O OPERATING DATA REPORT i>OCKET NO.
50-293 DATE 6/11/80 COMPLETED BY G.G. Whitney TELEPHONE 617-/4o-/900 OPERATING STATUS PILGRIM I Notes
- 1. Unit Name:
- 2. Reporting Period:
May, 1980 1990
- 3. LicensedThermalPower(MWt):
678.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
655.
- 6. Maximum Dependable Capacity (Gross MWe): 690.
- 7. Maximum Dependabic Capacity (Net MWe):
670.
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NONE
- 9. Power Level To Which Restricted,If Any (Net MWe):
NONE
~
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr..to.Date Cumulative 744.0 3647.0 65543.0 11.' Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 351.9 448.0 45428.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On Line 268.2 364.3 43916.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 328056.0 509208.0 73600320.0
- 17. Gross Electrical Energy Generated (MWH) 108530.0 169870.0 24334704.0 103884.0 162744.0 23368867.0
- 18. Net Electrical Energy Generated (MWH)
.... 19. Unit Service factor 36.0 10 0 67.0
- 20. Unit Availability Factor 36.0 10.0 67.0 20.8 6.7 53.2
.. 21. Unit Capacity Factor (Using MDC Net) 21.3 6.8 54.4
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 8.9 6.7 10.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units Ii Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY -
COMMERCIAL OPERATION 8 0 0 618 0 TT(r
(
("/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-293 PILGRIM I
- t. NIT 6/11/80 DATE COMPLETED BY G.G.Wi tnev 617-746-7900 TELEPHONE MONTH
~
~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) -
0.
0.
1 g7 0.
13 0.
0.
22.
3 39 0.
0.
4 20 I
0.
21 184.
g 0.
323.
6
,2 7
0.
23 406.
0.
507.
i 8
34 0.
25 427.
9 0.
TO 25 323.
0.
333.
g; g,
O.
,3 147.
0.
412.
13 39 O.
498.
O.
M.
gg 33 16 0.
INSTRUCTIONS On this format. list the ave sge daily uni: power leve!in MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.
(o/77)
,,_.y,y,.
._,-,__me-my
DOCKEINO.
50-293 UNIT SilU'IDOWNS AND POWiiR REDilCTIONS UNIT N AME Pilerim I
' 6/ IT780 DATE REI' ORT MON'III May, 1980 CObtPLETED BY G.C.Wh1tney TELEPilONE 617-746-7900
-w I
re.
.$E 3
Licensee h
vt Cause & Cursective e
No.
Date g
gg y
.3 g 5 Event gy al Action to
$E 5
3 5 c:
Repoit #
uib gu Paesent Recussence 6
g u
e.
O I
80/01/05 S
449.7 C
2 N/A RC FUELXX N.A.
I 2
80/05/19 F
26.1 A
3 N/A IIA XXXXXX Reactor scram due to low water 9 vel caused by erratic cperation of turbine EPR.
3 80/05/26 F
0.0 11 4
N/A IIG DEMINX liigh D/P across condensate demin-eralizers due to rust buildup in lines during outage.
I 2
3 4
F: 1:orced Remon:
hic hod:
Exhibit G -Instructions S: Sc heiluted A Eituipmens Failure (lixplain) 1 hlanual for Picparation of Data ll-Maintenance ni Test 2 klanual Scram.
Entsy Sheets foi 1.icensee C-Hefueling 3 Automatic Sciam.
Event Report 11.E11) File INilRI G-D-Itegulatoiy itestriciion 101hes ( Explain) 0161) li Operator Training & license lixaminacion F Atiministrative 5
G Opciational lisios (lixplain)
Estubit I Same Sousce (9/77) 11 Other (Explain)
_ =.
PILGRIM NUCLEAR P0llER STATION Month May, 1980 M IOR SAFETY RELATED MAINTENANCE 4
'3YSTEM CC::?CNENT -
MALFUNCTION CAUSE MAINTENANCE
- CORRECTIVE ACTION 2
ASSOCIA N 1 en vmiret neerinnpocr
~.-
Modified with new l~
2HSRV.
N/A.
N/A top works PDCR N/A N/A 8024 23 HPCI Swing Failed leak test Bad seat' Lapped seat re-N/A.
.N/A Check 2301-45 paired 23'
-lIPCI Stop
. Failed leak test Bad seat Lapped seat' re-N/A N/A Check 2301-74 paired.
' 3:
Various IICU's Will not meet insert Replaced solenoid or withdraw time internals, cleane' N/A N/A filters, checked
. needle valves.
i e
w G
e G
8 0
e
9 -
i BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summary of Operations for May, 1980 The unit was placed on line on 5/19/80 af ter completion of the Refueling Outage. Due to a problem with the turbine speed control it was removed from service.
The unit was again placed on line on 5/21/80 and has been operating at a reduced power level due to condensate demin D/P.
1 f
o 3... u..'.i C
.'.rv. o ?.."_i.. _. ':
4 g 4 A _, n. g _ __ g.,.s..e _, _s _,_
_o _ :o _. :2._< _ _ _o g a _. _, _; e;_ < _
.u..g u__..,,
c_._. as a
cquested is a le::e
=c Mr. G. C. Andos=1:1 da:ed Januar7 15, 1978:
Icr your ce:ve=dence, the inic =atics supplied has been e=u= era:ed so :ha:
~
cach su=her cc::ssponds to equivale : so tatics utilized i= the reques:.
.3.e,a a o.e
_. _4 s.ea c __t _< __; 4.s 2 4_, g. '__ '.iu _'_ ea. '. -ve. S -a-._' _- _, n.e cke. '.To.
a 50-293.
2.
Scheduled da:e for sex: Refueli=g Shu:d wn: Sep e ber, 1981 3.
Scheduled date 'o r res tar: following refueling:
1 4
a.- =. ~. =. s rc ' e'...-..' _' =_ _.'.e_',,.
"ue.o
..*.e_'
s'-'11 '_.~,,. =.~,~_ e s a-4, 5,
a* =
6.
The fuel, which has been leaded during 'the presen: scheduled refueli g cc: age, is of the nev ?Sx3R des'gn, consis:ing of aperoxica:ely 54 PSDR3232 asse blies and !20 ?SDR3255 asse=blies.
4 w-4 l
7.
(a)
There are 580 'uel asse:blies '
the core.
f (b)
There are 764 fuel asse=blies i
- he spen: fuel pcol.
1
. e-
.~~.a_' _= s e.' '_ _ a s.
s::: age capac,':7 _, s. s.--=.
?.a20 -7,_.
' '.=.es ed.-
(,)
.,e s s '_-_ _s p. se
._v, 1.,.0 r.ue_ assen
_,es a:
_. e a c :
a_, spen: fuea.
/
u.:
prese::.
(b)
The planned spent fuel storage capaci:7 is 2320 fuel asse=blies.
9.
"Jith presen: spe:: fuel is s::: age, :he spe:: fuel pool nes has -he capa-city :s ace :==date an addi:10:a1 1C06 fuel asse=blies.