Text
-
.. ~ _
6 EOSTON EDISON COMPANY GENamak Orrects 500 Govtstou erster sostem. MassacNuotits 02199 G. camb AmoOGNiM8 i
supt einv a ssot NT NucLEAN OptmatiONS OtWaS?tesNT l
April 1, 1980 BEco Ltr. #80-51 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nucicar Reactor Regulation 1
U.S. Nuclear Regulatory Commission j
Washington, D. C.
20555 I
t License No. DPR-35 Docket No. 50-293
[
Dear Sir:
I In a telecon on 3/27/80 you requested information relative to unscheduled j
entries of the drywell for the time frame 1/1/75 to present. Due to the manpower commitments surrounding the ongoing refueling outage effort, it was only possible to obtain the requested information from 8/1/77 to the present.
Response
1 1.
A table is attached listing the requested data.
t 2.
There have been no provisions considered to detect and reduce RCS leakage without entry beyond the originally installed monitoring equipment and j
equipment installed in response to NUREG 0578.
3.
The plant did not operate with RCS leakage in the contoinment during the researched time period.
I We hope the information provided is responsive to your needs and if you have any further questions please contact us.
Very truly yours,
/)oo/
s
///
8 0 04 0 8039g 1
Response to Item I e
Duration of Date of entry Reason for Entry Shutdown Results 4/78 Inboard MSIV disk sten separation 178 hours0.00206 days <br />0.0494 hours <br />2.943122e-4 weeks <br />6.7729e-5 months <br /> Valve repaired 10/78 Relief Valve Malfunction 438 hours0.00507 days <br />0.122 hours <br />7.242063e-4 weeks <br />1.66659e-4 months <br /> Valve repaired 3/79 SRM/IRM Malfunction 111 hours0.00128 days <br />0.0308 hours <br />1.835317e-4 weeks <br />4.22355e-5 months <br /> Repaired 6/79 Relief Valve Leaking 40.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Repaired 7/79 MSIV Timing Out of Specs 28.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Retimed 7/79 Relief Valve Malfunction 85.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Repaired 8
1 w
,,,