ML20010G316
| ML20010G316 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/11/1981 |
| From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| JPN-81-69, NUDOCS 8109150582 | |
| Download: ML20010G316 (2) | |
Text
n POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMeus CIRCLE N EW '.' JRK. N. Y.10019 4212) 397 6200 GEORGET. ERRY oranatihe orrican TRUSTEES E Ecu vr v cs C A MA
"'=:::.':::,'::s G EORGE L. ING ALLS JOSEPH R. SC IEDER vac t CMainMAN PasstDENT e CMIE, RICH ARD M. FLYNN LEROg,.,S,in cug,_
RO err r wiLLOwn September 11, 1981 1,*,"#." " ' "* '
rREDERicx R. cuRic JPN-81-69 THOM AS R. FREY
- =:=='"'
,Ci n '.
Director of Nuclear Reactor Regulation
['
U.S.
Nuclear Regulatory Commission
,, p i t.
{
Washington, D.C.
20555 4 1961 3
Attention:
Mr. Thomas A.
Ippolito, Chief
,,, I,
~
Orarating Reactors Branch No. 2 5,
Mrsc'* cost Division of Licensing j-w u
Subject:
James A. FitzPatrick Nuclear Power Plan to p N' Docket No. 50-333 BWR Scram Discharge System Air Dump Modification
References:
1.
NRC Order for Modification cf License Concerning BWR Scram Discharge Systems dated January 9, 1981 2.
- Letter, D.G.
Eisenhut to all BWR Licensees, dated October 1, 1980 3.
- Letter, J.P.
Bayne (PASNY) to T.A.
Ippolito (NRC) dated October 24, 1980 (JPN-8 0 -4 8 )
4.
- Letter, J.P.
Bayne (PASNY) to T.A.
Ippolito (NRC) dated December 16, 1980 (J PN-8 0 -57 )
5.
- Letter, J.P.
Bayne (PASNY) to T.A.
Ippolito dated May 13, 1981 (JPN-81-35)
Dear Sir:
The purpose of this letter is to inform you of the Power Authority's compliance with the Order for Modification of Licenre dated January 9, 1981 (Reference 1).
This Order imposed, as a license condition, a requirement for tne installation of an air dump modification by April 9, 1981.
This modification would automatically scram the reactor on low pressure in the Control Rod Drive System control air header.
Accordingly, the Power Authority installed an air dump nodification within the specified time limit.
f0DI 8109150582 810911 PDR ADOCK 05000333 P
o
- The Power Authority has also undertaken a review of scram discharge system reliability as required by Reference 2.
As a result of this review, the Authority intends to implement long-term modifications to tne JAFNPP, as previously described in References 3, 4 and 5.
These modifications will incorporate a design which:
is similar to tne design of plants for which tne NRC did not require an air dump modification; and, will render the air dump modification unnecessary.
Therefore, upon completion of the 1cng-term modifications, tha Powar Authority intends to remove the air dump modif,ation.
Accordingly, tne Power ?.athority requests that the January 9, 1981 Order for the Modification of License of the FitzPatrick plant be amended to permit removal of the air dump modifica ion contingent upon completion of the long-term modifications described in Refercnces, 3,
4 and 5.
If you have any further questions on this matter, please contact us.
Very truly yourn,
/
J -
ayne Senior Vice President Nuclear Generation l
cc:
Mr. J.
Linville Resident Inrpector U.S. Nuclear Regulatory Commission r
P.O. Box 41 i
l Lycoming, New York 13093 1
i I
m.