ML18299A103

From kanterella
Jump to navigation Jump to search
Global Nuclear Fuel - Americas LLC - License Renewal Application Chapter Updates
ML18299A103
Person / Time
Site: 07001113
Issue date: 10/26/2018
From: Murray S
Global Nuclear Fuel
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML18299A102 List:
References
M180207
Download: ML18299A103 (4)


Text

Global Nuclear Fuel M180207 October 26, 2018 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attn: Document Control Desk Global Nuclear Fuel Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (91 0) 819-5950 Scott.murray@ge.com

Subject:

NRC License SNM-1 097-License Renewal Application Chapter Updates

Reference:

1) SNM-1 097, Docket 70-1113

Dear Sir or Madam:

The Global Nuclear Fuel-Americas L.L.C. (GNF-A) facility in Wilmington, North Carolina hereby provides administrative updates to four Chapters of our approved SNM license renewal application (Reference 1 ).

The administrative updates to Chapters 2, 7, 8, and 11 have been internally reviewed and documented as changes to license commitments that do not require prior NRC approval in accordance with SNM 1097 Section 1.3.1.2 and 10 CFR 70.72 A description and reason for the change in each Chapter is provided in Attachment 1 to this letter.

Attachments 2 through 5 provide updates to Chapter 2, "Organization and Administration", Chapter 7 "Fire Safety", Chapter 8 "Radiological Contingency and Emergency Plan", and Chapter 11,

"Management Measures". The revised sections are identified with a vertical line in the right hand margin on each revised page.

Please contact me on (91 0) 819-5950 if you have any questions or would like to discuss the request.

Sincerely, e

/YJ X.~l,. 1(/ /-

Scott P. Murra, Manager ~

Facility Licensing

(/

Attachments: 1) SNM-1097 Change Table Summary

2) SNM-1097 Chapter 2
3) SNM-1 097 Chapter 7
4) SNM-1097 Chapter 8
5) SNM -1 097 Chapter 11 cc: TO Naquin, USNRC NMSS T. Vukovinsky, USNRC Rll SPM 18-054

M180207 US NRC October 26, 2018 Page 1 of 3 SNM-1097 License Application Change Table 10/26/18 Section Description of Change Reason for Change Chapter 2 -ORGANIZATION AND ADMINISTRATION Figure 2.1 GNF-A Organization Chart Section 2.2.1.3 Integrated Safety Analysis and Configuration Management Functions Moved the Integrated Safety Analysis Function under EHS First sentence of first paragraph deleted are administratively part of the fuel production operations at GNF-A Separated Manager requirements for Integrated Safety Analysis and Configuration Management Administrative Update Administrative Update Clarification Chapter 7 - FIRE SAFETY Introduction Section 7.1 Fire Protection Program Responsibility Section 7.2 Fire Protection Program Deleted appropriate from the first sentence.

Revised last sentence by inserting codes and standards are most commonly cited and are Revised first two sentences describing the Fire Protection Program and Emergency Organization.

Added as needed to first sentence Revised second sentence for inspection, maintenance and testing of the fire protection system Deleted first sentence, third paragraph regarding formal, planned preventive maintenance program.

Changed cutting and welding to hot work in first sentence, fifth paragraph Revised first sentence, sixth paragraph for fire protection training.

Administrative Update Administrative Update Administrative Update Clarification Administrative Update to align with current roles and responsibilities Administrative Update to remove unnecessary detail Administrative Update to clarify current practice Administrative Update to remove unnecessary detail.

M180207 US NRC October 26, 2018 Page 2 of 3 Section 7.2 Fire Protection Program Continued Section 7.4.1 Existing Building Section 7.4.2 Dry Conversion Process Facility Section 7.5 Ventilation System Section 7.6 Process Fire Safety Section 7.7.1 Detection Devices Section 7.7.2 Alarms Section 7.8 Fire Suppression Equipment Section 7.9 Fire Protection Water System Section 7.10 Radiological Contingency and Emergency Plan (RC&EP)

Section 7.11 Emergency Response Team Deleted second and third sentences from seventh paragraph.

Revised eighth paragraph to indicate drills and exercises are described in the RC&EP Revised existing building fire safety descriptions Revised existing building fire safety descriptions Revised ventilation system air supply and fire damper function descriptions Revised description on how fire hazards are evaluated Revised description on how fire detection equipment is installed Revised description on fire system alarm capabilities Added standards to first sentence Changed control to restriction in third paragraph Revised list of available equipment Deleted Section Renumbered Section as 7-10 and revised description for Emergency Response Organization Redundant with sections 7.7.2 and 7.8 Administrative Update to clarify current practice Clarification Clarification Administrative Update to current practice and applicable guidance Administrative Update to current practice Administrative Update to current practice Administrative Update to current practice Clarification Clarification Administrative Update to current practice Redundant with references to RC&EP in sections 7.1, 7.10 and Chapter 8 Administrative Update to current practice Chapter 8 - RADIOLOGICAL CONTINGENCY AND EMERGENCY PLAN (RC&EP)

Deleted second paragraph with current date of RC&EP Administrative Update to remove unnecessary detail

M180207 US NRC October 26, 2018 Page 3 of 3 Chapter 11 - MANAGEMENT MEASURES Section 11.2.3 Document Control Section 11.4.2.1 General Employee Training Revised 1st bullet to read ISA documentation Deleted fire brigade from sixth bullet (fire protection)

Administrative Update Administrative Update to current practice