ML19224B532
| ML19224B532 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/08/1977 |
| From: | METROPOLITAN EDISON CO. |
| To: | |
| References | |
| OSC-770908, TM-0268, TM-268, NUDOCS 7906150260 | |
| Download: ML19224B532 (5) | |
Text
.
TMI DOCUMENTS DN'- b d b DOCUMENT NO:
COPY MADE 0'I
[ 7f 0F DOCUMENT PROVIDED BY
/
METROPOLITAN EDISON COMP /diY.
fhb5?$
'Jilda R. Mullinix, NRC 7906150 h
<.c n O
b
-W e
4
^
09/ C/ 77 tEliCLO,1UR E_l;_.. RE AC T IVI T Y ;CALCULAT I ONr PART I:
1.
Reference Conditions:
(Circle appropriate reference conditicns).
EstimatTd Reactivity Balance Shutdown Critical at Power Margin Position _
T Average 582 F 532 F 532 F Average NI Po..e>
100%
0%
0%
Control Rod Position 100%
100%
100%
2.
Actual Unit Status.
Sd(
oF.
n.
Tave O
LFP:
B.
Aver:.ge NI Power O
%FP NI-5 O
%FP
!! I - 6_
N I - 7_
O
%FP O _%FP NI-8 Care _[Y _EFPD.
C.
D.
Boron Concentration
[ 2 7 ppm.
5 f dIO
- t. 9 'c]
[.
Rml Position:
Group 1-4
"D Group S h
' lD Group ti/7 O
'"J D 7
Group 8
" 'el0
';0 T E :
All positive (+) and negative (-) reactivity calves will be t a',.en frca the fig;res.
/[, /;
rnK/K 3.
Fuel Excess 2.e ctivity (Fig. 1/lA) 1 22.0 t
- [A'
Ob/03[77
- ENC.LOSURE ];; REACT _IVIT'(. CALCULATI'0Il 1 PART I.
1.
Reference Conditions:
(Circle appropriate reference conditions).
~~
Estimated Reactivity Balance Shu tdo in Critical at Power "argin Position T Average 582'F 532 F 532 C 0
Average ?!I Power 100%
0%
0%
Contrcl Pod
_ Position 1007.
100%
1005 2.
Actual Unit Status.
A.
Tave 5'76 F.
B.
Acreage ill Pcwer O
SFP:
flI-5 O
";FP fil-6 O
%FP T11-7 O
%FP fil-8 LFP C.
Cor e 9,/ I FPD.
,E Bm on Concentra Lion 46 7 4 yt 2 = y6y. Sffin b D.
ppm.
F.
Rod Position:
Group 1-4 O
%UD
'/}6 bOC Group 5 _
C TWD Group 6/7 0
Swo Group 8 27 M!D
':0 T E :
All positive (+) and r g ative (-) reactivity. wives will be tden fecm the fipres.
3.
Fuel Excess Reactivity (Fig. 1/1A)
-r ! b, 7
":K/K i
22.0
-e
- M M
N*
A.
Groups 1-7 (Fig. 2/2A/2B/3) -9 dY tak/k tiOTE-For shutdown l'argin assume 0% uithdrmn for Groups 1-7.
B.
Group 8 (f.PSR) (Fg. 4A/4G) 3 8
%ak/k C.
Total Reactivity of Rods (Gp 1-8) 4a +4b= -/0,62 %ak/k.
Baron Reactivity (Fig 5) d h
%ak/k. maj 6s2 T C""*
5.
A.
Boron Ratio (Depletion) (lig. SA)
.cf q 7,f
- Y. / L(%aK/K B.
Ef fective Boron '.l orth 5 x SA=
6.
Xenon Reactiv;ty:
A.
For Reactivity Balance at Power use Figure 68.
B.
For Shutdown Margin use Figure 6A (if at equilibriu.a) or Section 4.4 for transient conditions.
C.
For ECP see Section 4.4
- Y, 9 Cak/k 7.
Reactivity arsociated with temperature change:
A.
