05000366/LER-1979-025-01, /01T-0 on 790223:upper & Lower Clevis Pins of Torus Vent Header Support Columns Were Displaced.Caused by Vibration.Design Change Issued & Is Being Implemented to Weld Caps to Clevis

From kanterella
(Redirected from ML19305A359)
Jump to navigation Jump to search
/01T-0 on 790223:upper & Lower Clevis Pins of Torus Vent Header Support Columns Were Displaced.Caused by Vibration.Design Change Issued & Is Being Implemented to Weld Caps to Clevis
ML19305A359
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/05/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305A355 List:
References
LER-79-025-01T, LER-79-25-1T, NUDOCS 7903130395
Download: ML19305A359 (2)


LER-1979-025, /01T-0 on 790223:upper & Lower Clevis Pins of Torus Vent Header Support Columns Were Displaced.Caused by Vibration.Design Change Issued & Is Being Implemented to Weld Caps to Clevis
Event date:
Report date:
3661979025R01 - NRC Website

text

LICENSEE EVENT HEPORT

" 'c'oNTeOL DLOCK: l l

l l

l l

l (PLE ASE PRINT OR TYPE ALL nLOUIREO INFOnMATION) t 6

Til lG l A l E ll lil 12 l@l010 l010 l01010 lo 10 1010 l@l 411 l 1 l 1 l 1 l@l l

8 9 LicLNSEE CODE 14 lb LICENSk NUMutH 25 2ti LICEN3L 1YPE Ju 57 C A I t>d ON'T

' [C E l l l@l 0 [ 5 l 0 l 0 l0 l 3 l 6 16 l@ 0 l 2 12 12 17 19 l@l0 l 3 10 15 17 19 l@

1 SO S

60 tal DOCK E T NUMdER ti3 03 EVENT DA1E 14 75 REPOH1 DATE 60 EVENT oESCRIPTION AND PROBABLE CONSEQUENCES h TTTl i Following the performance of the MSIV full closure test at 10% power, HiiP-2-10925. !

3 l an inspection was made of the torus interior due to SRV act sation resulting from i

the test.

Several of the upper clevis pins of the torus vent header suppdrt columns i 3

4 3 s ; were found to be displaced.

An underwater survey of the torus vent header support i

3 c j columns lower clevis pins revealed two of the pins were displaced an no longer can-1

)

7 l

ab e of providing support. This is a non-repetitive occurrence, i

o a i I

8 9 0'

C DE CO E SU9CO E CO*.iPONENT CODE SUSC dE S

E l S l A l@ y@ l A l@ l SI Ul Pl 01 Rl TlO W@ 12 l@

9 8

9 10 11 12 IJ 13 19 20 SCOUf NTI AL OCCU R R E F.CE REPORT REVISION LE R LVE NT YE AR R Li' ORT f.O.

CODE TYPE N O.

@ gg/DO l 7l 9l

[--.-j l 012l 5 y

l0l1l lT l l-l 101 n

_ 21 22 23 24 76 21 28 29 30 31 32 KEr A Tl O PLA T T

HOURS S

B* i D

FO 'b 3.

S PP LI E mat F LT RER If l@[Zjg l5C [ g lGZ j@

[0l3lBi4j W@

Bj@

lXl@

lCl3 1l0l@

33 34 3

3 J1 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECT'VE ACTIONS i

O l The clevis pins were displaced due to vibration.

The roll Dins which rc.10.inod tha l

clevis pins were sheered becaused they were not dosioned to 3nnnort latoral inuinn I i

i caused by the vibration.

A design change was issued and is beine implemonted to I

7

., [

weld caps to the clevis to retain the clevis pins.

I i

4 1

J B 9 80 ST

  • E PO A'[ R OTHER STA1PS ISC V RY DI!.COVERY DESCRIPTION [Bj@ Hl 0 l 0 l@l N/A l

[ B l@l Torus inspectics following stactua test l i

CO0TtNT

  • C Tivi ry RttfAPED Or RE LE ASE AMOUNT OF ACTIVITV

~LOCf. TION OF FIELLASE [Z J @ Qjg[

ft/A l

[

N/A l

i c

8 0 10 11 44 45 80 PE RSO*.t4EL I XPO0URES NUMBE R TYPE DE SCHIPTION 1 l0 l0 Oj@ ] @l N/A l

i 7

' ' etnsO. m'< imVL oEseniPiion@

NUm n l0 l0 l0 l@l r!/A i

a 8 fJ l1 12 B0 LOSS OF cit UAMAGE 10 FACillTY TYPE

(;L R IU P i lWi

] [Bl@l Sheared roll pins on clevis pins, clevis pins were ditolaced l

h

's to 60 PUnitcity unctigtcyty is.ut o@{UL5Cn Pl">t2 j[A liIllIllllIIIJ lij loj

... ia su ;

91?-367-7701

{

NAec or rnt eAm n T. V. Creene. Supt. Plt. Ena. Serv. pi g,n 79031303M J

NARRATIVE

REPORT FOR LER 2-79-25 On February 14, 1979, at 2143 CST, Unit 2 startup procedure HNP-2-10925, MSl? full closure test at 100% power, was performed.

An inspection of the torus interior was made following the test since main steam line safety re-lief valves were actuated.

The torus inspection revealed that several of the upper clevis pins of the torus vent header support columns were displaced.

This displacement occur-red due to lateral vibration of ti;e vent header which caused the roll pins, which retained the clevis pins, to be sheared.

An underwater diving concern, Sub Sea Surveyors, Inc., was contracted to survey the lower clevis pins of the torus vent header support columns and the SRV.ramshead tee support clevis pins.

On 2-23-79 at 1500 CST two of the lower clevis pins of the header support columns were found to be dis-placed and were no longer capable of providing support.

Design changes have been issued and a: e being implemented to weld caps to both the upper and lower clevis of the torus vent head support columns to retain the clevis pins.

There were no personnel overexposures or injuries and no release of radio-active materials as a result of this occurrence.