Response to Regulatory Issue Summary 2018-02
ML18135A067
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/14/2018
From: Schenk T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBF1-18-0101, RBG- 47866, RIS 2018-002
Download: ML18135A067 (9)


Text

,.

"=' Entergy.

RBG-47866 May 14, 2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

RBF1-18-0101 Response to Regulatory Issue Summary 2018-02 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47

Dear Sir or Madam:

Entergy Operations. Inc.

River Bend Stallon 5485 U.S Highway 61 N

t. Franc,sv,lte LA 70775 Tel ?2538t*4177 Timothy Schenk Manitger Regulatory Assurance On March 26, 2018 the NRC issued Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations, requesting information related to future Operator Licensing examinations dates. River Bend Station, Entergy Operations, Inc. herein submits the requested information on the attached NRC Form 536.

This document contains no commitments. If you have any questions, please contact Mr. Sid Durbin at 225-378-3313.

TAS/djp Attachment cc:

U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, Texas 76011-4511 NRC Sr. Resident Inspector River Bend Station

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150"()131 EXPIRES: 11/30/2020 (11.2017) a"' Itrotl<.

~~ triO.

OPERATOR LICENSING Estimaled burden per response 10 co~y with Ills volll1lary information coIlecbon request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This f

III S Informabon collection is used 10 plan budgels and rOSOlIces for operalor oxamnabons SIInd

~

EXAMINATION DATA commenls reg arcing burden esbmale to 1M Information Services Brooch (T*2 F43), U.S. Nuclear c

Regulalory Commission, Washington, DC20555*0001, or by e-mail 10 Infocoilects.Resource@IYcgov,

~... ~,.

~

~

and 10 the Desk Officer, Of~ce of Information and Regulatory Ailairs. NEO&10202. (315Q.0131). OfIice

+.,

'too of Management iIld Budge~ Washington, DC 20503 If a means used to Impose an informabon collection does nol c1splay a currenl!y valid OMB con~oI ",.mber, the NRC may nol conduct or sponsor.

and a person IS not requrred to respond to, !he information collection.

FACILITY NRC REGION IRiver Bend Station II IV I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 19 Cy 20 Cy 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED I

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 19 Cy 20 CY 2 1 CY 22 NUMBER OF REACTOR 7

8 6

0 OPERATORS NUMBER OF SENIOR REACTOR 12 4

8 0

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR I

I 1

0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 1111 1120 19 09128/2020 0912712021 ALTERNATE DATE 12/02/20 19 1110912020 10/25/2021 NRC FORM 536 (11-2017)

NRC FORM 536 (11 -2017)

U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO_ 3150~131 EXPIRES: 11/30/2020

~c;J"R R(OCll..,~

o~

~

~iI J

~

.... ~

+1)

.,..0 FACILITY IRiver Bend Station OPERATOR LICENSING EXAMINATION DATA Estimaled burden per response 10 co~1y with lhis vol..,lary infOfmation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This Informabon coliecbon IS used 10 plan budgels and resources for operalor examnations Send c","menls reg arcing burden estimale 10 the InfOfmation Services Bra:1ch (T-2 F43), U.S. Nuclear Regulalory CommisSion, Washington, DC20555-0001, Of by e-mail 10 Infocoilecis.Resource@nrcgov, and 10 the Desk Officer, Office of InfOfmation and RegjalOfY Alfairs, NEOB-l0202, (3150-0131), Office of Ma:1agemenl and Budge~ Washington, DC 20503.

If a means used 10 i~ose an information collection does nol cisplay a currentty valid OMB coo~oI number, lhe NRC may not conducl or sponsor, and a person IS not required 10 respond 10, the information colleclion.

NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS Cy 20 o

Cy 2 1 o

B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE AL TERNATE DATE NRC FORM 536 (11 -2017)

CY 19 CY 20 8

6 4

8 o

o 09128/2020 0912712021 11109/2020 10/25/202 1 CY 22 CY 23 o

o o

CY 21 CY 22 o

o o

3 o

3 o

o 0112312023 02120/2023

0 0

NUCLEAR QUALITY RELATED EN-Ll-106 REV. 18

~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10F2 NRC Correspondence ATTACHMENT 9.4 Letter #: RBF1-18-0101

Subject:

Response to Regulatory Issue Summary 2018-02

{Typical}

NRC SUBMITTAL REVIEW Response Due: 5/14/2018 Date Issued for Review: 5/9/2018 Correspondence Preparer I Phone #: Dennis Pereira 1 X4621 S ectlon L etter C oncurrence an dA

~greement to P rf e orm A.

ctlons POSITION I NAME Action Signature (concurrence, certification, etc.)

(sign, interoffice memo, e-mail, or telecom)

Tom Laporte Comment / Concur See Attached Email Tim Venable Comment / Concur See Attached Email COMMENTS S ectlon I C orrespon d ence S creenmg Does this letter contain commitments? If "yes," identify the commitments with due Yes D

dates in the submittal and in Section III and initiate a PCRS LR-LAR to track No rzI implementation and/or completion of the commitment. When fleet letters contain commitments, a PCRS LR-LAR should be initiated with a CA assigned to each applicable site to enter the commitments into the site's commitment management system.

