ML19343C440
| ML19343C440 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/19/1981 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19343C441 | List: |
| References | |
| 81-60, NUDOCS 8103240213 | |
| Download: ML19343C440 (1) | |
Text
- _ _
BOSTON EDISON COMPANY acur=*t omcca eco sortavou stance SD STO N. M AS S&CMue stTo 0219 9 N
A. *. M o Riss r
- .ANAGER h.
k f' NUCLEAR OPERA'.oNE EUPPoRT oEPARTMENT N
j
,j %$* ~5 {A os5
.I p
,, n g,q 1 March 19,1981 jS BECo. Ltr. #81-60 Mr. Boyce H. Grier Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.
19406 License No. DPR-35
- Docket No. 50-293 Radioactive Effluent Release Report July 1 through Decerber 31, 1980
Dear Sir:
In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.C.1, Boston Edison Company hereby submits 2 copies of the Pilgrim Nuclear Power Station Radioactive Effluent Release Report. The reporting period is from July 1,1980 through December 31, 1980.
- The report format and content are in accordance with NRC Regulatory Guide 1.21:
MEASURING, EVALUATING, AND REPORTING RADI0 ACTIVITY IN SOLID WASTES AND RELEASES OF RADI0 ACTIVE MATERIALS IN LIQUID AND GASE0US EFFLUENTS FR0l1 LIGHT-WATER COOLER NUCLEAR POWER PLANTS, Revision 1, Tables 1A, IB, IC, 2A, 28, 3, 4A 4A-2 and Supplemental Information.
Very truly yours, jf.wN+
(2 copies) cc: Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 (6 copies)
Commonwealth of Massachusetts Director, Executive Office of Manpower Affairs Dept. of Labor and Industries Division of Occupational Hygiene 39 Boylston Street (9th floor)
Boston, MA..
02116 (1 copy)
. :810 3 2 4 0Slk 4 k
s I_