LER-1979-036, /01T-0 on 790516:sprinkler Hanger Mods Indicated Seismic Design Deficiency for Cable Spreading Room Designs.Proper Analysis & Mods Have Begun |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3661979036R01 - NRC Website |
|
text
3 cou rnoi.ateco l. i I
1 I
I IQ (PLEASE PnifJT CR TYPE alt. nEQUIRED lf;FOn?.1ATION)
+
6 Ic'l A I F l t IF 11 !Glo lo lo lo lo lo lo i n l o l o l o l@l 41111111il@l I
l@
A 9 Licit. HEE CODE 14 15 LICENSE tev\\l6Eil 2S 26 LICENSE T vPE JJ 57 CAI 64 i
SC"J LtJ@lo I s Io Io lo 13 i r,i e !Gio is il is 1719 l@ln is i 3 l o 17 19 l@
8 63 64 GOCC T *.U*.tB E*4 01 6J EVENT OATE 34 75 REPOHT DATE 6J EVENT DESCntPTIO?J Ar;D PRC9AOLE CONSEQUENCES h I On 5-16-70 at 9_10 CST. while reviewino scrinkler hanner modifications crocosed b:, _j I the architect-encineer, it was discovered that such modifications indicated a seis-l 1 sorinkler sys-1
] l nic desinn deficiency for the Unit 1 and Unit 2 cable screadinc roc:
I tens cer HNP-?-FS AR Section 3.2.1.1 and IEEE 303-1971.
Subsecuent investigation
[
] 1 revn= lad r re areas affected.
All hangers had been soecified accordine to seismic 1
.D L_goi dal i a m = t s e i-n wore t c a s e. wet oica variables so that in the isolated dev-oine i
B1 conditiens the systers were closer to seisnic oualificatirn tMn (continuedl I
83 s9 CC"??.
VALVE 1
S Y S T E '.
CAUSE
CAUSE CCOE CODE SUSCOCE CCP.'PONENT CODE SUCOCOE SUSCOOE
]
A l B l@ IB l@ [ A l@ l S I UI P l 0 ! R l T I@ ] A l@ W @
S 10 11 12 13 18 19 20 SEQUENTI AL OCCURRENCE nt ORT REVISION LER/RO EVENT YE AR REPORT NO.
CCCE D PE NO.
@, peg l21 7 J 91 -[
10 [ 3 ( 6j l/l 10 l 1 l lTl l-l [0l 22 23 24 26 27 23 2'J O.
31 32 i
ACTION FUiUni EFFE07 SHUTOO'?cJ A TT A C M.* f N T P.p R M PRI'.t E COMP.
CC'! F C*.! N T OU 5 *.'t T T E D FCP t.1 M.A.
SU %iER M A*.U F A C T A E q T A K EiJ ACTiCN CN FLt.3.7 Af E T N CO HOURS LF_j@l 71@
L7J@
I 7 l@
I ol ol of of I Yl@
L!ijE IAl@
l G 121516 !@
i 33 J4 35 36 3 '.
40 41 42 43 44 4;
cAUSE CESCn'PTIC?J A?;O CORRECTIVE AcTIOtJS h p i The architect-encineer had submitted acoroved sorinkler syst:m desicns to meet inC l
gI ccmmitments which had not received a detailed seismic analys's.
Uoon recocnitinn i
of the event, the analys.is and modifications were begun immE"ately on the affected }
7 l GI systems.
On 5-26-79, modification ard cualification of Uni- ? related syste s '. tere 1 91 comolete and en 5-29-79. modification of Unit 1 related fMntinuedi l
E3 8 9 ST S
. P C'.". E R OTHE R STATUS SCOVERY DISCO.*ERY DESCRIPTION
]lAl@ lol0lo!@l N/A l
[D_j@lDroeosed odifimtiens indicated nrele I 60 3 9 10 12 11 44 45 46 ACTIVITY CONTENT RELE ASED OF RE' E ASE AVOUNT OF ACTIVITY LOCASON OF RE LE ASE -
I l Z l @ [Lj@l N/A l
l N / f.
