ML19351F746

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Rod Drop Analysis,Originally Reported 791213.Westinghouse Topical Rept Incomplete & Unavailable Until Second Quarter 1981.Final Deficiency Rept Expected to Be Submitted by Jul 1981
ML19351F746
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/16/1980
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19351F742 List:
References
10CFR-050.55E, 10CFR-50.55E, SBN-143, NUDOCS 8102200033
Download: ML19351F746 (1)


Text

.

N 6

PUBLIC SERVICE Comperyof New%

SEABROOK STATION Engineering OfRce:

20 Turnpike Road December 16, 1980 Westborough, MA 01581 SBN-143 T.F. Q 2.2.2 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement

Reference:

1.

Docket No. 50-443 and 50-444 2.

Telecon of 11/16/79 between Joseph Mattia NRC and David Maidrand YAEC 3.

Westinghouse letter dated 11/15/79 to John G. Davis NRC 4.

Westinghouse lett.er No. NS-TMA-2167 dated 11/28/79 to A.T. Schwencer NRC 5.

Public Service Company of NH letter No. SBN-109 dated 12/13/79 to NRC I&E 6.

Public Service Co of NH letter No. SBN-131 dated 8/21/80 to NRC I&E

Subject:

10 CFR 50.55 (e) Interim Report on Rod Drop Analysis

Dear Sir:

Reference 5 was submitted in accordance with the requirements of 10 CFR 50.55 (e) and identified a deficiency in the rod drop analysis.

That interim report made a commitment to review the Westinghouse prepared topical report, which was to be prepared by mid 1980, and submit a final report on the rod drop analysis to you by 8/28/80.

Reference 6 was submitted to notify the NRC that because l

Westinghouse had not yet submitted a topical report, we were unable to provide a final report.-

Westinghouse has again notified us that the topical report is not complete

(

and will not be available for our review until the second quarter of 1981.

We now expect to have a final report to you on this subject by July, 1981.

Very tniy yours,

,M John Devincentis Project Manager DAM: tan 810 220 0 OW xo