f November 29, 1979 BECo Ltr. #79-255 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Docket Number 50-293 License DPR-35

Subject:

REVISED October, 1979 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the revision to the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

This revision changes line 23 of the " Operating Data Report" and also indicates the scheduled shutdown for refuel in 1980. The revision to line 23 is detailed on the " Unit Eurdowns and Power Reductions" Report Numbers if and 16.

Respectfully Submitted, P. J. McGuire Station Manager Nuclear Operations GGW:ep cc: Director Office of Inspection and Enforcement Office of Nuclear Regulatory Co= mission U. S. Naclear Regulatory Commission Washington, D.C.

20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 1502 235 631 Park Avenue King of Prussia, PA 19406

/)ooS 5

/!/

gW 7912050 i

w

' OPERATINC DAT.'. P" PORT

,9 0

9,0,9 3'd o

50-293 DOCRETNO.

-Q s

au m

11/1/ 6_

narc COMPI.ETED ley G.G. Whitney TEl.EPl!ON1; 6I7-746-7900 OPER ATING c.T.iTI(S i

Pilgritt I Not'5 I. Unit Name:

i October, 1979

2. Report.m;I,er: d:

1990.

n

3. Licensed Theun..I Po.ver IMWL):

678.

4. Nameplate Ra:in.(C:o>s.'.lWe):

e 655.

5. Design Electrical R::ing (.W MWe):

i 690*

6. Maximum Depenti:Me Cap: city (Gross MWe): 670*

l

7. Maxirnum Dep.nd::Ue C:p:ci:y (Net MWe):

S. If Chan;cs C: cur in Capacity Rain;s (Irems Numlxr 3 Tarouna,) Sinc: La>t Report.Give Reasons:

l NONE

9. Power Level To Whrh Restri::cd.!f Anv (Net MWeP
10. Reasons For Restrie: ions. lf Any:

N/A This Month Yr..t o-Da r c Cu:aulathe 745.0 7296.0 60132 f)__..

11. Hours in Reporting i'eriud.

7'7 0 Al/S '

L ' 16 0

12. Nar-her Or liners !>.::c:or Was Critic:1 0.0 0.n 0.0, _,
13. Rea: tor Re ^t.e Shn:down !!ours 720.2 6365.9 12088.5 1-i. linurs Genera.cr Oa.L:ne 0.0 C.o 0.0 l
15. Unit Reserve Shutdtsn IIc.urs 1260768.0 11813304.0 7_0_2 S :! 0!. 0 l
16. Gross Therm:l Ene:;y Cenmted (MWH) 434510.0 40655'O.0 23196314.0 l
17. Gross Electrien! Energy Generered (MWil) e1875S.0 3913643.0 22275212.0 IS. Net E!.:::rical En. ;y Genersted (MWH) 96.7 67.3 H.6
19. Unit Servie: l'a: tor OI'3 0

'O

20. Unit Asailat:iuty Fc: tor oJ.y o0.1 22*0
21. Unit Capacity F.icter (thic; MDC Net) 85.8 81.9 56.3 _
22. Unit Cap:ci:k Facti r (thinr.18ER Net) 3.3 12.3 1,1_.,,0,_,,
23. Uni: Fuice.10.: tac-: Rate
21. Shutilowns i.e::cui.: d Oser Nest 6 Months lTs pe. Date.and 1)c..iti.m of E.tchi:

Refuel Outage, cor :nencing January 5,1980 to gril 7, 1980.

25. If Shut 11oe.a At End Oi tterort Perin.l. Esten:ted Ibte ut' St.utup: Ei.U._0 5 A U '.'G l'oi ce:nt A s.iie s ed 2b. Units in To:t Natus iPnot to Canuncrent Orrr.:tionI:

1502 236 INI I I A !. CP.!T'.C A !.!TY l

INilI A I. !.l. ECTRIClTY i

CO'.:MI:i:CI A L OPERA T:0N

/

/p

.I 77t 260 RS~

4

\\

.I DCCl:ET NO. 50-293 UNIT SliUTDOWNS AND POWEll REDUCTIONS Utill NA!.:E Pilcrin 1 p.., r; 11/1/ 79 COMPI ETEl: !!y G.G.Ubirney REPORT MOTITil OCTOBER, 1979 n,.t ra:~.i'E 617-746-7900

.! E 3

Yk licensec E -t, ho Cause A C arective

7.

68 At es..n t o 5?

5 S55 15cni N".

DJ8c n u?

j' Pseseni I econence jE

}dg Itcport v H

D

~

14 08/28/79 F

0.0 B

3 79-33/1X-0 CZ ZZZZZZ During Recovery from loss of of f-site M

power event, B Condensate' Pump failed.

Repairs to Pump and Motor continue.

b 15 10/15/79 F

13.0 11 3

1.ow Suction Pressure to Feed Pumps c:::::

Caused "C" RFP to Trip resulting in M

D low water scram.

16' 10/25[79 F

11.8-

'I 3

Inadvertent mechanical shock applied M

during surveillance.

G ::'

I 2

3 4

F: F.n ed ite.ason:

Mc.nnd:

Exhibii G. Insieuetions

.o heparation ut' Daia S. S li(Juleil' AT inipment Failure (Lxplain)
1. Manual

!s-:.l.:inienance oi Tc e 241anual Scr.nn.

1.nin Sheets 1.n 1.:,ensee

~

W C l<efuti:ng 1 Aniomatic Sct.nn.

then: 1:cp.ni (1 Elt ) I;le INilREG.

O

1) !<e. et:iory Itesisictina 4 Other (lixplain) 01011 N

1 4,.7 tos Tr.nning & l itense Exa :.inatina

17..Lin o n ni s.o r. a 5

N

t. :)p aienn..I 1.nus a thpt.nni Esli.bn i. Same Sonne l')f 77)

U 11 ( n he r 11. s pl.in. )

i N