Text
s a
DOSTON EDISON COMPANY oENERAL oFFICEE Goo SQYLSTON sTNEET BasTON. M AES ACNUSETTs o2199
- o. C AmL ANDOONeNe S u PE RI NTEND E N T NUCLE AM OPERATIONS DEPARTMENT February 5, 1980 BECo. Ltr. #80-25 Mr. Thomas A.
Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293 Review of Proj ected and Backlog Licensing Items Ref. a)
U.S. NRC Letter (T. A.
Ippolito) to Boston Edison Company (G. C. Andognini) dated August 20, 1979.
1950 060
Dear Sir:
Reference a) requested Boston Edison Company to review backlog licensing items and designate priorities accordingly. As a result, several items with the highest priority were identified via verbal communication with your staff and were subsequer.cly approved and issued as Technical Specification amendments.
The following subjects include both projected and backlog licensing items, listed according to their respective priority:
Priority Subject Submittal Date Comments 1.
Multiple Control Rod 11/20/79 Desired By Removal Feb. 15, 1980 2.
Projected Package of Near Future Necessary for Tech. Spec. changes per starr.up from Refueling Outage refueling outage Modifications 3.
Reload IV Submittal 12/12/79 Necessary for Startup from refueling outage 4
Miscellaneous T.S. Changes 7/ 6/79 a) APRM Setpoints 00l b) ILRT Change g
Desired prior to startup from
//D refueling outag h
8002 20 5 2.2.
1
BOSTON EDISON COMPANY Mr. Thomas A.
Ippolito, Chief February 5, 1980 Page 2 Priority Subject Submittal Date Comments c) Snubbers Updates Tech.
Specs. to cur-rent "As Built" d) Adminis trative Updates Tech.
Specs. to cur-rent Staffing e) Auto Blowdoun Timer Desired prior to startup from refueling f)
In Sequence Criticals g)
IRM Channel Calibration Per Request of
'RC I&E h) MSIV Closure Time Clarification on previous Tech.
Spec.
4.
18 Month Cycle 12/31/79 Desired by March 1980 5.
Administrative 9/27/79 Updates Tech.
Specs. to cur-rent staffing 6.
Fire Protection Modifica-tion Implementation 2/ 5/79 7.
Radiation Protection 12/27/79 Manager 8.
Reactor Coolant Chemistry 3/22/78 Clarifies un-and Hydraulic Snubbers resolved items per I&E Inspec-tions O
Snubber section ikh can be deleted per
\\gl misc. T.S. changes 7-6-79 9.
Diesel Fuel Quality 2/ 1/78 10.
Single Loop Operation 3/19/76 To be supplemented with frrther analysis
SasTcN EDISON COMPANY Mr. Thomas A.
Ippolito, Chief February 5, 1980 Page 3 Priority Subject Submittal Date Comments 11.
10 CFR 50.55a (g) 3/15/79 Revision in process to be resubmitted 12.
Emergency Plan 11/ 4/76 FSAR Amendment #38 (App. N) Revision in process - to be resubmitted The following item should be deleted from your list:
Diesel Generator Surveillance 11/12/76 We trust that those items of highest priority will receive prompt review and approval.
Should you require further information on any submittal, please do not hesitate to contact us.
Very truly yours,