1 Vogtle PEmails From:

Hoellman, Jordan Sent:

Tuesday, September 25, 2018 9:34 AM To:

Vogtle PEmails

Subject:

Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Attachments:

Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf Attached is the information regarding Alternative Requirements to ASME Section III Pressure Testing that will be presented during the 9/27/18 Technical Exchange Meeting during the normally scheduled public call.

The presentation does not contain SUNSI.

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

371 Mail Envelope Properties (SN6PR0901MB23669EDB8569ACC6E40C0FE8D5160)

Subject:

Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Sent Date:

9/25/2018 9:33:41 AM Received Date:

9/25/2018 9:33:46 AM From:

Hoellman, Jordan Created By:

Jordan.Hoellman2@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 280 9/25/2018 9:33:46 AM Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf 668972 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LAR-XXX and Alt-XX Alternative to ASME Section III Pressure Testing Requirements Post N-5 Technical Exchange Meeting 9/27/18

Agenda

  • Background
  • Problem Statement
  • Regulatory Considerations
  • Issue Resolution
  • Documentation
  • Proposed LAR and Alternative Schedule 2

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Background

  • Under 10 CFR 50.55a facilities licensed under Part 52 are subject to Section III of the ASME Code prior to the 52.103(g) finding. Following the 52.103 (g) finding, the licensee is subject to ASME Section XI.
  • ASME Section III requires a hydrostatic test following performance of a repair and/or replacement activity associated with a Class 1, 2, or 3 pressure boundary.
  • The requirement to conduct multiple hydros at the elevated pressures required by ASME Section III following repair/replacement activities prior to the Section 52.103(g) finding creates a hardship associated with establishing test boundaries and elevated pressure.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Problem Statement 61&LVVHHNLQJWRXVHQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHWRSHUIRUP$60(6HFWLRQ

,,,K\\GURVWDWLFSUHVVXUHWHVWLQJIRUUHSDLURUUHSODFHPHQWDFWLYLWLHVRI$60(6HFWLRQ

,,,&ODVVDQGFRPSRQHQWVGXULQJWKHWLPHEHWZHHQ

  • FRPSOHWLRQRIWKH$60(6HFWLRQ,,,1GDWDUHSRUWIRULQVWDOODWLRQRIWKH

FRPSRQHQW V LQWKHSODQWDQG

  • WKH J ILQGLQJ

,QOLHXRISHUIRUPLQJWKH6HFWLRQ,,,K\\GURVWDWLFSUHVVXUHWHVWRIWKHUHSDLUHGRU

UHSODFHGFRPSRQHQWDOHDNFKHFNDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHIRUWKH

FRPSRQHQWZLOOEHSHUIRUPHG7KLVLVFRQVLVWHQWZLWK6HFWLRQ;,UHTXLUHPHQWV

Request is similar to TVA Watts Bar



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Regulatory Considerations

  • Both paths would present a similar hardship argument

- 10 CFR 50.55a(z) allows NRC staff to authorize the use of alternative requirements to ASME Section III requirements.

Consideration was given to NRC recommendations presented in 2009 during interface with utilities [ADAM Accession # ML092310072, slide 8].

Application of ASME Section III up to the 52.103(g) finding presents a hardship due to the potential for multiples cycles of establishing test boundaries, establishing elevated pressures, and putting additional stress cycles on system beyond design pressure.



Scope 7KHDOWHUQDWLYHZRXOGDSSO\\WRSUHVVXUHWHVWLQJIRUDOO$60(6HFWLRQ,,,FRPSRQHQWV

H[FHSWUHSDLURUUHSODFHPHQWRIODUJH$60(6HFWLRQ,,,&ODVVFRPSRQHQWVLQFOXGLQJ

6WHDP*HQHUDWRUV 5&3V 3UHVVXUL]HU 5HDFWRU9HVVHO

$FFXPXODWRUV

&RUH0DNH8S7DQNV

/RRSSLSLQJDVGHILQHGLQ8)6$57LHU7DEOH

35+5+HDW([FKDQJHUV All other ASME Section III requirements (e.g. NDE, acceptable flaw sizes) will be maintained.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Example 1:

