January 10, 2020 MEMORANDUM TO:
Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM:
Jennivine Rankin, Project Manager /RA/
Vogtle Project Office Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON DECEMBER 19, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on December 19, 2019. The purpose of the meeting was to discuss SNCs Request for Alternative Vogtle Electric Generating Plant (VEGP) 3&4-IST-ALT-01, Alternative Requirements for Inservice Test Interval Code Edition, Unit 4, and a proposed license amendment request regarding the core makeup tank boron concentration.
The meeting notice can be found in Agencywide Documents Access and Management System (ADAMS) Accession No. ML19294A080. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The other documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:
VEGP 3&4-IST-ALT-01: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 ML19304C432 Discussion Topics for VEGP 3&4-IST-ALT-01 ML19340A072 Slides for Core Makeup Tank Boron Concentration Surveillance Requirement ML19347A394 CONTACT: Jennivine Rankin, NRR/VPO (301) 415-1530
V. Hall Summary of Meeting:
Technical Discussion VEGP 3&4-IST-ALT-01: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 On December 19, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss VEGP 3&4-IST-ALT-01. The discussion is summarized below:
SNC used the 2012 Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants in lieu of other available options because the preservice testing for Units 3 and 4 use the 2012 Edition. This would allow for a smoother transition between preservice testing and inservice testing (IST).
SNC noted that with the current information, it is targeted that Unit 3 will have a 10 year initial IST interval and Unit 4 will have a 9 year IST interval, as the proposed alternative does not affect the interval requirements for Unit 3.
SNC noted that with its lessons learned, they do not anticipate that Unit 4 fuel load will be significantly delayed. Should a delay occur, SNC noted that they would consider a new alternative request.
At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.
Technical Exchange on Core Makeup Tank (CMT) Boron Concentration Surveillance Requirement On December 19, 2019, staff from the NRC conducted a public meeting with representatives from SNC on a proposed license amendment request (LAR) regarding the CMT boron concentration surveillance requirement. The discussion is summarized below:
SNC explained that frequent sampling of the CMT causes the CMT to be diluted by the makeup from the reactor coolant system (RCS) at each sampling.
SNC is considering changing the frequency of boron sampling from once every 7 days (Surveillance Requirement 3.5.2.5) to a conditional frequency where various indications are monitored.
SNC noted its supporting analysis has not been finalized.
The NRC staff noted that the LAR should explain the different leakage pathways including the various valves and sample lines and how the leakage from the CMT would be detected. The staff also stated that dilution via diffusion of the higher concentration boron in the CMT to the RCS cold leg should be considered. In addition, the staff noted the possibility of slow leaks which may not be detected by the technical specification for RCS leakage, or other means.
The staff noted that the potential leakage paths and the dilution of boric acid due to diffusion into the RCS should be evaluated to determine the minimum rates that can be reliably detected. The evaluation should assume leakage and diffusion at the detectable limits to demonstrate that excessive dilution of boron in the CMT cannot occur when the conditional sampling frequency methodology is developed.
The NRC noted that moving from a 7-day frequency for verification of the boron concentration in the CMT to a conditional frequency may result in a more intensive NRC review if there is no reasonable frequency backstop.
V. Hall At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.
Docket Nos.: 52-025 52-026
Enclosure:
As stated cc See next page
- via e-mail NRC-001 OFFICE PM: NRR/VPO LA: NRR/VPO PM: NRR/VPO BC: NRR/VPO NAME JRankin* (c)
RButler*
TSantos*
VHall*
DATE 1/9/20 1/9/20 1/9/20 1/10/20 OFFICE PM: NRR/VPO NAME JRankin (s)
DATE 1/10/20
AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Thursday, December 19, 2019 Teleconference 9:00 a.m. - 12:00 p.m.
PURPOSE:
To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
OPEN Time Topic Led By 9:00 a.m.
Opening Remarks NRC 9:10 a.m.
Discussion of Identified Topics NRC/SNC Opportunity for Public Comment Open Portion Concludes NRC/Public CLOSED.
12:00 p.m.
(If needed)
Adjourn NRC/SNC
PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, December 19, 2019 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.
List of Attendees Name Organization Representing the Nuclear Regulatory Commission Jennivine Rankin Don Habib Vic Hall Mike King Tanny Santos NRR/VPO Nicholas Hansing NRR/DEX Steven Bloom Matt Yoder*
Tony Gardner NRR/DNRL John Budzynski Becky Karas Joshua Miller*
Steven Smith Vic Cusumano Ryan Nolan NRR/DSS Representing Industry Jennifer Harrelson*
Chris Pendleton*
Mark Wilson*
Jerri Byers*
Eddie Grant*
Michael Elmer*
Dan Williamson*
Adam Quarles*
Amy Chamberlain*
Ryan Henderson*
Southern Nuclear Operating Company Zach Harper*
Remington Iddings*
Westinghouse Electric Company
- = participated via teleconference
Vogtle Mailing List Revised 11/12/2019) cc:
Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)
Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak)
Page 2 of 3
Vogtle Mailing List sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)
William.Birge@hq.doe.gov (William Birge)
X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)
X2hagge@southern.com (Neil Haggerty)
X2wwill@southernco.com (Daniel Williamson)
Page 3 of 3