Does this letter contain any information or analyses of new safety issues performed at Yes D

NRC request or to satisfy a regulatory requirement? If "yes," reflect requirement to No rzI update the UFSAR in Section III.

Does this letter require any document changes (e.g., procedures, DBDs, UFSAR, TS Yes D

Bases, etc.), if approved? If "yes," indicate in Section III an action for the responsible department to determine the affected documents. (The Correspondence Preparer No rzI may indicate the specific documents requiring revision, if known or may initiate an action for review.)

EN-U-106 REV 18

0 0

NUCLEAR QUALITY RELATED EN-U-106 REV. 18

~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 20F2 NRC Correspondence ATTACHMENT 9.4 NRC SUBMITTAL REVIEW Does this letter contain information certified accurate? If "yes," identify the information Yes 0

and document certification in an attachment. (Attachment 9.5 must be used.)

No

[gJ Section III Actions and Commitments Required Actions Note: Actions needed upon approval should be captured in the Due Date Responsible Dept.

appropriate action tracking system N/A N/A N/A N/A N/A Commitments Note 1: If the letter contains commitments, a PCRS LR-LAR should be initiated to track implementation and/or completion.

Due Date Responsible Dept.

Note 2: When fleet letters contain commitments, a PCRS LR-LAR should be initiated with a CA assigned to each applicable site to enter the commitments into the site's commitment management system.

N/A N/A N/A N/A N/A S ectlon IV F

ID Ina ocument s* 19no fff S b.

or u mltta Correspondence Preparer Dennis Pereira Final Submittal Review (optional)

N/A Responsible Department Head Timothy Schenk EN-U-106 REV 18

Pereira, Dennis From:

Sent:

To:

Cc:

Subject:

Follow Up Flag:

Flag Status:

Titus, LAPORTE, THOMAS H Thursday, April 26, 2018 4:13 PM FOLDS, TITUS; Pereira, Dennis DURBIN, SID; SCHENK, TIMOTHY A RIS Follow up Flagged I tried to get a hold of Dennis but he is out for the next week, I spoke with Tim Schenk and he told be to send these to you and that you would get these to the NRC Region IV Mahdi Hayes These are the forms showing when we would like to have our licensed operator exams and how man of exam type of examinee we are expecting Please contact me if you have any questions.

Thanks Tom Thomas LaPorte Supervi or, Operations Training Initial Training Programs River Bend Station Internal 8-558-3366 External 225-378-3366 1

Pereira, Dennis From:

Sent:

To:

Subject:

Attachments:

Here are the revised forms Thomas LaPorte LAPORTE, THOMAS H Wednesday, May 09, 2018 10:39 AM Pereira, Dennis NRC forms for transmit nrc536 2019-2022.pdf; nrc536 2020-2023.pdf Supervisor, Operations Training Initial Training Programs River Bend Station Internal 8-558-3366 External 225-378-3366 1

Pereira, Dennis From:

Sent:

To:

Cc:

VENABLE, TIMOTHY J Thursday, May 10, 2018 8:41 AM Pereira, Dennis SCHENK, TIMOTHY A

Subject:

Re: Operator Licensing Exam Data NRC forms for transmit Follow Up Flag:

Flag Status:

I'm good then.

Thank you guys.

Sent from my iPhone Follow up Flagged On May 10, 2018, at 07:11, Pereira, Dennis <dpereir@entergy.com> wrote:

Tim, Its an annual estimate. Attached is the RIS for 2018 (with some highlights) as well as the last two responses (to RIS 2016 & 2017) RBS sent to the NRC. You'll see as you compare that the estimates change. The response to RIS 2018 is just our latest estimate or projection moving forward.

Dennis Pereira Licensing Specialist River Bend Station Office: 225-381-4621 Email : dpereir@entergy.com

<imageOO1.png>

From: VENABLE, TIMOTHY J Sent: Wednesday, May 09, 20189:03 PM To: Pereira, Dennis Cc: SCHENK, TIMOTHY A

Subject:

Re: Operator Licensing Exam Data NRC forms for transmit How accurate does the future data have to be?

Sent from my iPhone On May 9, 2018, at 12:57, Pereira, Dennis <dpereir@entergy.com> wrote:

Tim, With your concurrence, I will submit the attached in response to the annual RIS (2018-02, Preparation and Scheduling of Operator Licensing Examinations).

Dennis Pereira 1

Licensing Specialist River Bend Station Office: 225-381-4621 Email : dpereir@entergy.com

<imageOOl.png>

From: LAPORTE, THOMAS H Sent: Wednesday, May 09, 2018 10:39 AM To: Pereira, Dennis

Subject:

NRC forms for transmit Here are the revised forms Thoma LaPorte Supervi or, Operations Training Initial Training Programs River Bend Station Internal 8-558-3366 External 225-378-3366

<nrc536 20 I 9-2022.pdf>

<nrc5362020-2023.pdf>

<RIS 2018-02 Voluntary License Exam Schedule.pdf>

<Re ponse to RIS 2016-09.pdf>

<Re ponse to RIS 2017-03.pdf>

2