ML19323H612
| ML19323H612 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim, Surry |
| Issue date: | 06/02/1980 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| 80-102, NUDOCS 8006130280 | |
| Download: ML19323H612 (1) | |
Text
.
BasTON EDISON COMPANY GENER AL orrects 300 BOYLETON STREET 90sTON, M A55ACMuSETTs 02199 G. CASL AMOOSNING su PE Rf NTEMOEN T NuCLEAN OPER ATIONS DEPAATMENT June 2, 1980 BECo. Ltr. #80-102 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Conzilssion Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293 Sub: Schedule for Review of Generic DC Power Source Failure Analysis Ref: Letter to G. C. Andognini from T. A.
Ippolito "Effect of a DC Power Supply Failure on ECCS Performance" dated April 25, 1980
Dear Sir:
The purpose of this letter is to provide you with the schedule for ottr response to the referenced letter. We have initiated an evaluation of the GE study "DC Power Source Failure for BWR/3 and 4" to assure that the systems combinations assumed in this generic analysis are conservative for Pilgrim Unit #1. We expect to transmit the results of our evaluation to you by August 1, 1980.
Should you have any questions or concerns relative to this schedule please do not hesitate to contact us.
Very truly yours, s
//0 8006180 2 $()