ML19254E003

From kanterella
Jump to navigation Jump to search
Responds to NRC Request for Addl Info Re Responsible Persons for Radiographer Certification & Document Control.Hc Graber Is Responsible Individual for Entire Radiation Safety Program
ML19254E003
Person / Time
Site: 07100079
Issue date: 10/10/1979
From: Graber H
BABCOCK & WILCOX CO.
To: Spraul J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19254E004 List:
References
14408, NUDOCS 7910300440
Download: ML19254E003 (4)


Text

G -A r t C7/- con Babcock &Wilcox 4

\\

g eome,cene,auen c, o

[

Barberton, Ohio 44203

/p q

Telephone: (216) 753-4511 L

o t u.,.c71 e'07

-e 9s R October 10, 1979 g

g 9

6 Mr. Jack Spraul U.S. Nuclear Regulatory Cec =ission Transportation Branch Division of Fuel Cycle & Material Safety :NSS Washington, D.C. 20555

SUBJECT:

Your letter FCTR:PliO 71-0079

Dear Sir:

With regards to above subject letter I want to apologize for not responding.

My office does have a record of receiving the letter, however, it was un-intentionally =isplacedand/ormisdirected.

Following is the response to the subject letter and the additional information requested.

Item 1 Under " Organization" indicate who (by kitle)L.is responsible for radiographic certification. Also, indicate if the radiog-aphers are responsible for maintaining test status information.

Reply 1.

H. C. Graber is responsible for radiographe rs certification. This responsibility "?2diation Safety Officer" is identified in th> e ganination chart, Attach =ent A Page 3 to the r2,u11.

(Copy Attached) Training and instruction are delegated c g p p;*o to the training instnetor and Assistant Radiation Safety Officer indicated on the organization chart.

A MM 2.

Test status infor:ation is delegated and naintained 035tMC and controlled b-; the technical specialist or e

giggg 3 y shift supervisors as identified in the attached l -

i gm a

organisational chart. All recoris associated with

\\'

k. #

receipt and shipping of sources are the responsibility UM ncvch

'M of the aforementioned personnel.

4

/

/

vg 1236 123 r

144CS 9/( k[; / f/[]

The Babcock & Wilccx Comcany ' Estabi shed 1867

Babcock & VVilcox Mr. Jack Spraul OcteDer 10, 1979 Item 2 Under" Document Control" indicate who (by title) is responsible to insure that all QA functions are conducted in accordance with the latest applicable versions of documents.

Reply H. C. Graber, by virtue of title, is the responsible individual for the entire Radiation Safety Program.

CA functions are tied in directly with the Radiation Safety Program required to satisfy the licensing require:e ats.

Ite: 3 Under " Handling, Storage md Shipping" provide a stacement that shiptents will not ce cade unless all tests, certifications, acceptancies and final inspections are complete.

Reply The procedure referenced in the Barberton Works Radiation Safety Manual (Part 1 Procedure -7) does in fact provide the controls on tests, certifications, acceptance and final inspection to assure they are completed. (Attachment

2) Copy attached for your zeference.

6 Item 4 Under " Inspection, Test, and Cperating Status" indicate who (by title) is responsible to perform the regulatory required inspections and test per written procedures.and who (by title) are responsible to assure these functions are perforced.

Reply 1.

Individuals responsible to perform the regulatory required inspection; and tests as required by the detailed proceiures are: technical specialist and safety supervisors as identified on the attached crganination chan.

2.

The Radiation Safety Officer and Assistant Radiation Safety Officer as shewn on attached organination chart are respons!.ble to assure the functions are perforned.

Ite= 5 Provide a statetent that procurement documents will be maintained in accordance with Pa t 6 of the subnittal.

Reply Quality Assurance records will be =aintained in accordance with the Barberton Works Radiation Safety Manual Part 1 Procedure 6.

Copy attached hereto for your reference.

(Attachment 3) 1236 124 e

-w i

...~.

Babcock &Wilcox Mr. Jack Spraul October 10, 1979 Item 6 Under " Audits" provide a statetent that each quality related activity will be audited at least once each year by an auditor (or audit teas) having no responsibility in the activity being audited.

Recly Internal Quality Audits are perfor ed on an annual basis by audit teams having no responsibility in the activity being audited. Attached hereto (Attachment

4) is a copy of the 33:W QA Procedure 12-CST-16 specif ing f

the policy and procedure. Please reference Paragraph 4 of this procedure for specific details.

Very truly yours,

[ '.b.

H. C. Graber Nuclear Equipment Quality Assurance Barberton Works Radiation Safety Officer HCG /c:.

attach.

1236 125

.mmmm.--- - -

e-....,,_

..-m-p-weem--earm=.

.m.

ei

(

I i

ME,)

c p j POWER GENERATION GROUP g,

NUCLEAR EQUlPMENT DIV SION, BARBERTON WORKS e

QUALITY ASSURANCE N

NONDESTRUCTIVE TESTING i

RADIATION SAFETY f.

F

~

RADIATIOtJ SAFETY OFFICER

11. C. Graber ASSIS T ANT N

i RADIATION SAFETY OFFICER e

O. E. Plinenix l

!l, TRAINING INSTRUCToll TECll!JICAL SPECIALIST L..I. F.111 o t,t, C. A. Nitschke l

8 1:t Shif t I siiitt 3rJ Shif t SAFETY Sul'El; VISORS SAFETY SilPEllVISORS SAFETY SUPEllVISORS HAD: Ill PilEllS fl ADIOGRAF:lEllS

!!ADIOGilAPilERS i

N 3.Schrdekendost, e71 j

l1 lamaon D. Die No

',3 iT :; h K. Pulliam It. 111 gler

2 D. 11rn i n e-J. Irwin W E E. "

g g

l Ch j

on i

I

$[

llOUllLY I: AOIOGRAPilERS llOljitLY II ADIOGRAPi8E!1S liOUllLY HAD:OGilAPilElls

"$R e

.if 00)

(9)

((.)