August 28, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
)
)
TENNESSEE VALLEY AUTHORITY
)
Docket No. 52-047-ESP
)
(Clinch River Nuclear Site Early
)
Site Permit Application)
)
NRC STAFF SECOND REVISED EXHIBIT LIST AND WITNESS CERTIFICATIONS The staff of the U.S. Nuclear Regulatory Commission hereby provides its second revised exhibit list and additional supporting witness certifications for the mandatory hearing on the early site permit application for the Clinch River Nuclear Site. The revised exhibit list is included as and the additional witness certifications are included in Attachment 2. The new exhibit, NRC-019, includes the staffs responses to the Commissions post-hearing questions and the staffs request to make corrections to the record.
Respectfully submitted,
/Signed (electronically) by/
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 (301) 287-9115 Michael.Spencer@nrc.gov Dated at Rockville, Maryland, this 28th day of August 2019
ATTACHMENT 1 NRC STAFF SECOND REVISED EXHIBIT LIST FOR CLINCH RIVER ESP MANDATORY HEARING (AUGUST 28, 2019)
Exhibit Number Panel Number/
Sponsoring Witness(es)
Document Description/Title ADAMS Accession Number (If Applicable)
NRC-001 Anna Bradford SECY-19-0064, Staff's Statement in Support of the Uncontested Hearing for Issuance of an Early Site Permit for Clinch River Nuclear Site (June 21, 2019).
ML19107A241 NRC-002 Anna Bradford Draft Early Site Permit for the Clinch River Nuclear Site (June 21, 2019) (public version).
ML19107A159 NRC-003 Anna Bradford NON-PUBLIC - Draft Early Site Permit for the Clinch River Nuclear Site (Aug. 1, 2019) (non-public version)
ML19158A369 NRC-004 Anna Bradford Draft Summary Record of Decision, Early Site Permit for the Clinch River Nuclear Site (June 21, 2019).
ML19070A028 NRC-005 Anna Bradford NRC Staff Responses to Commission Prehearing Questions (June 26, 2019).
ML19207A235 NRC-006 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Cover Letter (Jan. 18, 2019).1 ML19030A485 NRC-007 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 1 -
Part 1, Administrative Information (Dec. 15, 2017).
ML18003A298 NRC-008 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 2, Site Safety Analysis Report (Jan. 18, 2019).
ML19030A358 1 As the applicant discussed in its cover letter, [t]he portions of the application that include changes from Revision 1 are identified as Revision 2. The portions of the application that did not change from Revision 1 will remain Revision 1 and are not included in this submittal.
Thus, for some portions of the application, the latest revision is Revision 1.
2 Exhibit Number Panel Number/
Sponsoring Witness(es)
Document Description/Title ADAMS Accession Number (If Applicable)
NRC-009A Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 3, Environmental Report (Jan. 18, 2019) (beginning to page 3.9-3).
ML19030A478 NRC-009B Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 3, Environmental Report (Jan. 18, 2019) (page 3.9-4 to end).
ML19030A478 NRC-010 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 1 -
Part 5, Emergency Planning (Dec. 15, 2017).
ML18003A485 NRC-011 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 6, Departures and Exemption Requests (Jan. 18, 2019).
ML19030A479 NRC-012 Anna Bradford NON-PUBLIC - Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - Part 7, Withheld Information (Jan. 18, 2019).
ML19029A855 NRC-013A Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 8, Enclosures (Jan. 18, 2019) (beginning to end of Appendix B.3 - Rock Pressuremeter Report).
ML19030A568 NRC-013B Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 8, Enclosures (Jan. 18, 2019) (beginning of Appendix C -
Downhole Geophysical Test Logging Report to page C1153 of the report).
ML19030A568 NRC-013C Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 8, Enclosures (Jan. 18, 2019) (from page C1154 of the Appendix C - Downhole Geophysical Test Logging Report to the end of the report).
ML19030A568 NRC-013D Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 -
Part 8, Enclosures (Jan. 18, 2019) (from Appendix D - Surface Geophysical Test Data to the end of Enclosure 8).
3 Exhibit Number Panel Number/
Sponsoring Witness(es)
Document Description/Title ADAMS Accession Number (If Applicable)
NRC-014A Anna Bradford Final Safety Evaluation Report for the Early Site Permit Application for the Clinch River Nuclear Site (June 2019) (public version).