Reactivity coefficient (Fig 7A/B)
. (6 h
%ak/k/ F.
B.
Reactivity due to tenperature change (7a) X (Tave - Reference Condition)
~
t k/k liOTE:
For shutdown margin '.. hen the reactor is a t p:<,.er, use 0%ak/k for temperature change reactivity.
8.
Reactivity associated with power change:
A.
Reactivity due to operating belcw 100% FP,210 1 0 't 3 f JU (Fig. 8)_
$nk/k B.
/I
_"d / k 9.
Sa.oriuni Buildup after Shutdcwn time since,shutdcwn days (Fig. 9) (for SCM, ECP cnly)
~.0/
"s a k / k l:0TE:
Insure t at the correct signs have teen recorded fec:a h
figures.
l' Stuck Rnd Criteria A.
For Shutdc..n
- . cg i n u s e + 3. 91 :'c.:: { K 7 0 B.
For St. Pc.,er Calence or ECP use 0:'d/k t[
" '/k t
^
11.
f;et Reactisity (p):
p (net) = p (fuel) + p (rods) + p(boron) + p (xe) + p (temp) ' p
~
(power) + p (sm) + p (stuck rod).
Add the values recorded for the following steps:
p (11) = p (3) + p (4) + p (5) + p (6) + p (7) + p (8) + p (9) + p (10)
- Q.04b
$ b.k/n Sh\\dow n p
(net) =
%ok/k tiOTE:
Refer to Limits and Precautions section 2.0.
A.
Shutdown Margin, p (net), n'ust be trore negati c' than:
-25aK/K when Kef f > 1,(TS 3.1.1.1.a)
-l %aK/K when Kef f < 1 (TS 3.1.1.1.b)
B.
The reactivity balance must be within + 0.55 ak/k (steady statt or + 0.8% ok/k (transient).
Calculated by: [ k ]l[Ib. y yzG/79 06 3j Operator Date/ time Approved by:
SFitt Foreman Da te/ ti me RETLIR:1 TO l;UCLE AR Ei;GI ;EER D
'[ } b j u -)
p-9
,/
24.0 3,w e
~
g
SOURCE RELEASE TERM CM.CULATIO:;S U !IT 2
.!~
^t<'sm" 1/16/78 Indine g le 3as_
F_ c3 j' lent ib::i tor CFM 1.
HP-R-219 c/m/m Scd6 c/m 1.
AH-FR-5720 ~
(Sertice Bldg)
CFM 2.
Fica CFM CFM 2.
AH-FR-5284 (Aux. Sldg) 3.
Ccnstcnt 4.5x10 L
l 3.
AH-FR-5256 CFM
~0 (Aux. Sldg) 3.
Constant 1.35xlG-uCi uCi sec
-s e c 4.
AH-FR-5659 CFM 4.
Mult, lx2x3 (F.H. Bldg) 5.
4/10 Ci/sec Ci/sec 5.
AH-FR-5053 CFM 5
(Rx. Bldg) 6.
AH-FR-5075 CFM (Rx. Sidg) 7.
Total 1 thru 6 CFM (I'? x = 275,500)
'w
'Ad HP-R-214 Centainment leak Rate lip - R-214
- Icdir e
?'cble Gas l4ter Reading (Ci/tec)
(Ci/sec)
Total Scurce Tern 2 R/hr
.0006 8.5 Icdine h'oble Gas 4 R/hr
.0011 17.5 1.
HP-R-219 6 R/hr
.0017 26 2.
HP-R-214
. c cc 4
% / __
8 R/hr
.002; 35 3.
Add 1 & 2 Ci/sec Ci/sec Thhr
.0023 44 12 R/hr
.0033 53
- HP-R-214 Is shield 3d.
Rx. bldg radiation level is 1C0 tiites Hi-R-214 meter reading.
The o cbers specified
-in this Table are Meter O ea di ags T i rc.e_
Oate
. Calculations by j i (;
.A m, v
.u..
Data Shtet #la
- * ~ * - -
.