05000293/LER-1979-009, Forwards LER 79-009/03L-0

From kanterella
(Redirected from ML19282B981)
Jump to navigation Jump to search
Forwards LER 79-009/03L-0
ML19282B981
Person / Time
Site: Pilgrim
Issue date: 03/13/1979
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19282B982 List:
References
79-56, NUDOCS 7903190204
Download: ML19282B981 (1)


LER-1979-009, Forwards LER 79-009/03L-0
Event date:
Report date:
2931979009R00 - NRC Website

text

'

$}'.

~

""" Edison c-.,

PILGRIM NUCLEAR POWER STATION RFD 81 RUCKY filLL ROAD PLYMOUTH, MASSACHUSLTTs 02360 March 13, 1979 BECo Ltr #79-56 Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 79-009/03L-0 Docket Number 50-293 License DPR-35 Centlemen:

\\

The attached Licensee Event Report 79-009/03L-0, RBV-PRM Sample Pump, is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.

The Operations Review Committee has reviewed this event and classified it as a condition leading to operation in a degraded ecde permitted by a Limiting Condition for Operation (Specification 6.9.B.2.b).

If there are any questions on this subject, please contact us.

Respectfully submitted, f/

c, A

P.

. McGuire S tion Manager Nuclear Operations JMF:ep Enclosures: (3 copies)

LER 79-009/03L-0 cc:

Director (40 copies)

Office of Ibnagement Inforration and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20553 7903190204{