ML19162A157 NRC-014B Anna Bradford NON-PUBLIC - Final Safety Evaluation Report for the Early Site Permit Application for the Clinch River Nuclear Site (June 2019) (non-public version).
ML19162A166 NRC-015A Anna Bradford NUREG-2226, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site; Final Report, Volume 1, Chapters 1 to 12 (Apr. 2019).
ML19073A099 NRC-015B Anna Bradford NUREG-2226, Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site; Final Report, Volume 2, Appendices (Apr. 2019).
ML19073A109 NRC-016-R Anna Bradford Staff Presentation Slides - Overview (Aug. 2019).
NRC-017 Anna Bradford Staff Presentation Slides - Safety Panel (Aug. 2019).
NRC-018 Anna Bradford Staff Presentation Slides - Environmental Panel (Aug. 2019).
NRC-019 Tamsen Dozier, Michelle Hart, Michael Scott NRC Staff Responses to Commission Post-Hearing Questions and Request for Additional Record Corrections (Aug. 28, 2019).
ATTACHMENT 2 Witness Certifications of Tamsen Dozier, Michelle Hart, and Michael Scott
August 28, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
)
)
TENNESSEE VALLEY AUTHORITY
)
Docket No. 52-047-ESP
)
(Clinch River Nuclear Site Early
)
Site Permit Application)
)
CERTIFICATION OF TAMSEN DOZIER SPONSORING TESTIMONY IN EXHIBIT NRC-019 INTO THE HEARING RECORD I, Tamsen Dozier, do declare under penalty of perjury that the statements in the NRC staff response to question 12 and the correction regarding testimony on Final Environmental Impact Statement Section 10.2 in the NRC Staff Responses to Commission Post-Hearing Questions and Request for Additional Record Corrections (August 28, 2019) (Exhibit NRC-019), were prepared by me or under my direction; are true and correct to the best of my information, knowledge, and belief; and are adopted by me as my sworn testimony in this proceeding.
Executed in Accord with 10 CFR 2.304(d)
Tamsen Dozier Project Manager Division of Licensing, Siting, and Environmental Analysis Office of New Reactors U.S. Nuclear Regulatory Commission Mail Stop O7-E1 Washington, DC 20555-001 Executed at Rockville, Maryland, this 28th day of August 2019
August 28, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
)
)
TENNESSEE VALLEY AUTHORITY
)
Docket No. 52-047-ESP
)
(Clinch River Nuclear Site Early
)
Site Permit Application)
)
CERTIFICATION OF MICHELLE HART SPONSORING TESTIMONY IN EXHIBIT NRC-019 INTO THE HEARING RECORD I, Michelle Hart, do declare under penalty of perjury that the statements in the NRC staff responses to questions 1, 3, 4, 7, and 11 in the NRC Staff Responses to Commission Post-Hearing Questions and Request for Additional Record Corrections (August 28, 2019) (Exhibit NRC-019), were prepared by me or under my direction; are true and correct to the best of my information, knowledge, and belief; and are adopted by me as my sworn testimony in this proceeding.
Executed in Accord with 10 CFR 2.304(d)
Michelle Hart Senior Reactor Engineer Division of Advanced Reactors Office of New Reactors U.S. Nuclear Regulatory Commission Mail Stop O7-D21 Washington, DC 20555-001 Executed at Rockville, Maryland, this 28th day of August 2019
August 28, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
)
)
TENNESSEE VALLEY AUTHORITY
)
Docket No. 52-047-ESP
)
(Clinch River Nuclear Site Early
)
Site Permit Application)
)
CERTIFICATION OF MICHAEL SCOTT SPONSORING TESTIMONY IN EXHIBIT NRC-019 INTO THE HEARING RECORD I, Michael Scott, do declare under penalty of perjury that the statements in the NRC staff responses to questions 2, 5, 6, 8, 9, and 10 in the NRC Staff Responses to Commission Post-Hearing Questions and Request for Additional Record Corrections (August 28, 2019) (Exhibit NRC-019), were prepared by me or under my direction; are true and correct to the best of my information, knowledge, and belief; and are adopted by me as my sworn testimony in this proceeding.
Executed in Accord with 10 CFR 2.304(d)
Michael Scott Director Division of Preparedness and Response Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Mail Stop O9-C28 Washington, DC 20555-001 Executed at Rockville, Maryland, this 28th day of August 2019