ML19305E877
| ML19305E877 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/16/1980 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| 80-87, NUDOCS 8005200560 | |
| Download: ML19305E877 (1) | |
Text
'
8 005 2 00 56D BOSTON EDISQN COMPANY oe= =AL orricc8 aco sOTLSTON sTwerT S O S TO N. MASSACHUSETTS o2199 r
G. CAmL AMOOttmMa SUPtWBNTENOth?
MUCLEAN OPENAT' OMS OCPASTMENT May 16, 1980 BEco. Ltr. #80-87 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operatfog Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293 Ref:
G. Carl Andognini to Thomas A.
Ippolito, March 20, 1980, BECo Letter #80-48
Dear Sir:
The above referenced correspondence stated that a document would be for-warded under separate cover which detailed changes in Revision 5 of the Pilgrim Station Modified Amended Security Plan.
Please be advised that the document highlighting the changes to Revision 5 is included as Enclosure 1 of this letter. Enclosufe 2 and Attachment 1 provide a more detailed explanation of the deletion of certain items refer-enced in the highlighted document.
Pursuant to Section 2.790(d) of 10 CFR Part 2, we are withholding the information provided in Enclosures 1 and 2 of this letter frca public inspection. Withholding from public inspection does not affect the right, if any, of persons properly and directly concerned with the project to inspect the information.
Very truly yours yV u
.ed.
d
?
SooI s
cc: NRC Region 1 Regional Office l l l
i I
<