ML19219A503

From kanterella
Jump to navigation Jump to search

Letter to D. Stoddard NRCs Analysis of the Initial and Updated Decommissioning Funding Plans for the Surry Power Station, Unit 1&2; North Anna Power Station, Units 1&2; Kewaunee Power Station, and Milestone Power Station ISFSI
ML19219A503
Person / Time
Site: Millstone, Kewaunee, North Anna, 07200002, 07200055
Issue date: 08/08/2019
From: John Mckirgan
Spent Fuel Licensing Branch
To: Stoddard D
Dominion Energy Services
Longmire P
References
CAC 001028, EPID L-2017-FPR-0002, EPID L-2017-FPR-0004, EPID L-2017-FPR-0036, EPID L-2017-FPR-0042, EPID L-2017-FPR-0047, EPID L-2017-FPR-0066
Download: ML19219A503 (5)


Text

August 8, 2019 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Services, Inc.

Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060

SUBJECT:

NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF THE INITIAL AND UPDATED DECOMMISSIONING FUNDING PLANS FOR THE SURRY POWER STATION, UNITS 1 AND 2; NORTH ANNA POWER STATION, UNITS 1 AND 2; KEWAUNEE POWER STATION; AND MILLSTONE POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS

Dear Mr. Stoddard:

By letter dated December 17, 2012, Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc. and Dominion Nuclear Connecticut, Inc. (collectively, Dominion) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, initial decommissioning funding plans (initial DFPs) for the independent spent fuel storage installations (ISFSIs) at Surry Power Station, Units 1 and 2 (Surry), North Anna Power Station, Units 1 and 2 (North Anna),

Kewaunee Power Station (Kewaunee), and Millstone Power Station (Millstone) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13002A036). By letter dated December 13, 2012 (ADAMS Accession No. ML12353A032), Old Dominion Electric Cooperative (ODEC) submitted, for NRC staff review and approval, an initial DFP for the North Anna ISFSI.

In addition, by letters dated December 2, 2015, and December 15, 2015, Dominion and ODEC submitted, also for NRC staff review and approval, updated decommissioning funding plans (updated DFPs) for the ISFSl at North Anna (ADAMS Accession Nos. ML15342A039 and ML16020A001). By letters dated December 2, 2015, and December 9, 2015, Dominion submitted, also for NRC staff review and approval, updated DFPs for Surry, Millstone, and Kewaunee (ADAMS Accession Nos. ML15342A038, ML15342A064, and ML15349B005, respectively). In accordance with Title 10 of the Code of Federal Regulations (10 CFR),

Sections 72.30(b) and (c), and using NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance, the NRC staff reviewed the initial and updated DFPs submitted by Dominion and ODEC, including the initial and updated decommissioning cost estimates (DCEs) and the method of assuring funds for decommissioning.

Pursuant to 10 CFR 72.30(b), each holder of, or applicant for, a license under Part 72 must submit for NRC review and approval a DFP containing information on how reasonable assurance will be provided that funds will be available to decommission its ISFSI. The DFP must contain a detailed DCE, in an amount reflecting: (1) the cost of an independent contractor

to perform all decommissioning activities, (2) an adequate contingency factor, and (3) the cost of meeting the 10 CFR 20.1402 unrestricted use criteria (or the cost of meeting the 10 CFR 20.1403 restricted use criteria, provided the licensee can demonstrate its ability to meet these criteria). The licensees DFP must also identify and justify using the key assumptions contained in the DCE. Further, the DFP must describe the method of assuring funds for ISFSI decommissioning, including means for adjusting cost estimates and associated funding levels periodically over the life of the ISFSI. Additionally, the DFP must specify the volume of onsite subsurface material containing residual radioactivity that will require remediation to meet the criteria for license termination, and contain a certification that financial assurance for ISFSI decommissioning has been provided in the amount of the DCE.

The NRC staff reviewed and analyzed the information submitted by Dominion and ODEC in their initial DFPs for North Anna, and Dominions initial DFPs for Surry, Kewaunee, and Millstone on how reasonable assurance will be provided that funds will be available to decommission the ISFSIs, including the amount of the DCEs, and the method of assuring funds for decommissioning. As a result, the NRC staff issued a request for additional information (RAI) by letter dated July 18, 2013 (ADAMS Accession No. ML13200A025). Dominion responded to the NRCs RAI on September 30, 2013 (ADAMS Accession No. ML13283A085).

Separately, on October 21, 2013 (ADAMS Accession No. ML13296A023), ODEC submitted a response to the request for additional information.

In their initial DFPs, Dominion and ODEC estimated that the total cost to decommission the ISFSI at North Anna for unrestricted use to be $1,857,000 in 2012 dollars. Dominion estimated that the total cost to decommission the ISFSIs at Surry, Kewaunee, and Millstone for unrestricted use is $1,840,000, $1,283,000, and $1,912,000, respectively, in 2012 dollars.

Based on its analysis of Dominion and ODECs initial DFPs for North Anna; Dominions initial DFPs for Surry, Kewaunee, and Millstone; and responses to the RAIs, the NRC staff finds that the submitted DCEs: are based on reasonable costs of a third party contractor; include an adequate contingency factor; meet the 10 CFR 20.1402 criteria for unrestricted use; and are based on reasonable and documented assumptions. Therefore, the NRC staff finds that the DCEs adequately estimated the cost to carry out required ISFSI decommissioning activities prior to license termination, and that the DCEs are acceptable.

