ML19099A312

From kanterella
Jump to navigation Jump to search
Design Certification Testing Inspection of Nuscale Power, LLC, Emergency Core Cooling System Valve Design Demonstration Testing
ML19099A312
Person / Time
Site: NuScale
Issue date: 04/10/2019
From: Kerri Kavanagh
NRC/NRO/DCIP/QVIB1, NRC/NRO/DCIP/QVIB2
To: Afshar C
NuScale
Armstrong A
References
Download: ML19099A312 (2)


Text

April 10, 2019 Cyrus Afshar Supervisor Regulatory Affairs NuScale Power, LLC 1100 NE Circle Blvd. Suite 200 Corvallis, OR 97330

SUBJECT:

DESIGN CERTIFICATION TESTING INSPECTION OF NUSCALE POWER, LLC, EMERGENCY CORE COOLING SYSTEM VALVE DESIGN DEMONSTRATION TESTING

Dear Mr. Afshar:

This letter documents the Nuclear Regulatory Commission (NRC) staffs plan to perform a Design Certification Testing Inspection of NuScale Power, LLC (NuScale), as it pertains to the design and testing activities conducted for the NuScale Design Certification Application. As discussed in a telephone call on April 2, 2019, the inspectors plan to be at the Target Rock facility in Farmingdale, New York beginning Monday, June 3, 2019, and will conduct the inspection through Friday, June 7, 2019. Subsequent to the inspection, an inspection report will be issued and transmitted to you via letter. The lead inspector for this effort is Mr. Aaron Armstrong; you may contact him at (301) 415-8396 or via electronic mail at Aaron.Armstrong@nrc.gov.

This inspection activity has been assigned the following docket number: 05200048. Please reference this number on any correspondence relating to this inspection activity sent to the NRC.

Sincerely,

/RA/ JJacobson for Kerri A. Kavanagh, Chief Quality Assurance Vendor Inspection Branches 1 & 2 Division of Construction Inspection and Operational Programs Office of New Reactors Docket No.: 05200048

ML19099A312 NRO-002 OFFICE NRO/DCIP NRO/DCIP NAME AArmstrong KKavanagh (JJacobson for)

DATE 04/10/19 04/09/19