05000287/LER-1978-004-03, /03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified

From kanterella
(Redirected from ML19308B539)
Jump to navigation Jump to search
/03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified
ML19308B539
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/03/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308B528 List:
References
LER-78-004-03L, LER-78-4-3L, NUDOCS 8001090537
Download: ML19308B539 (2)


LER-1978-004, /03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified
Event date:
Report date:
2871978004R03 - NRC Website

text

,

ESC PCCM 354 U. S. NUCLEA4 KEcutATORY ccumesstow a.m UCENSEE EVENT REPORT EXHIBIT A comTmot stocx: I l

l l

l l

(PLEASE PRINT cm TYPE ALL REculREO INFORMAficNI ITTTl I s I cl NI E i e i 3l@3.l 0101 -10 I.0101010 l-1 Of Ol@ 4 i 111 11 I lt@l I

l uw@

uC.~...CCC.

i.

uC ~a ~-..a a

3 uC. a r..

i con *T

"E Ql 01 510 l 01012 l 8 l 7 i@l012 l 01317 ! 81@l0 l 3101317 l 8 l@

lolti u

en ei CoC=ar uu am w

a

.v a~r o.ra a

a aa.C T o r.

i svtNT cascaierien Ano race Asta causacVENCEs h 17TTI I On February 3.1978, durina a valve operability test. BS-3 was to be closed ;

,,,3j g and then opened to simulate its actions during and after a postulated m ; accident.

It failed to open. The failure caused one of the two reactor toisii buildina sprav trains to be inoperable.

However, the other train was

,, g j i available at all times and the repairs were accomplished within the Tech j

lo lil i Soec allowances in T.S. 3.5.3.

Therefore, public health and safety were 3,,, i not affected.

i 4

SYSTt u CAust CAuge come.

v&Ly s CCCS CCCE SueCCCE CC PCNENT OCQt fueCCCf SueCCCE I.wj i s i Bl@ LE,j@ l Al@ l V I Al U V l 01 Pl@ l A l@ [Zj @

7 8

3 10 It 12 IJ is ss

Q Stout 4TlaL CCC'in e E NCE at eCar A tVISION.

(g arno (VENf TtAR

  • tPCRT NC.

CCCE Tvet go, O" 45 0 '.17IRI I-I 10 10 14I M

lol al I r. I L-J LOJ

% Il 32 23 3.

26 27 3

3

G Ji 32 I

EN *aS$

'oEIN7<r

'"wfSE" ouas @ 's?'C'r"TE' se'.'".Ue.

"r'u",' N'a*

      • *2. l,s n IA h I 2 I@

[ b I,0 10! 01 lYl@

lNl@

l L l 21010 l@

ua u.

3 causa cesesierics Asoccantenvs Ac icus @

gl The cause of the incident was the electrical failure of the v' lve's a

titill toroue switch.

The corrective actio'n was the replacement of the switch gi and verification of the valve's operabili':y.

L i, u,,) I I

ii t. I 1 I

7 e 8 so T

in P0mt st CTNGA STATVS Ol1CCN Y

W [,,gj@ l1 ! O l Ol@l NA l.I3l@lDurinePT/3/A/0150/13A I

DISCCVtRY Of SCP'*TTC4 7

e e

it 13 es de 44 30 etLIA$f D 08 atLE ASE AaeouMr of acTivtTV 8, L..zj @ L.z.JOl LCCArtCN Cp agtgass NA l

l NA l

i PtASON8.tttuposungs mueste m TTPE dt5CaseT108e -

1 i I, i 10 l 0 10 l@[Z,,,,J@l NA I

' '.t.io.d',,ew'A.

(E.].IO 10101@lo.ic, Tie-@'A uu...

i l

in LOSS C8 Ce cauaCE TO 8acILtTV 4

7486 04 tCPa*Ttose FIII Q,j@l NA l

e e io 8'JOLICIff ia issygg 383CmarT10M NRC USE CNLY Q W@l NA I l!l!IIIIII!!I

.a

=Ameespas, Amen K R Wilson-(700 373-81N rNew s:

t s001096 53 7

m-

. e.,

4

'A DUKE POWER COMPANY OCONEE UNIT 3 Report No.:

R0-287/78-4 Report Date: March 3, 1978 Occurrenc e Date:

February 3, 1978 Facility:

Oconee Unit 3, Seneca, South Carolina Description of Occurrence:

3BS-3, Building Spray Pump Suction Valve Inoperable Conditions Prior to Occurrence:

1007. Full Power Description of Occurrence:

On February 3,1978, at 1005, during the performance of PT/3/A/150/15A (valve operational test) 3BS-3 failed to open.

The valve was closed in order to-test its ability to assume its post-LOCA position (open) and failed to do so.

The valve's torque switch was' replaced and the valve was operable by 1515.

Apparent Cause of Occurrence:

The valve's torque switch evidently failed thereby preventing the valve from properly operating.

Analysis of Occurrence:

The reactor building spray system consists of two separate trains with independent spray headers.

The 3BS-3 failure rendered the "A" t ain inoperable, but the other train was available to mitigate the consequences of accidents considered in the FSAR, and the train was returned to service within the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowed for repair in Technical Specification 3.3.5.

Therefore, the health and safety of the public were not endangered by this incident.'

Corrective Action

The valve's torque switch was replaced and the valve was verified operable.

0 9