Interim Deficiency Rept Re Improper Nondestructive Exams, Initially Reported on 810126.Upon Completion of Investigation,Util Will Determine Reportability Under 10CFR50.55e.Next Rept Will Be Forwarded by 810327
ML20003C823
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 02/23/1981
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, SBN-152, SBU-42515, NUDOCS 8103180510
Download: ML20003C823 (1)


Text

.

PUBLIC SEAVICE SMOK STATION snyn ing ome.:

Compartyof New Hampshw e 1671 Worcest.r Road Frondnaham, Massachusetts 01701 (617). 872 8100 February 23, 1981 SBN-152 Ref SBU-42515 Y

1 T.F. Q 2.2.2 gr

=

7 WG 1 U.S. Nuclear Regulatory Commission gs#

Region I 631 Park Avenue 9

, gt King of Prussia, Pennsylvania 19406 y

i Attention: Office of Inspection and Enforcement

Reference:

1.

Docket No. 50-443 and 50-444 2.

Telecon of 1/26/81 between L. Narrow and John DeVincentis YAEC

Subject:

Potentially Reportable 10 CFR 50.55 (e) Interim Report on Improper Non-Destructive Examination:3

Dear Sir:

On Monday January 26, 1981 I reported a potentially significant deficiency associated with improper non-destructive examinations that we consider a potentially reportable item under 10 CFR 50.55 (e). This interim report is being filed in accordance with the thirty day reporting requirements of 10 CFR 50.55 (e).

An investigation is in progress at the Seabrook site to determine if a significant deficiency exists for this item. The investigation is scheduled to be completed by March 27, 1981. Upon the completion of the investigation, an evaluation will be conducted to the criteria of 10 CFR 50.55 (e) to determine if a significant deficiency exists. At that time we will eitner verbally inform you that a significant deficiency does not exist, or a formal report in accordance with the requirements of 10 CFR 50.55 (e) will be submitted.

We consider this item to be a potentially reportable item until completion of the testing and evaluation program.

  • ~

Very truly ours, S../7 o

John DeVincentis Project Manager 3

JDV: tan l

1 cc: Director of Inspection and Enforcement USNRC, Washington, DC 20555 8103180510