05000321/LER-1979-011-03, /03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired

From kanterella
(Redirected from ML19270F562)
Jump to navigation Jump to search
/03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired
ML19270F562
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/09/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19270F561 List:
References
LER-79-011-03L, LER-79-11-3L, NUDOCS 7902150443
Download: ML19270F562 (1)


LER-1979-011, /03L-0 on 790124:while in Cold Shutdown,Both Doors of Reactor Bldg Were Opened,Violating Secondary Containment. Bracket Into Which Dead Bolt Projects Was Bent,Preventing Interlock from Functioning.Bracket Was Repaired
Event date:
Report date:
3211979011R03 - NRC Website

text

'"

_......... ~.,

fl.*ll)

LICENSEE EVENT REPORT CONTno! BLOCK: l l

l l

l lh (P,. EASE PRINT OR TYPE ALL REQUIRED INFORMATION) s

[ G l A l E l I l H I I l@! 0 10 10 l 0 10 l0 10 lo l 0 l o l O @l 4 l 1 1 1I1 1l@l l

l@

O i

7 8 9 LICE'.SEE COOL I4 15 LICEt.SE NUP/blH 25 20 LICENSL 1)PE JU bi CA! bd con'T L21.1_}

"SnN l L l@l015 ln In ln 131211 l@l01112141719l@l012 lOl917l9!@

7

' 8 f,3 61 DOCKET NUM9ER rid 69 EVENT DATE 74 75 REPO4T DATE t' J EVENT DESCRIPTION AND PROBADLE COr SEQUENCES h l o l 21 l While in cold shutdown, plant personnel inadvertantly opened both doors of the

[

o 3

reactor bldg.,130 ft. elevation, airlock # R106 v olating secondary containtnent.

l o

.i [

The standby gas treatrent system was oroven operable, insuring secondary contain-l lo,s; ;

ment integrity to comply with technical specification Section 4.7.C.2.

Previous l

c c

1 occurrences of this type were reported in LER's 76-75, 77-27, 77-39, 77-63, O

7 l

77-66, 77-73, 77-82, 77-95, 77-97, 78-7, 78-16, 78-25, & 79-1.

l 0

8 l

1 7

8 9 80 SYSTE M

CAUSE

CAUSE C O'? P.

VAL 2 CCDE COOE SU9 CODE CC'.*aONENT CODE SUSCOOE SUSCCOE lS A l @ [B_j @ lA l @

ZlZ ZI Zl Zl Zl @ l Zl @ [Z_J @

O 9

7 8

9 10 11 12 13 18 1) 2J SEQUE N TI AL OCCURRENCE

'RERORT R E VISIOf.

LE Rf RO EVENT YEAR REPORT NO.

CODE TYPE NO.

@,agg 1719I l-l I01111I i/l 1013J [L l j_l W

_ 21 22 23 24 a6 21 28

9 30 31 32 I PLlh MA F CT ER J A O

O PL T

M O

HOURS S ' IT F

8.

S [Lj@lE l@

l Z l@

IZ l@

l O! 0l 010l l N l@

l fi l@

lZl@

l Z l 9 l 9 l 9 [@

33 34 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 1 o 1 The bracket into which the dead bolt projects was found to be bent.

The bracket i

i i

l was found to be bent to the extent it could only catch tho tio end of the dead i

1ii.i bolt.

This condition prevented the interlock from performina its intended func-1 i

3 l

tion. The bracket was renaired. thus restoring the interlockina function to oner-I i

.s I

able status.

I 7

8 9 E0

  • PCV.E R OTHER STA TUS ISCO FY OlSCOVERY DESCRIPTION STA LG_l@ I O I 0 l 0 l@

N/A I

l@l Personnel Observation l

i s

Activi T V CO TENT RELE ASE D 08 RELEASE AMOUNT OF ACTIVITY LOC ATION OF RELE ASE li 16 l [Z_j @ l Z l@l N/A l

l N/A l

7 8 9 10 44 45 80 PERSONNE L E nPOSunE3 NU'/H E H 7] l0 l0 Oj@l zTYPE @lCESCHIPTION N/A l

1

' n nSO w d'lw u',il E n liiIlo1010l@l N/A l

7 8 9 11 1/

80 L O.S OF CH DAV ALE T O F ACILI TY d

TYP; DE SCRIP TION [i L"] l Z l@l N/A l

7 H

'J 10 80

..s,.""0L,110,@

7902150W3

"" " " ~

I-1 > l Lzjg[

N/A l

lllllllill ltl; 7

II

  • )

10 68 f,9 80 5 Tom Greene, Suot. Pl t.

Eng. Services.gggyg 912-367-7781 2,

NAME OF PHCPAHEH i