ML18156A384
| ML18156A384 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/04/2018 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Diya F Ameren Missouri |
| Farnholtz T | |
| References | |
| IR 2018003 | |
| Download: ML18156A384 (5) | |
See also: IR 05000483/2018003
Text
June 4, 2018
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Ameren Missouri
Callaway Plant
P.O. Box 620
Fulton, MO 65251
SUBJECT: CALLAWAY PLANT NOTIFICATION OF EVALUATIONS OF CHANGES,
TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
INSPECTION (05000483/2018003) AND REQUEST FOR INFORMATION
Dear Mr. Diya:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct the baseline inspection of changes, tests, experiments, and permanent
plant modifications at the Callaway Plant, from August 5, 2018, to August 10, 2018. The
inspection will consist of three reactor inspectors from the NRCs Region IV office for one
onsite week. The inspection will be conducted in accordance with NRC Inspection
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by July 5, 2018. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival. It
is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff. If there are any
questions about this inspection or the material requested, please contact the lead inspector,
James Drake, by telephone at 817-200-1558 or by e-mail at James.Drake@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
F. Diya
2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a
copy of this letter and its enclosure will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-483
License Nos. NPF-30
Enclosure:
Request for Information
cc: Electronic Distribution
Enclosure
Request for Information
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Inspection
Callaway Plant
Inspection Report: 05000483/2018003
Inspection Dates:
August 5, 2018, to August 10, 2018
Inspection Procedure:
IP 71111.17T, Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications
Lead Inspector:
James Drake, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be provided to the Region IV office in hard copy or electronic
format or via CERTREC (preferred) by July 5, 2017, to the attention of Jim Drake. We request
that you categorize the documents in your response with the numbered list below. If only hard
copies of the requested documents are available or if the electronic format is too large, please
inform the lead inspector and provide the documents on the first day of the on-site inspection.
Also, the inspectors will select specific items from the information requested below and request
from your staff additional documents needed during the on-site inspection week. We ask that
the specific items requested be available and ready for review on the first day of inspection. If
you have any questions regarding this information request, please contact the lead inspector as
soon as possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
implemented changes, tests, and experiments performed since the last triennial
modification inspection that did not result in an evaluation
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
tests, and experiments performed since the last triennial modification inspection that did
not result in an application for a license amendment
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial modification inspection
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates
7. Procedure(s) for implementing permanent plant modifications
8. A list with descriptions of all permanent plant modifications fully implemented since the
last triennial modification inspection
2
9. A list with descriptions of all corrective action documents related to permanent plant
modifications fully implemented since the last triennial modification inspection
10. Current revisions of the Technical Specifications and bases, and the Updated Final
Safety Analysis Report
11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and
permanent plant modification programs
12. A copy of the most recent submittal of the report containing a brief description of any
changes, tests, and experiments, including a summary of the evaluation of each,
required by 10 CFR 50.59(d)(2)
13. A list of systems and system designators, and a set of one-line (i.e., simplified) system
diagrams
Note: Descriptions should be brief, but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and
modifications.
Note: For this inspection, permanent plant modifications include permanent plant changes,
design changes, set point changes, procedure changes, equivalency evaluations,
suitability analyses, calculations, and commercial grade dedications.
Lead Inspector Contact Information:
Senior Reactor Inspector
817-200-1558
James.Drake@nrc.gov
Mailing Address:
U.S. NRC, Region IV
ATTN: James Drake
1600 East Lamar Blvd.
Arlington, TX 76011-4125
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: JFD Yes No
Publicly Available Sensitive
OFFICE
SRI:DRS
C:DRP/B
C:EB1
NAME
JDrake
NTaylor
TFarnholtz
SIGNATURE
/RA/
/RA/
/RA/
DATE
05/31/2018
06/04/2018