05000366/LER-1979-022-03, /03L-0 on 790209:floor Drain Sumps Flow Transmitters Incorrectly Calibrated & Indicated Higher than Actual Flow.Caused by Mod of Transmitter Range W/O Revision of Calibr Procedure.Calibr Procedure Revised

From kanterella
(Redirected from ML19282B417)
Jump to navigation Jump to search
/03L-0 on 790209:floor Drain Sumps Flow Transmitters Incorrectly Calibrated & Indicated Higher than Actual Flow.Caused by Mod of Transmitter Range W/O Revision of Calibr Procedure.Calibr Procedure Revised
ML19282B417
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/05/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19282B412 List:
References
LER-79-022-03L-01, LER-79-22-3L-1, NUDOCS 7903130356
Download: ML19282B417 (2)


LER-1979-022, /03L-0 on 790209:floor Drain Sumps Flow Transmitters Incorrectly Calibrated & Indicated Higher than Actual Flow.Caused by Mod of Transmitter Range W/O Revision of Calibr Procedure.Calibr Procedure Revised
Event date:
Report date:
3661979022R03 - NRC Website

text

4,CO,NTROL ULO"K: (

l l

l l

l lh (PLEASE PRINT OR TYFE ALL REQUlHED INFORMATION) i e

Til.lc LM_E_[I l H l 2 l@l 01010101010 lo 10101010 l@l4 1 Il 11 !1 l@l l

l@

U 9 LICEN5t L LUOL 14 lb LICEME NUMbEn 2b

G LICENSL TYPE JO 5 7 C A1 53 Yt*T II]

='s tLj@ 0l5l010l0 316 l 6 l@l 0 12 10 19 l 7 9l@l01310l5l7l9l@

8 t.0 01 ogCKh r NU?.'BE H t3 GJ EVENT DATE 74 7b REPORT DATE UO EVENT DESCRIP1tCN AND PROBA!;LE CONSEQUENCES h 2

l On 2-9-79, with the reactor at 49% power, while performina surveillance on the dry-I I

i

[ well equipment and floor drain sumps flow transmitters, it was discovered that they I 3

4 I

were incorrectly calibrated and indicated higher than actual flow.

The error was I

[

made in the conservative direction and the drywell leakage at the time was within I

s i

c [

specifications.

This incident has not previously occurred.

l L

I 7

I 11T0 l 60 6 9 SYSTEM C AUS E CAUM COMP.

VALVE CODE CCDE SUCCODE COMPONEN T CODE SUeCODE SUBCODE l C I I l@ lD l@ lZ l@ l Il ill S l T l R l U l@ l T @ [Z !@

9 l

C 9

10 11 12 13 18 19 2J

  • EOtiENTI AL OCCURRENCE REFORT REVISION LER RO EVENT YE AR REPOR T UO.

CODE TYPE NO.

I b,Pf$i l 7 l 9]

l-l l 0l 2l 2j

\\/l l0l3l Ll

[_]

[0]

1 u

_ 21 22 23 24

6 21 23 29 30 31 32

{

2h S' ' TE FL

  • 1 B.

SU Pil MA ILFER

, T P :.1 '

HO'J R S TA f f4 A T O di LEjgl34Gl@ yg

'[36Zj @ 0l 0l 0l 0 lM l@-

lUl@

l l1 l@

lR l3 l6 l9 l@

33 35 3/

40 41 42 43 44 47 cAUSE DESCRIPTION AND CORRECTIVE ACTIONS h gl The transmitter range _had been modified by a desian change to a range of 0-434 inches i

i l

of water from the original rarige of 0-110 inches of water.

The surveillance proced-t ure was revised; however, the calibration procedure was not revised to reflect the l

[

i 3

l change.

The transmitters were recalibrated at a later date and the range changed to I.

3 l

0-110 inches of water per the procedure.l 60 8 0 Si

  • . POV.'E R O1HER STATUS is

'll V DISCOVEHY DLSCRIPTION j F l@ [014_L9J@l II/A J

[B_j@l Normal Surveillance l

i c

AluvirY CO% N r AMOUNT OF ACuvlTY @

LOCATION OF RELE ASE @

aEumo Or nEu W ijij l Zl @ [Z_j @ l II/A l

lI/A l

I 8 9 10 11 44 45 80 j

Pt H50N'iEL IXPOSUFIL S TITl L 010 l oj@LZj@l ll/A l

l NU*.*R E M TYPi DESCHIPTION PEnSmEt',N,EEs uxnieuON@

num n dl 0 l Oj@l ll/A l

i 2

EO 43 9 11 17 L OT OF Olt f)AL AGI it;i ACILliY TYPL O(',L eil'I h ra

!_hj[f_j@[

ll/A l

s i i;

sa PLen ia'i r Y NRC' UZ ON L Y P;.a o _ u pe si ;,

tH C '.I 60 ".

i b

D '$b Pl!Of!L'

~

~

I

.... ff_C ! I C. i _ _

I'I r.

f;. J# ', & IQ PATU il

.s...

79031303 %

i

Georgia Power Company Plant E. 1. Hatch Baxley, Georgia 31513 Reportable Occurrence Report No. 50-366/1979-22procedure was performed the error showed up.

The transmitters wer'e cal-ibrated to the correct range and the calibration procedure was revised to reflect the change made.

Prior to the completion of the Unit 2 pre-operational test program, proce-dures were reviewed for changes required by design change requests as a part of the pre-operational test program.

Subsequent tothe completion of the precperational test there was no mechanism to insure procedure review for Unit 2 design changes. Unit 2 design changes now use the plant design change procedure which receives procedure review per HHP-814 Procedure Review.

To assure that all Unit 2 (i.e. 2-yr. - #)' design changes are reviewed, the plant procedure review procedure, HNP-814, will be applied to all remain-I ing Unit 2 design changes.

Furthermore all Unit 2 design changes complet-ed subsequent to the completion of the precperational test will be reviewed I

using procedure HNP-814.