throughout the pendency of the application and for the term of the license (including any periods of renewal).
0 3
0
$0 Total 1
37
$10,286 Total Part 52 Recordkeeping Burden 17 17,175
$4,774,650 Total Storage Cost
$1,909.86 APPENDIX F: APR1400 DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the APR1400 Design Certification Rule over the next 3 years.
Applicant/Licensee Name Recordkeeping Section NuScale DC application 52.47 AP1000 DC renewal application*
52.47 Oklo COL (non-LWR reactor)*
52.73(b)
52.47 and 52.63(c) & 52.73(b)
Vogtle Unit 3 COL 52.63(b)(2)
Vogtle Unit 4 COL 52.63(b)(2)
Summer Unit 2 COL 52.63(b)(2)
Summer Unit 3 COL 52.63(b)(2)
NuScale SDA application 52.47 ABWR DC Renewal 52.47 Bellefonte 1 COL 52.73(b)
Notes:
For reporting purposes it is assumed that each unit will submit a separate report.
TABLE 1
Hours Responses Reporting 318,716 1,411 Recordkeeping 17,175 17 Total 335,891 1,428 Burden Totals Part 52 Renewal