6 80 g 9 la 1:
44 45 PERSONNEL ExPCSUR ES NU?.'B E R TYPE CESCRIPTION 4
@ l0IoI0.j@lZl@l N/A l
80 5 9 il 12 13 A
Qj
/l PERSONN % INJUA.ES f
NUV9EF DESCRIPitCN
- I 9 toIoIol@l PUA 83 7906060 M q 8 9 11 12 LOSS CF OR OA*> ACE TO FACILITY 33
'-] L7J@l I
TYPE CESCniPT!os N/A
. 9 h
O e
UM'h uu a vu u a 68 69 30 g *j N/A i
lllll11I))Ill{
iSSUEn CESCHiPTION 8 uuSI a
n m
4 8 3 to 0000' N*
b*
U*
1 PH O r.l.
NA?.'E OF PREPAnEn
~
~~
I Georgia Power Company Plant E. I. Hatch Baxley, Georgia 31513 e
Event Description and Probable Consequencescalculations indicated.
~,
Cause Description and Corrective Actions~
sytems was begun and is to be com.pleted by the end of the Unit 1 Refuel-ing Outage.
e 2274 292 e
O
_..;. ~.:., ".
- A.=,*
,, *..=
L
~..
u.....
f l
NARRATIVE
SUP/1ARY 1-LER 2-79-36 I
l In reviewing the Grinnell as-built drawings of new sprinkler systems in-l[
stalled during the first half of 1978, to meet the 1979 due dates, it
'i was discovered by the architect-engineer that these NRC fire protection com:nitr.ent related syster.s had received an inadequate seismic review End '
that modifications would be necessary to meet the design loads.
Upon notification of the proposed modifications the responsible personnel on site proceeded to obtain details on design bases and additonal systems affected.
Pending clarification of the problem, the design deficiency for i
the more critical area, the ccmmon cable spreading room was reported at both units, and the approved design modifications to this area were begun.
At this point it was found that several other systems were seismically in-adequate.
The affected systems, committed operability date, and modific-ation schedule are summarized below:
SPRINKLER SYSTEM C0:0!ITME::T DATE MODIFICATIC::S A::D COSCOLETE UNIT 1/U::IT 2 QUALIFICATION BY:
(UNIT 1/U::IT 2) l Intake Structure Jan. 31, 1979 5-25-79; no modifications (common) required RPS' Cableway Unit 1, 1979 5-26-79 (com:: on) refuel Control Building Unit 1, 1979 5-26-79/5-26-79 Corridcr at El.
refuel 130' (Units 1
& 2)
Rx. Building HVAC Unit 1, 1979~
6-30-7 9/ir-26-7 9 Rooms at El. 164' refucl/ Unit 2, (Units 1 & 2) 1980 refuel Cable Spreading Unit 1, 1979 5-26-79/I-26-79 Room refuel I
Rad-Waste Dry Waste N/A 6-30-79
(
Storage (Unit 1)
Recire. MG Set Jan. 31, 1979 6-30-79 (Unit 1)
East cableway July 31,,1978 6-30-79 (Unit 1)
HPCI Room May 31, 1978 6-30-79 (Unit 1) k 2274 293
,J
' i.
s **N(f?*;Q
..-, m....' *.-3 4.,y
-.,c.
i
~
. -r
. ;.7:.~. l :.%
_'.,,,,,,_._..,.s,'
_m....
~_
__m.____
ti
Those systems already declared operable were not impaired in their fire protection functions, and degradation of the seismic qualification of systems beneath the sprinkler systems was minimal since the initial designs were based on seismic guidelines assuraing a worse case of water being in the. piping of the isolated dry-pipe systems.
Final calculations have rev-i caled further modifications, and both calculations and modifications will l'
be complete for areas affecting each unit before start-up of that unit.
e 2274 294 4
h 9
f o
E i
s O
i 1
- .rt
')
~
e if ij os
, ~
+
',4 '..,,...,."..;
- v-.
