05000366/LER-1979-035-03, /03L-0 on 790515:procedure HPN-2-3195,weekly Breaker Alignment Checks, Was Performed One Day Late. Caused by Late Issuance of Assignment Sheets.Surveillance Engineer Made Aware of Importance of Prompt Sheet Issuance

From kanterella
(Redirected from ML19270G377)
Jump to navigation Jump to search
/03L-0 on 790515:procedure HPN-2-3195,weekly Breaker Alignment Checks, Was Performed One Day Late. Caused by Late Issuance of Assignment Sheets.Surveillance Engineer Made Aware of Importance of Prompt Sheet Issuance
ML19270G377
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/24/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19270G376 List:
References
LER-79-035-03L, LER-79-35-3L, NUDOCS 7906060239
Download: ML19270G377 (1)


LER-1979-035, /03L-0 on 790515:procedure HPN-2-3195,weekly Breaker Alignment Checks, Was Performed One Day Late. Caused by Late Issuance of Assignment Sheets.Surveillance Engineer Made Aware of Importance of Prompt Sheet Issuance
Event date:
Report date:
3661979035R03 - NRC Website

text

>

.coNTnoL,c LOCK: l l

l l

]. l l@

(plt ASE PillNT On TYPE ALL REOuinED INFORMATioN1 8

6 g

E l G l A l E l I l H l 2 l@l 010101010 lo 101010 lo 10 l@l4 l1 ll 1111 l@l l

l@

E 9 LICENSEE CODE 14 IS LICE 84E NUYtf EH 23 LSCLF6E T YPE JO bJ CA1 b4 N'TE S$ns [tJ@l0 I 5101010131616 Glo Is 11 is 1719JSl0 i s 1214171910 8

60 68 DOC K E I r.U'.*0 E H M

63 EVENT DATE 14 7b FiEPOH T DATE t;J

, EVENT DESCnlPTION AND PROBABLE CONSEQUENCES h E l On 5-15-79, while shutdown for Anchor bolt inspection and repair, a review of surveil-1 Til I lance assignment sheets revealed that procedure Hf'P-2-3195, Wedkly Breaker Alignment 1 E l Checks, had been performed one day late - it was done on 5-14-79 and the latest per-l E

missible day was 5-13-79.

There are no probable consequences.as a result of this l

T61 I event.

I I

EI I

Tirl I I

6 9

'O a

DE CODE SL CO E COMPONENT CODE SUS dE SU E

E I Z l Z l@ [A_J@ [XJ@ l Z l Z l Z l Z l Z l Z l@ l Z l@ l Z l @

8 9

10 11

  • 2 33 18 19 20 SE QUENTI AL OCCUR R E NCE RCFORT REVISION LER RO EVENT YE AR REPOR T NO.

CODE TYPE N O.

l

@ aEg l17l9l l-l 10l3l5l l2]

l0l3l [L J

[-j [0_j i

u 31 32 I

_2 22 23 24 26 27 28 29 3J KE AC ON O PLAPT

  • TH NOURS S O' iTk D FCR S P LI MAN

^T RER L!U@34lZI@ lZi@

IZI@

10101010I I n I@

l n t@

I Z l@

lZ191919l@

33 36 26 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h El The reason that the procedure was performed late was that t% surveillance assian-1 i'

El ment sheets for the week of 5-12-79 throuch 5-18-79 were sert out late by the sur-l EI veillance engineer.

Corrective actior was to emohasize to the surveillance encineer I l

El the importance of the assianment sheets beina sent out on ti e.

I E l-I 8 9 80 STA S

% POWE R OTHER STATUS SO fY DfSC2VERY DESCRIPTION

@ [,_G_J@ l 0 l 0 l 0 l@l N/A l

lAl@l Review of Sur.<eillance Assianments l

ACTIVITY CO TENT CF RELE ASE AMOUNT OF ACTIVITY LOCA7 ION OF RELEASE REL E 4bE@D LZJ@l N/A l

l N/A l

LE_J 6

8 9 10 11 44 45 80 PERSOr NEL EXPOSUAES s

NUMBER TYPE DE SCRIPTION 1010 0_j@[z_j@l N/A l

7

,ERSONNa'mJIES ouCRiPTiO~@

NUMetn 1010101@l N/A l

a 8 9 11 12 83

= ' =^= ' ^ " " @

2906066

  • 2274 285l 3

Zl@l N/A 8 9 10 80 3 [2_f@ DESCRIPTION IS*,U E l

N/A l

Il lIIIIIIIIII g 9 10 68 69 80 NAME oF PnEPAflEn T. V. Greene Supt. Plt. Eno. Serv. pnout 912-367-7781 E,