Forwards Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Review Process Is Almost Complete.Problems Exist in Obtaining Info from Vendors.Unit Is Shut Down for Refueling
ML19323D536
Person / Time
Site: Pilgrim
Issue date: 04/22/1980
From: Andognini G
BOSTON EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
80-77, IEB-79-01B, IEB-79-1B, NUDOCS 8005210649
Download: ML19323D536 (224)


Text

-

8 005210 M f*

BOSTON EDISON COMPANY oE=E=Aa. arricEs eco eOvtsTOu sT=Ec7 eOSTON. M ASEACHU BETTE O 219 9

a. cA=6 A=OOamiN.

SU PE Nf MTENDENT NUCLEAR OPERAftONS DEPAWTMENT April 22,1980 BECo Ltr. #80-77 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.

19406 License No. DPR-35 Docket No. 50-293

Reference:

1) BECo Ltr. #80-50 to NRC; March 12, 1980

Attachment:

1) Pilgrim Unit #1 - IE Bulletin #79-01B -

90 Day Response

Dear Sir:

By letter received January 17, 1980 Boston Edison was required by the NRC to address IE Bulletin 79-01B. This Bulletin requested two responses, a 45 day and a 90 day, with information as requested by Enclosure 1 of the Bulletin.

Reference 1) and its attachment provided our 45 day response.

In Attachment 1 to this letter Boston Edison is providing its 90 day response for Pilgrim Station. We have been unable to supply all the information requested by the NRC at this time.

Reference 1) outlined 3 priority levels for equipment:

I - Equipment inside containment II - Equipment outside containment located in compartments where pipe breaks occur.

III - Equipment outside containment located in adjacent compartments which experience reduce! effects of these pipe breaks.

For each of these categories a review process was established which involves each of the following:

~

A.

Listing of systems and equipment required to function.

B.

Development of hostile environmental profiles.

a

,. e

~.

BOOTON EDICON COMPANY Mr. Boyce H. Grier, Director April 22, 1980 Page 2 C.

An initial review of equipment capabilities to quickly identify com-ponents which may not be capable of functioning in the hypothesized environments.

D.

A formal review of equipment to ve 1:y and document equipment capabilities in these environments.

E.

Verification as necessary, of actual installations.

F.

Further review of equipment to identify components and materials susceptible to significant aging.

The status of the work progress to date is as follows:

- For Priority I (Equipment inside containment) Categories A, B, C, D and E are essentially complete.

- For Priority II and III Categories A, C, D and E are essentially complete.

Boston Edison will provide its next submittal by July 25, 1980.

Reference 1) generically discussed the difficulties in acquiring information for Pilgrim equipment.

Boston Edison resources have been distributed among numerous short term activities including refueling outage work and NUREG-0578 modifications. Vendor resources have become strained by similar requests for information from other utilities. For older vintage plants, such as Pilgrim, vendors must search both their own plus subvendor records which may be over 10 years old.

In many cases this work required Boston Edison to issue purchase orders for these searches.

As you are aware Pilgrim Unit #1 is presently in a refueling outage.

The information presented in Attachment I references equipment which we believe will be inservice at the completion of this outage.

If, due to scheduling, activities are not completed or dditional activities are undertaken which affect the information contained herein we will ammend the enclosure with a clarifying letter to the NRC.

s C ETON ETII'ON COMPANY Mr. Boyce H, Grier, Director April 22, 1980 Page 3 Boston Edison believes that the quality of the information to be provided and the confidence level we..

all place on these reviews are directly related to the thoroughness of these evaluations, We believe the content of our responses to date under 79-01 and 79-01B indicates our commitment to reporting and rectifying any conditions which. our reviews indicate may in-volve unqualified equipment, Very truly yours, j

,an Attachments Commc wealth.of Massachusetts)

County of Suffolk l

e then personally appeared before me G Carl Andognini, who, being duly sworn, did state that he is Superintendent - Nuclear Operations Department of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My Commission expires:

h, 4v

)7,)yg{

Notary Public

/

cc:

Director United States Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operation Inspection Washington, D. C.

20555