' Ii
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000366/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000366/LER-1979-001-03, /03L-0 on 781229:in Cold Shutdown While Performing HNP-2-3154,reactor Water Level Instrument Switch 1 Was Found Inoperative Due to Broken Foot, & Switch 3 Actuated at 122.2 in H2O Input | /03L-0 on 781229:in Cold Shutdown While Performing HNP-2-3154,reactor Water Level Instrument Switch 1 Was Found Inoperative Due to Broken Foot, & Switch 3 Actuated at 122.2 in H2O Input | | | 05000321/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000321/LER-1979-001-03, /03L-0 on 790109:during Steady State Power at 2400 Mwt,Plant Personnel Inadvertently Opened Both Doors of Reactor Bldg 130-ft Airlock R106.For Reasons Unknown,Switch Which Allows Defeat of Interlock Was Operated | /03L-0 on 790109:during Steady State Power at 2400 Mwt,Plant Personnel Inadvertently Opened Both Doors of Reactor Bldg 130-ft Airlock R106.For Reasons Unknown,Switch Which Allows Defeat of Interlock Was Operated | | | 05000321/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000321/LER-1979-002-03, /03L-0 on 790111:during Normal Operation,Hpci Steam Supply valves,E41-F002 & E41-F003,automatically Isolated Due to Equipment Room High Differential Temp & Cold Outside Air Flowing Across Inlet Air Temp Elements | /03L-0 on 790111:during Normal Operation,Hpci Steam Supply valves,E41-F002 & E41-F003,automatically Isolated Due to Equipment Room High Differential Temp & Cold Outside Air Flowing Across Inlet Air Temp Elements | | | 05000366/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000366/LER-1979-002-03, /03L-0 on 791231:in Cold Shutdown While Performing HNP-2-3456,overvoltage Trip Setpoint for Reactor Protection Sys Motor Generator Set B Was Found at 133.5 Volts Alternating Current.Caused by Setpoint Drift | /03L-0 on 791231:in Cold Shutdown While Performing HNP-2-3456,overvoltage Trip Setpoint for Reactor Protection Sys Motor Generator Set B Was Found at 133.5 Volts Alternating Current.Caused by Setpoint Drift | | | 05000321/LER-1979-003-03, /03L-0 on 790114:during Normal operation,hi-flow Alarm Occurred on Stack Effluent Radiation Monitor.Sample Pump Was Found Not Running.Restart Failed,As Did Spare Pump. Caused by Failure of Operating Pump Carbon Valves | /03L-0 on 790114:during Normal operation,hi-flow Alarm Occurred on Stack Effluent Radiation Monitor.Sample Pump Was Found Not Running.Restart Failed,As Did Spare Pump. Caused by Failure of Operating Pump Carbon Valves | | | 05000321/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000366/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000366/LER-1979-003-03, /03L-0 on 790102:in Cold Shutdown While Performing HNP-2-3173 on Reactor Pressure Switch 2B21-N021C,setpoint Found Above 600 Psig for Switch No 2.Caused by Switch Setpoint Drift | /03L-0 on 790102:in Cold Shutdown While Performing HNP-2-3173 on Reactor Pressure Switch 2B21-N021C,setpoint Found Above 600 Psig for Switch No 2.Caused by Switch Setpoint Drift | | | 05000321/LER-1979-004-03, /03L-0 on 790119:during Performance of Procedure HNP-1-3302,armature Winding of HPCI Injecting Valve Motor (E41-F006) Burned When Valve Was Opening.Minor Internal Disorder Probably Led to Overheat | /03L-0 on 790119:during Performance of Procedure HNP-1-3302,armature Winding of HPCI Injecting Valve Motor (E41-F006) Burned When Valve Was Opening.Minor Internal Disorder Probably Led to Overheat | | | 05000366/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000366/LER-1979-004-03, /03L-0 on 790104:review of HNP-2-3610-0 (RHR Pump Operability) Data Sheet Revealed Pump Delta Requirements Not Met.Caused by Personnel Error Resulting from New Procedures | /03L-0 on 790104:review of HNP-2-3610-0 (RHR Pump Operability) Data Sheet