05000366/LER-1979-058-03, /03L-0 on 790625:while at Power Level of 66%, Control Mass Peaking Factor Discovered Exceeding Design. Caused by Innacurate Calculation of Existing Core Conditions.Computer Data Base Updated

From kanterella
(Redirected from ML19246B558)
Jump to navigation Jump to search
/03L-0 on 790625:while at Power Level of 66%, Control Mass Peaking Factor Discovered Exceeding Design. Caused by Innacurate Calculation of Existing Core Conditions.Computer Data Base Updated
ML19246B558
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/10/1979
From: Thomas Greene
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19246B556 List:
References
LER-79-058-03L, LER-79-58-3L, NUDOCS 7907170219
Download: ML19246B558 (2)


LER-1979-058, /03L-0 on 790625:while at Power Level of 66%, Control Mass Peaking Factor Discovered Exceeding Design. Caused by Innacurate Calculation of Existing Core Conditions.Computer Data Base Updated
Event date:
Report date:
3661979058R03 - NRC Website

text