Notifies That Procedural Mods to Comply w/NUREG-0612,control of Heavy Loads,Being Prepared & Will Be Completed Prior to Oct 1981 Refueling Outage
ML20010A736
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/07/1981
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0612, RTR-NUREG-612 JPN-81-58, NUDOCS 8108120138
Download: ML20010A736 (2)


Text

<

POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMaus CIRCLE NEW YORK. N. Y.10o19 (212) 397 6200 GEO GE Y. B ERRY OPERATING OF FIC E R TRUSTEES JOHN W. BOSTON JOHN S.DYSON E DE a RECTom F power oPER4nONS G EORGE L. LNG ALLS JOSEPH R. SCHMIEDER vlC E CMalRMAN PRESIDENT & CHIEF CICHARD M. FLYNN ROBERTl. MILLONZ3 LEROY W. SINCLAIR GC EF Fi LN A F R E D E RIC K R. CLARK sENIO V CE PREBf DENT h GENERAL COWNSEL August 7, 1981 JPN-81-58 Director of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission 4 C['

l Washington, D.C.

20555 y

Attention:

Mr. Thomas A.

Ippolito, Chief

. ] AUG 121981

  • 8 Operating Reactors Branch No. 2 2_

Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Pla Docket No.50 333 8

Control of Heavy Loads NUREG-0612

.,g

Reference:

1)

PASNY letter J.P.

Bayne to T.A.

Ippolito dated May 18, 1981 (JPN-81-37) 2)

NRC letter D.G.

Eisenhut to All Operating Reactors dated December 22, 1981 3)

PASNY letter J.P.

Bayne to T.A.

Ippolito dated July 17, 1981 (JPN-81-5 2)

Dear Sir:

In Reference ', the Authority indicated that a review of the FitzPatrick facility practices for handling heavy loads was being conducted in accordance with Reference 2.

This review has shown that many of the staff positions in enclosure 2 to Reference 2 are adequately addressed by existing plant procedures and administrative controls.

In addition, based on this review, the need for these certain procedural modifications in order to fully comply with this position have been identified.

The necessary procedures are under preparation.

It is expected that this effort will be completed prior to the next refueling 8108120138 slos67 '

~

PDR ADOCK 05000333' L 4sk PDR'

. outage tentatively to begin on October 1981.

Implementation of the procedural changes prior to the refueling outage will ensure that the measures necessary to comply with the interim actions are in place before making the heavy lift associated with the refueling operation.

Until such time as when these procedures are imple-mented, any heavy loads will be handled as previously indicated in Reference 3.

If you have any questions, please do not hesitate to contact the office.

Very truly.yours,

/

./ t

. bBa e-Senior Vice resident Nuclear Generation i

l lu I

i

. _. _ _, -.. _ - -...., _. - - _ ~ _,.... - -,..., - - -,

_. - - - -.