Revealed Pump Delta Requirements Not Met.Caused by Personnel Error Resulting from New Procedures | | | 05000321/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000366/LER-1979-005-03, /03L-0 on 790103:under Frequency Trip Setpoint Found at 54.1HZ for Motor Generator Set A.Caused by pre-op Test on Sys.Surveillance Test HNP-2-3456 Contains Setpoint More Conservative than Tech Specs | /03L-0 on 790103:under Frequency Trip Setpoint Found at 54.1HZ for Motor Generator Set A.Caused by pre-op Test on Sys.Surveillance Test HNP-2-3456 Contains Setpoint More Conservative than Tech Specs | | | 05000366/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000321/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000321/LER-1979-005-03, /03L-0 on 790118:while Performing HNP-1-350-M,TDR G31-R616D Failed to Actuate at Its Setting of 15-s.Two-h Time Limit Exceeded W/Sys Down for Repair.Caused by Loose Screw on Diaphragm,Resulting in Component Failure | /03L-0 on 790118:while Performing HNP-1-350-M,TDR G31-R616D Failed to Actuate at Its Setting of 15-s.Two-h Time Limit Exceeded W/Sys Down for Repair.Caused by Loose Screw on Diaphragm,Resulting in Component Failure | | | 05000366/LER-1979-006, Forwards LER 79-006/03L-0 | Forwards LER 79-006/03L-0 | | | 05000366/LER-1979-006-03, /03L-0 on 790102:reactor Pressure Instrument Ft&C, Relay 2B21-K34A Failed to Operate W/Actuation of 2B21-N021A. Caused by Open Coil | /03L-0 on 790102:reactor Pressure Instrument Ft&C, Relay 2B21-K34A Failed to Operate W/Actuation of 2B21-N021A. Caused by Open Coil | | | 05000321/LER-1979-006, Forwards LER 79-006/03L-0 | Forwards LER 79-006/03L-0 | | | 05000321/LER-1979-006-03, /03L-0 on 790122:during Normal Startup,Reactor Operated Above 1% for Over 24-h W/O Critical Mass Peaking Factor Being Calculated.Caused by Computer Limitations for Low Power Operation | /03L-0 on 790122:during Normal Startup,Reactor Operated Above 1% for Over 24-h W/O Critical Mass Peaking Factor Being Calculated.Caused by Computer Limitations for Low Power Operation | | | 05000321/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000321/LER-1979-007-03, /03L-0 on 790120:reactor Core Isolation Cooling Min Flow Valve (E51-F019) Failed to Close Automatically. Caused by Failure of Open Limit Switch,Resulting in Damage to Valve Operator & Torque Switch | /03L-0 on 790120:reactor Core Isolation Cooling Min Flow Valve (E51-F019) Failed to Close Automatically. Caused by Failure of Open Limit Switch,Resulting in Damage to Valve Operator & Torque Switch | | | 05000321/LER-1979-008-03, /03L-0 on 790121:reactor Max Cooling Rate Exceeded Due to Injection of Condensate Feedwater Into Reactor Vessel During Slowdown.Caused by Pressure Decreasing Below Condensate Booster Pump Discharge Pressure | /03L-0 on 790121:reactor Max Cooling Rate Exceeded Due to Injection of Condensate Feedwater Into Reactor Vessel During Slowdown.Caused by Pressure Decreasing Below Condensate Booster Pump Discharge Pressure | | | 05000366/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000366/LER-1979-008-03, /03L-0 on 790110:reactor Core Isolation Cooling Steam Line Differential Pressure Low Switch Found to Actuate at 119 in H2O & High Switch at +122 in H2O.Caused by Switch Setpoint Drift | /03L-0 on 790110:reactor Core Isolation Cooling Steam Line Differential Pressure Low Switch Found to Actuate at 119 in H2O & High Switch at +122 in H2O.Caused by Switch Setpoint Drift | | | 05000321/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000366/LER-1979-009-03, /03L-0 on 790111:low Switch & High Switch of 2E51-NO18 Operated Contrary to Tech Specs.Caused by Switch Setpoint Drift.Corrected by Performance of HNP-2-5202 Procedure | /03L-0 on 790111:low Switch & High Switch of 2E51-NO18 Operated Contrary to Tech Specs.Caused by Switch