ML19022A081
| ML19022A081 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/10/2019 |
| From: | Emily Larson Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19022A117 | List: |
| References | |
| GNRO-2019/00001 | |
| Download: ML19022A081 (7) | |
Text
A
- =~ Entergy GNR0-2019/00001 January 10, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Dear Sir or Madam:
Updated Final Safety Analysis Report Submittal Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 391 50 Eric A. Larson Site Vice President Grand Gulf Nuclear Station Tel: 601-437-7500 10 CFR 50.71(e) 10 CFR 54.37(b)
Pursuant to the §10 CFR 50.71 (e) and 50.4(b)(6), Entergy Operations Inc. (Entergy) hereby submits one pdf copy on CD-ROM (Enclosure) of the Grand Gulf Nuclear Station (GGNS)
Updated Final Safety Analysis Report (UFSAR). The UFSAR pdf is a complete copy of the 10 CFR 50 Appendix B controlled copy of the UFSAR. This revision of the UFSAR includes changes made in the facility as described in the UFSAR during the period of May 1, 2016 through November 30, 2018, and includes changes from Refueling Outage 21 which ended on July 19, 2018. A file is included on the CD-ROM named "GGNS Affected pages.pdf' which provides a list the revised pages. In addition, one pdf copy of a redacted version of the UFSAR is included on a second CD-ROM (Enclosure).
Pursuant to the 10 CFR 50.71(e), Attachment 1 contains a list of evaluations performed in support of conclusions that changes did not require a license amendment in accordance with § 50.59(c)(2).
In addition, pursuant to the requirements of §10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of §10 CFR 54.37(b) for Holders of Renewed Licenses," the UFSAR update required by §10 CFR
- 50. 71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of Time-Limited Aging Analyses in accordance with §10 CFR 54.21. There were no newly identified SSCs subject to aging management review or evaluation during the specified period.
GNR0-2019/00001 Page 2 of 2 This letter contains no new commitments. If you have any questions or require additional information, please contact Douglas Neve at 601-437-2103.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 101h day of January 2019.
Si~ly'.
z,,Cr~
Eric A. Larson EAL/tdf Attachments: 1.
- 2.
1 OCFRS0.59 Evaluation Summary Report Pre-Flight Report for UFSAR pdf Files cc:
NRC Region IV - Regional Administrator NRC Senior Resident Inspector, Grand Gulf Nuclear Station State Health Officer, Mississippi Department of Health NRR Grand Gulf Project Manager
GNR0-2019/00001 to GNRO 2019-00001 1 OCFR50.59 Evaluation Summary Report
GNR0-2019/00001 Page 1 of 1 Evaluation #
2018-003-ROO Grand Gulf Nuclear Station 1 OCFR50.59 Evaluation Summary Report lnitiatinq Document 50.59 Summary EC 78627 /
Revised the Cycle 22 reload licensing to LBDCR 2018-066 incorporate cycle specific off-rated power and exposure dependent MCPR and LHGR operatinq limits.
GNR0-2019/00001 to GNRO 2019-00001 Pre-Flight Report for UFSAR pdf Files
GNR0-2019/00001 Page 1 of 2 Pre-Flight Report for GGNS UFSAR pdf Files This document summarizes the preflight report for pdf Enclosures to the letter GNR0-2019/00001. The follo~ing files do not pass NRC pre-flight criteria, but text is word searchable with clarity/legibility of high quality.
Document Title and Electronic Filename Preflight Reason Status Chapter 1 Introduction And General Resolution of color and grayscale images is Description Of Plant Failed lower than 298 pixels per inch GGNS UFSAR Chapter 1.pdf (10 matches on 8 pages)
Chapter 2.0 Site Characteristics Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 2.pdf lower than 298 pixels per inch
( 434 matches on 418 paqes)
Chapter 3.0 Design Criteria - Structures, Failed Resolution of color and grayscale images is Components, Equipment, And Systems lower than 298 pixels per inch GGNS UFSAR Chapter 3.pdf (648 matches on 516 pages) 4.0 Reactor Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 4.pdf lower than 298 pixels per inch (56 matches on 52 paqes)
Chapter 5 Reactor Coolant System And Failed Resolution of color and grayscale images is Connected Systems lower than 298 pixels per inch GGNS UFSAR Chapter 5.pdf (62 matches on 60 pages)
Chapter 6.0 Engineered Safety Features Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 6.pdf lower than 298 pixels per inch (384 matches on 352 paaes)
Chapter 7.0 Instrumentation And Control Failed Resolution of color and grayscale images is Systems lower than 298 pixels per inch GGNS UFSAR Chapter 7.pdf (52 matches on 52 pages)
Chapter 8.0 Electric Power Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 8.pdf lower than 298 pixels per inch (14 matches on 14 paqes)
Chapter 9.0 Auxiliary Systems Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 9.pdf lower than 298 pixels per inch (95 matches on 92 paaes)
Chapter 10.0 Steam And Power Conversion Failed Resolution of color and grayscale images is System lower than 298 pixels per inch GGNS UFSAR Chapter 1 O.pdf
( 18 matches on 18 pages)
Chapter 11. O Radioactive Waste Management Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 11.pdf lower than 298 pixels per inch (28 matches on 28 paqes)
Chapter 12. 0 Radiation Protection Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 12.pdf lower than 298 pixels per inch (19 matches on 18 paaes)
Chapter 13. 0 Conduct Of Operations Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 13.pdf lower than 298 pixels per inch
( 1 match on 1 paqe)
Chapter 14.0 Initial Test Program Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 14.pdf lower than 298 pixels per inch (7 matches on 7 pages)
Chapter 15.0 Accident Analyses Failed Resolution of color and grayscale images is GGNS UFSAR Chapter 15.pdf lower than 298 pixels per inch
( 176 matches on 172 paaes)
GNR0-2019/00001 Page 2 of 2 Document Title and Electronic Filename 16.0 Technical Specifications GGNS UFSAR Chapter 16.pdf Chapter 17 Quality Assurance GGNS UFSAR Chapter 17.pdf Chapter 18.0 Responses To TMI Related Requirements GGNS UFSAR Chapter 18.pdf Appendix A GGNS UFSAR Appendix A.pdf Preflight Reason Status Failed Resolution of color and grayscale images is lower than 298 pixels per inch (6 matches on 4 paqes)
Passed Passed Passed