Dominion and ODEC relied on external sinking funds as financial assurance for ISFSI decommissioning, a method authorized by 10 CFR 50.75(e) and 10 CFR 72.30(e)(5). The external sinking funds are based on site-specific cost estimates that include estimated ISFSI decommissioning costs. The NRC staff finds that the aggregate dollar amount of the licensees financial instruments provides adequate financial assurance to cover its cost estimates, and therefore, that these financial instruments are acceptable.

Pursuant to 10 CFR 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the initial DFPs required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination (updated DFPs). The updated DFPs must update the information submitted with the original or prior-approved plan. In addition, the updated DFPs must specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

In the updated DFPs, Dominion and ODEC estimate that the total cost to decommission the ISFSI at North Anna for unrestricted use is $1,580,600 in 2015 dollars. Dominion estimated that the total cost to decommission the ISFSIs at Surry, Kewaunee, and Millstone for unrestricted use is $1,764,000, $1,847,000, and $1,431,000, respectively, in 2015 dollars. The updated decommissioning cost estimates (updated DCEs) considered the requirements of 10 CFR 72.30(c)(1)-(4) and the licensees provided a discussion of each requirement. The licensees stated:

1. There have been no reported spills affecting the ISFSIs.
2. There have been no facility modifications affecting the ISFSI DCEs.
3. There are no changes in authorized possession limits affecting the DCEs.
4. No actual remediation costs have been incurred.

The licensee provided the following response to 10 CFR 72.30(c)(3) for Kewaunee.

The ISFSI DCE is based on an ISFSI that is sized to accommodate the spent fuel generated through permanent cessation of operations, which occurred in May 2013. By letter dated March 15, 2019 (ADAMS Accession No. ML19081A117), Dominion Energy Kewaunee, Inc. submitted the following clarifying sentence for Kewaunees updated DFP. There are no changes in authorized possession limits affecting the DCE.

Based on its review of Dominion and ODECs submittals, the NRC staff finds that the updated DCEs: are based on reasonable costs of a third party contractor; include an adequate contingency factor; contain funds sufficient to meet the 10 CFR 20.1402 criteria for unrestricted use; and are based on reasonable and documented assumptions. Therefore, the NRC staff finds that the updated DCEs adequately estimate the cost, at this time, to carry out required ISFSI decommissioning activities prior to license termination, and that the updated DCEs are acceptable.

Dominion and ODEC currently rely on external sinking funds as financial assurance for ISFSI decommissioning, a method authorized by 10 CFR 50.75(e) and 10 CFR 72.30(e)(5). The external sinking funds are based on site-specific cost estimates that include estimated ISFSI decommissioning costs. The NRC staff reviewed the licensees updated DFP submittals, and finds that the aggregate dollar amount of the licensees financial instruments provide adequate financial assurance to cover its updated DCEs.

Therefore, based on its review, the NRC staff finds that the initial and updated DFPs contain the information required by 10 CFR 72.30(b) and (c) and that Dominion and ODEC have provided reasonable assurance that funds will be available to decommission the North Anna ISFSI.

Additionally, Dominion has provided reasonable assurance that funds will be available to decommission the Surry, Kewaunee, and Millstone ISFSIs.

In addition to the NRC staffs review of Dominion and ODECs initial and updated DFPs for North Anna, and Dominions initial and updated DFPs for Surry, North Anna, Kewaunee, and Millstone, the NRC staff completed environmental reviews for Surry, North Anna, Kewaunee, and Millstone. On August 5, 2019, the NRC staff published the results of each review in an environmental assessment and finding of no significant impact in the Federal Register (84 FR 38069; 84 FR 38075; 84 FR 38063; and 84 FR 38073), for Kewaunee; Millstone; North Anna; and Surry, respectively. The NRC staff determined there were no environmental impacts from the NRC staffs review and approval of Dominion and ODECs DFPs.

If you have any questions regarding this matter, please contact me at (301) 415-5722 or Pamela Longmire, of my staff, at (301) 415-7465.

Sincerely,

/RA/

John McKirgan, Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket Nos.: 72-02, 72-16, 72-56, 72-55, 72-64, and 72-47 CAC No.: 001028 EPIDS: L-2017-FPR-0066; L-2017-FPR-0047; L-2017-FPR-0002; L-2017-FPR-0004; L-2017-FPR-0036; and L-2017-FPR-0042

SUBJECT:

NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF THE INITIAL AND UPDATED DECOMMISSIONING FUNDING PLANS FOR THE SURRY POWER STATION, UNITS 1 AND 2, NORTH ANNA POWER STATION, UNITS 1 AND 2, KEWAUNEE POWER STATION, AND MILLSTONE POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS, DOCUMENT DATE: August 8, 2019 DISTRIBUTION:

SFM R/F JMcKirgan, NMSS ABowers, NRR KLois, NRR SHarwell, NRR MHenderson, NRR BWatson, NMSS TCarter, NMSS MWoods, OGC NMertz, OGC RidsNrrPMMillstone.Resource@nrc.gov RidsNrrPMNorthAnna.Resource@nrc.gov RidsNrrPMSurry.Resource@nrc.gov LOCATION: G:/SFST/72.30 Decommissioning Funding Plans/CLOSEOUT/Dominion/Dominion Closeout Letter (NLO).docx ADAMS Package No.: ML19219A503 OFFICIAL RECORD COPY OFFICE NMSS/DSFM NMSS/DSFM OGC NMSS/DSFM NAME PLongmire WWheatley NMertz via email JMcKirgan DATE 5/29/19 6/12/19 3/22/19 8/08/19