05000287/LER-1981-013-03, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room

From kanterella
(Redirected from ML20009G087)
Jump to navigation Jump to search
/03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room
ML20009G087
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/26/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009G079 List:
References
LER-81-013-03L, LER-81-13-3L, NUDOCS 8108030315
Download: ML20009G087 (1)


LER-1981-013, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room
Event date:
Report date:
2871981013R03 - NRC Website

text

'

8 NaC POmas ses.

U.SNur"t ram CECULATORY cOhanetssaces (7 777 LICENSEE EVENT REPORT EXNIBIT A cONTRCt. St.QcX: l l

l l

l l

l (ptgAss PMINT CA TYPE ALL AECUIREO INPORMATICNI i

lo t i l is I c l N ! F I El 3I@is0101-I 0101 olo 10 l-10101@ 4l li t 11 l 11@

l Ig a e ucansascaos i4 vcansa mmasa

?

m ucansa rves a u c.ar w corr i

loIii S 1 @ l0 I5 l0 l0 l0l 2l 8l 7 @ l0 l512I8l 8l 1@l0 l 6 l 2l 6l 8l 1l@

I 8

64 Dock Er,,waneest Evtar QArt 74 TS mePoar QArt se EVENT DESCRIPTION ANO PRCSAst.1 CONSEQUENCES h totall on May 28, 1981, a 1-inch breach in a 3-hour fire barrier was oiscovered in the ;

i N l floor of the Unit 3 Control Room inst outside of the Shift Supervisor's office. I lotalI Due to tiie low combustibility _of materials, the small size of the breach, and the; [TTi"1 I smoke detectors located on both sides of the breach, the possibility of a fire t o is I l n,yo,dina vn-erv low Additionally. the Contr71 Room is continuousiv manned. l E I Therefore,'this incident was of no significance with respect to safe operation, r i o is i I

,na ebn kn,1rb nnd 9,forv of ebo nublic were not affected, f

sysru.ns caus.e

cause

c v

,v,

.u.a.sst.

coo coo e

,r=oo.

co ioi.i l AI Rl@ l Xl@ l Z l@ l Xl Xl Xl Xl M X l@ l Zl@ lZ l @

i.

n i2 i.

i.

m "ae*ro"a?">A "cSU"'"

"W uni ave =r m a

@ g,oi 18 l11 l-l f o l l i 31 [f

10131 lLI H

10l c

_n

z r.

2+

a 2

2

s a

n EE E cEE W

^UllU N"[

,o 7m. u "ET C.*.u*Uc";TT.,

.<ws

[ l@

((@

l

[

f O! O!0 l l

( Y lg l Nlg lx l9 l9 l 9 cAuss cascNirncN Ana ccaneenve AcTie:w @

t, t oj l The cause of this incident cannot be clearly defined because the breach had been, IT"ITT I covered since construction of tae Unit 3 Control Room.

The breach was a g

m I threaded nine sleeve.

The threads were chased with a 1-inch pipe die to clean i

m I them.

Two 1-1.ch pipe plugs were then installed to seal the barrier. The ii64 I nenetration will be niaced on inspection procedure MP/0/A/3020/05.

y as

'=

o,,.r. - @ =r.=

_, o c.,,,,,,, g Ii45j d @ l1l 0-l 0(@ l NA l~ lA gl Operator Observation l

7 8 M $ruser l i i e l [,,y,,,[ @ kgl

- ro..crnarv @ l
- r,o,.

..u

.ue== o u-NA l

NA l

8 a

  • It!?!l010lO h Zl@f.Sc rio, @ NA rm l

,,,,d' u!Ess se

..sem,rion@

=unse.a l.J.J.s_jl0l0l0!@l NA l

r e e n

i2 l t i s l W@Ys2n'f,'E '"** @

Es

  • l NA l

1 i.

N AC US CNk?

,25u t i%

12 i o l l. 61 NA l

lIfIl!III!!I l r

a e io u..

Naase ca eRePAman J.

L.

Jones (704) 373-8197 rwena:

8108030315 810626 PDR ADOCK 05000287 l

5 PDR