$IWHUFRPSOHWLRQRIWKH5&6V\\VWHPFROGK\\GURSUHVVXUHWHVWDQG1

LQVWDOODWLRQGDWDUHSRUWDGUDLQYDOYHFRQQHFWHGWRWKH5&6LV

GDPDJHGDQGKDVWREHUHSODFHG7KLVYDOYHFDQQRWEHLVRODWHGIURP

WKH5&6DQGSHUIRUPLQJDQRWKHUFROGK\\GURSUHVVXUHWHVWRIWKHQHZ

ZHOGWRFRQQHFWWKLVYDOYHWRWKH5&6ZLOOH[SRVHWKH5&6V\\VWHP

FRPSRQHQWVWRDQDGGLWLRQDOSUHVVXUHWHVWVWUHVVF\\FOH$OHDNFKHFN

RIWKHQHZFRQQHFWLQJZHOGDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHZLOO

DGHTXDWHO\\GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\\RI

WKHQHZFRQQHFWLQJZHOGZLWKRXWH[SRVLQJWKH5&6V\\VWHP

FRPSRQHQWVWRDQ$60(6HFWLRQ,,,UHTXLUHGSUHVVXUHWHVWVWUHVV

F\\FOH

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Example 2:

$IWHUFRPSOHWLRQRIWKHSDVVLYHFRQWDLQPHQWFRROLQJ 3&& V\\VWHP

FROGK\\GURSUHVVXUHWHVWDQG1LQVWDOODWLRQGDWDUHSRUWDYDOYHLV

UHTXLUHGWREHUHSODFHGGXHWRDPDVVLYHJRXJHLQWKHYDOYHERG\\

FUHDWHGGXULQJFRQVWUXFWLRQUHODWHGDFWLYLWLHV7KLVYDOYHLVFRQWDLQHG

LQ7LHU7DEOH7KHK\\GURVWDWLFWHVWZRXOGUHTXLUHGHYHORSLQJ

K\\GURVWDWLFWHVWSUHVVXUHRYHUWKHYDOYHWKH3&&:67DQGXSWR

VHYHUDORWKHULVRODWLRQYDOYHV$OHDNFKHFNRIWKHQHZFRQQHFWLQJ

ZHOGDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHZLOODGHTXDWHO\\

GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\\RIWKHQHZ

FRQQHFWLQJZHOGV

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Issue Resolution (Licensing Path for Changes):

ASME Section III Code Alternative Proposal:

- Request to perform pressure test at nominal system operating pressure for components repaired and/or replaced following the ASME Section III N-5 installation data report consistent with Section XI requirements.

License Amendment and Exemption:

- Will expand on ASME Section III alternative request basis and address impact of alternative on ITAAC

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Changes to Licensing Basis (Markups for Tier 1 Exemption Request):

RCS

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

7DEOH

,QVSHFWLRQV7HVWV$QDO\\VHVDQG$FFHSWDQFH&ULWHULD



Changes to Licensing Basis (Markups for Tier 1 Exemption Request):

Non-RCS

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Changes to Licensing Basis:

Non-RCS (continued)

Change described would apply to all ASME ITAAC Design Commitment # 4.b for all non-RCS ITAAC.

Tables 2.2.1-3, 2.2.2-3, 2.2.3-4, 2.2.4-4, 2.2.5-5, 2.3.2-4, 2.3.6-4, 2.3.7-4, 2.3.10-4, and 2.7.1-4

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Documentation

  • Pressure testing required following the completion of the N-5 installation data report will be documented on a supplement to the N-5 installation data report

- Requires ANI review

  • An ITAAC Post Closure Notification (PCN) will be issued for ASME pressure tests completed following the completion of the N-5 installation data report

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



3URSRVHG/$5DQG$OWHUQDWLYH6FKHGXOH

- Presubmittal Meeting - October 25, 2018

- Submittal - November 20, 2018

- Requested Approval Date - May 20, 2019

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1