ML19207B838
| ML19207B838 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/29/1979 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19207B839 | List: |
| References | |
| 79-172, NUDOCS 7909050405 | |
| Download: ML19207B838 (1) | |
Text
BOSTON EOsSON COMPANY GENER AL OFFICES 900 SQYLSTON STREET DasTON, M ASSACHUSETTS D 219 9
- c. c arc ANooaN,N, August 29, 1979 S U PE RI NT E N O E N T NUCLE AR OPERAf tDNS DEPARTMENT BEC, Ltr. #79-172 Mr. Boyce H. Grier Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.
19406 License No. DPR-35 Docket No. 50-293 Radioactive Effluent Release Report January 1 through June 30, 1979
Dear Sir:
In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.C.1, Boston Edison Company hereby submits 2 copies of the Pilgrim Nuclear Power Station Radioactive Effluent Release Report.
The reporting period is from January 1, 1979 through June 30, 1979.
The report format and content are in accordance with NRC Regulatory Guide 1.21:
MEASURING, EVALUATING, AND REPORTING RADIOACTIVITY IN SOLID WASTES AND RELEASES OF RADIOACTIVE MATERIALS IN LIQUID AND GASEOUS EFFLUENTS FROM LIGHT-WATER COOLED NUCLEAR POWER PLANTS, Revision 1, Tables lA, 1B, 1C, 2A, 2B, 3, 4A 4A-2 and Supplemental Information.
Very truly yours,
- )
I nK< -
(2 copies)
/
cc:
Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office
.f Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington,
D. C. 20555 (6 copies)
Commonwealth of Massachusetts Director, Executive Office of Manpower Affairs Dept. of Labor & Industries Division of Occupational Hygiene 39 Boylston Street (9th floor)
Boston, Ma.
02116 (1 copy)
CB/gs
" ^ *""y>
n g o.-~s 7 9 09 0 5 0 yoS,
'