ML19340C277

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Defective Cooling Tower Concrete Beams,Initially Reported on 801008.Testing Is in Process to Determine If Significant Deficiency Exists & Will Be Completed by 810216
ML19340C277
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 11/06/1980
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, SBN-138, NUDOCS 8011140403
Download: ML19340C277 (1)


Text

hj U PUBLIC SERVICE

's Companyof NewHampshere SEA 8 ROOK STATION Engineering Office:

20 Tumpike Road November 6, 1980 Westborough, MA 01581 SBN-138 T.F. Q 2.2.2 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of ' russia, Pennsylvania 19406 m

Attention: Office of Inspection and Enforcement

Reference:

1.

Docket No. 50-443 and 50-444 2.

Telecon of 10/8/80 between J.

Mattia NRC and John DeVincentis YAEC

Subject:

Potentially Reportable 10 CFR 50.55 (e) Interim Report on Cooling Tower Concrete Beans

Dear Sir:

Cn Wednesday October 8, 1980 I reported a construction deficiency associated with the cooling tower concrete beams that we consider a potentially reportable item under 10 CFR 50.55 (e).

This interin report is being filed in accordance with the thirty day reporting requirements of 10 CFR 50.55 (e).

Testing is in progress to determine if a significant deficiency exists for this item.

The testing is scheduled to be completed by 2/16/81. Upon the comple-tion of testing, an evaluation will be conducted to the criteria of 10 CFR 50.55 (e) to determine if a significant deficiency exists. At that time we will either verbally inform you that a significant deficiency does not exist, or a formal report in accordance with the requirements of 10 CFR 50.55 (e) will be submitted. We consider this item to be a potentially reportable item until ecmpla* inn of the testing and evaluation program.

bec's:

Very truly yours, BBBecklev g7

/

ACCerne Q/_ g FEGreenman John DeVincentis WAHarvey Project Manager JHHer-in j/

JRHoffman JDV.

n DNMerrill cc: Director of Inspection and SRMiller Enforcement WJMiller US NRC, Washington, DC 20555 RPPizzuti Projects Repes & Gray

,7((y JWSingleton I

WBSturgeon

',, I G5 Thomas UE&C and 'd (SB-104; 5

sesn u yo3