Setpoint Drift.Corrected by Performance of HNP-2-5202 Procedure | | | 05000366/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000321/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000321/LER-1979-009-03, /03L-0 on 790123:during Normal Operation,While Performing Maint on Reactor Water Cleanup Pumps,Personnel Unable to Sample Primary Coolant Every 4-h.Caused by Stopped Up Redundant Sample Line | /03L-0 on 790123:during Normal Operation,While Performing Maint on Reactor Water Cleanup Pumps,Personnel Unable to Sample Primary Coolant Every 4-h.Caused by Stopped Up Redundant Sample Line | | | 05000321/LER-1979-010-03, /03L-0 on 790124:during Normal pre-conditional Ramp,Determined That a Reactor Coolant Chemistry Sample Could Not Be Obtained.Caused by Both Reactor Water Cleanup Pumps Being Inoperable & Primary Sample Line Clogged | /03L-0 on 790124:during Normal pre-conditional Ramp,Determined That a Reactor Coolant Chemistry Sample Could Not Be Obtained.Caused by Both Reactor Water Cleanup Pumps Being Inoperable & Primary Sample Line Clogged | | | 05000321/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000366/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000366/LER-1979-010-03, /03L-0 on 790117:in Cold Shutdown,While Performing HNP-2-3820,switches 2B21-N301 F,H & L Did Not Actuate.Caused by Switch Diaphragm Failure | /03L-0 on 790117:in Cold Shutdown,While Performing HNP-2-3820,switches 2B21-N301 F,H & L Did Not Actuate.Caused by Switch Diaphragm Failure | | | 05000321/LER-1979-011, Forwards LER 79-011/03L-0 | Forwards LER 79-011/03L-0 | | | 05000366/LER-1979-011, Forwards LER 79-011/03L-0 | Forwards LER 79-011/03L-0 | | | 05000366/LER-1979-011-03, /03L-0 on 790117:during Normal Startup Test & Reactor in Cold Shutdown,Review of HNP-2-3160 (RHR Pump Operability) Revealed Required Flow Not Being Met.Caused by Procedural Error by Personnel | /03L-0 on 790117:during Normal Startup Test & Reactor in Cold Shutdown,Review of HNP-2-3160 (RHR Pump Operability) Revealed Required Flow Not Being Met.Caused by Procedural Error by Personnel | | | 05000321/LER-1979-011-03, /03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired | /03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired | | | 05000366/LER-1979-012, Has Been Voided | Has Been Voided | | | 05000321/LER-1979-012-03, /03L-0 on 790124:during Shutdown,High Pressure of 200 to 300 Psig Existed in RHR Heat Exchangers.Caused by Slow Leak Past E11-F015A Valve | /03L-0 on 790124:during Shutdown,High Pressure of 200 to 300 Psig Existed in RHR Heat Exchangers.Caused by Slow Leak Past E11-F015A Valve | | | 05000321/LER-1979-012, Forwards LER 79-012/03L-0 | Forwards LER 79-012/03L-0 | | | 05000366/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000321/LER-1979-013-01, /01X-1 on 790131:scram Received on Intermediate Range Monitor Hi-Hi Trip at Notch 26 of Rod 42-15.Caused by Notches Being Withdrawn Past Point Required to Achieve Criticality.Procedures Revised | /01X-1 on 790131:scram Received on Intermediate Range Monitor Hi-Hi Trip at Notch 26 of Rod 42-15.Caused by Notches Being Withdrawn Past Point Required to Achieve Criticality.Procedures Revised | | | 05000366/LER-1979-013-03, /03L-0 on 790125:while in Refuel Mode,Control Rod & Control Rod Drive Removal Was Begun Before Performing one- Rod Out Refueling Interlock Operability Test.Caused by Omission of This Step in Procedure.Procedure to Be Revised | /03L-0 on 790125:while in Refuel Mode,Control Rod & Control Rod Drive Removal Was Begun Before Performing one- Rod Out Refueling Interlock Operability Test.Caused by Omission of This Step in Procedure.Procedure to Be Revised | | | 05000321/LER-1979-013, Foward LER 79-013/01X-1 | Foward LER 79-013/01X-1 | | | 05000321/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | |
|