Summary Report of Open Generic Communications Projects (as of 11/30/2018)
ML18337A110
Person / Time
Issue date: 12/03/2018
From:
Office of Nuclear Reactor Regulation
To:
Lee E
References
Download: ML18337A110 (3)


Text

Summary Report of Open Generic Communication Projects (As Of 11/30/2018)

Division of Inspection and Regional Support (Information in this report is provided for general informational purposes only and is subject to change without notice.)

(For additional information contact Erika Lee at: erika.lee@nrc.gov)

CAC/EPIDS AGE CAC/EPIDS NUMBER TITLE AND

SUMMARY

(Mon)

OPENED L2014-CRS-0001 RIS RIS 2005-29 Rev 1 Anticipated Transients That Could Develop into More Serious Events This RIS update is intended to clarify the guidance contained in previously issued RIS 2005-29. RIS 2005-29 was initially issued to discuss concerns with demonstrating that certain events would not escalate into more serious events.

55 04/06/2014 L2017-CRS-0040 RIS Clarification of Visual Examination Requirements for Reactor Upper Heads to Detect Signs of Leakage This RIS is intended to clarify the requirements for bare metal visual examination.

19 04/05/2017 L2017-CRS-0046 IN Boiling-Water Reactor Dryout Indications Occurring During Normal Operation This IN is intended to inform addressees of recent operating experience related to numerous dryout indications which occurred over multiple cycles at the Leibstadt Nuclear Power Plant (NPP), a BWR/6 in Switzerland.

16 07/28/2017 L2017-CRS-0048 RIS Electronic Signature Use for Medical Licensee Internal Documents Required by NRC Regulation This RIS is intended to supply information to assist medical use licensees in complying with the current NRC requirements related to the use of electronic signatures in internal licensee electronic documents and to clarify what constitutes a signature on electronic documents that medical use licensees are required to sign and maintain.

15 08/24/2017 L2017-CRS-0004 RIS Reporting Requirements for Components Exported Under General License Provisions This RIS is intended to clarify the reporting requirements for nuclear facilities and equipment as required by 10 CFR 110.54 and the International Atomic Energy Agency for the Application of Safeguards in the United States.

13 10/03/2017 L2018-CRS-0003 RIS Clarification for Reporting Transactions to the National Source Tracking System Involving Encapsulated Bulk Material This RIS clarifies the National Source Tracking System (NSTS) Reporting requirements involving Category 1 or Category 2 sealed sources that a manufacturer identifies as bulk material.

10 01/25/2018 L2018-GEN-0000 IN Evaluations Supporting Changes to Plant Configuration This information notice is being issued to reiterate the need for comprehensive evaluations of configuration changes to structures, systems and components (SSC).

8 03/29/2018 L2018-GEN-0005 RIS Pre-Application Communication and Scheduling for Accident Tolerant Fuel Licensing Submittals The staff has generated a list of questions regarding anticipated agency work in the area of accident tolerant fuels (ATF). This RIS will provide the venue for collecting that information.

4 07/30/2018

Summary Report of Open Generic Communication Projects (As Of 11/30/2018)

Division of Inspection and Regional Support (Information in this report is provided for general informational purposes only and is subject to change without notice.)

(For additional information contact Erika Lee at: erika.lee@nrc.gov)

CAC/EPIDS AGE CAC/EPIDS NUMBER TITLE AND

SUMMARY

(Mon)

OPENED L2018-GEN-0007 IN Emergency Diesel Generator Excitation System Diode Failures EDG excitation system diode failures continue to occur. This information notice is intended to inform addressees that these conditions can lead to demand/run failures and can adversely affect the ability of EDGs to perform their safety functions.

2 09/10/2018 L2018-GEN-008 IN Independent Spent Fuel Storage Installations Inspection Findings This IN is intended to inform addressees of recent NRC inspection findings that have identified non-compliance with NUREGs and applicable codes and standards.

1 10/30/2018

Closed Generic Communication Projects Since Last Report Division of Inspection and Regional Support CAC/EPIDS NUMBER TITLE AND

SUMMARY

Date Opened Date Closed