ML18061A150

From kanterella
Jump to navigation Jump to search
Information Request for the Cyber-Security Full Implementation of Inspection, Notification to Perform Inspection 05000331/2018414 (DRS-G.Hausman)
ML18061A150
Person / Time
Site: Duane Arnold  NextEra Energy icon.png
Issue date: 03/02/2018
From: Hausman G
Engineering Branch 3
To: Dean Curtland
NextEra Energy Duane Arnold
References
IR 2018414
Download: ML18061A150 (8)


See also: IR 05000331/2018414

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

March 2, 2018

Mr. Dean Curtland

Director of Site Operations

NextEra Energy Duane Arnold, LLC

3277 DAEC Road

Palo, IA 52324-9785

SUBJECT: DUANE ARNOLD ENERGY CENTERINFORMATION REQUEST FOR THE

CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION

TO PERFORM INSPECTION 05000331/2018414

Dear Mr. Curtland:

On July 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in

accordance with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at

your Duane Arnold Energy Center. The inspection will be performed to evaluate and verify your

ability to meet full implementation requirements of the NRCs Cyber-Security Rule, Title 10 of

the Code of Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer

and Communication Systems and Networks. The onsite portion of the inspection will take

place during the weeks of July 9, 2018, and July 23, 2018.

Experience has shown that these inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing

the focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection

Procedure. This information should be made available via compact disc and delivered to

the regional office no later than April 16, 2018. The inspection team will review this

information and, by May 14, 2018, will request the specific items that should be provided

for review.

The second group of additional requested documents will assist the inspection team in

the evaluation of the critical systems and critical digital assets, defensive architecture,

and the areas of your plants Cyber-Security Program selected for the Cyber-Security

Inspection. This information will be requested for review in the regional office prior to the

inspection by June 11, 2018.

D. Curtland

-2-

The third group of requested documents consists of those items that the inspection team

will review, or need access to, during the inspection. Please have this information

available by the first day of the onsite inspection, July 9, 2018.

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Ms. Laura B. Swenzinski of your organization. If there

are any questions about the inspection or the material requested, please contact the lead

inspector at 630-829-9743 or via e-mail at George.Hausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

George M. Hausman, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-331;72-032

License No. DPR-49

Enclosure:

Document Request for Cyber-Security

Inspection

cc: Distribution via LISTSERV

D. Curtland

-3-

Letter to Dean Curtland from George M. Hausman dated March 2, 2018

SUBJECT: DUANE ARNOLD ENERGY CENTERINFORMATION REQUEST FOR THE

CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION

TO PERFORM INSPECTION 05000331/2018414

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMDuaneArnold Resource

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18061A150

OFFICE

RIII

RIII

RIII

RIII

NAME

GHausman:cl

DATE

03/02/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

Enclosure

Inspection Report: 05000331/2018414

Inspection Dates:

Weeks of July 9, 2018, and July 23, 2018

Inspection Procedure:

IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017

Reference:

Guidance Document for Development of the Request for

Information and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Issue Date October 26, 2017

(ML17156A215)

NRC Inspectors:

George M. Hausman, Lead

Jasmine A. Gilliam

630-829-9743

630-829-9831

George.Hausman@nrc.gov

Jasmine.Gilliam@nrc.gov

Kim M. Lawson-Jenkins

301-287-3656

Kim.Lawson-Jenkins@nrc.gov

NRC Contractors:

Alan B. Konkal

Jeffrey Man

561-989-0210

301-310-4275

Alan.Konkal@nrc.gov

Jeffrey.Man@nrc.gov

Observers:

Rodney J. Fanner

John A. Walley

404-997-4638

703-999-9098

Rodney.Fanner@nrc.gov

John.Walley@nrc.gov

Robert C. Daley

630-829-9749

Robert.Daley@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first Request for Information (RFI)) concentrates

on providing the inspection team with the general information necessary to select

appropriate components and Cyber-Security Program (CSP) elements to develop a

site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management security control

portions of the CSP to be chosen as the sample set required to be inspected by the

Cyber-Security Inspection Procedure. The first RFIs requested information is specified

below in Table RFI #1. The Table RFI #1 information is requested to be provided to the

regional office by April 16, 2018, or sooner, to facilitate the selection of the specific items

that will be reviewed during the onsite inspection weeks.

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

2

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by May 14, 2018, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the

Cyber-Security Inspection. All requests for this information shall follow the Table RFI #1

and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the

lead inspector by April 16, 2018. Please provide five copies of each CD submitted

(i.e., one for each inspector/contractor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3, Paragraph Number/Title:

Items

1

List All Identified CSs and CDAs

All

2

List CDA Facility and Site EthernetTransmission Control

Protocol/Internet Protocol Based Local Area Networks (LANs) and

Identify Those LANs That Have Non-CDAs On Them

All

3

List CDA Facility and Site Non-Ethernet Transmission Control

Protocol/Internet Protocol Based LANs Including Those Industrial

Networks and Identify LANs That Have Non-CDAs On Them

All

4

Network Topology Diagrams (Be Sure To Include All Network

Intrusion Detection Systems and Security Information and Event

Managements (SIEM) for Emergency Preparedness Networks and

Security Level 3 and 4 Networks)

All

8

List All Network Security Boundary Devices for EP Networks and

All Network Security Boundary Devices for Levels 3 and 4

All

9

List CDA Wireless Industrial Networks

All

11

Network Intrusion Detection System Documentation for CSs That

Have CDAs Associated with Them

11.a.1)

11.a.2)

12

SIEM Documentation for CSs That Have CDAs Associated with

Them

12.a.1)

12.a.2)

14

List EP and Security Onsite and Offsite Digital Communication

Systems

All

25

Cyber-Security Assessment and Cyber-Security Incident

Response Teams

All

28

Copy of Current Cyber Security Plan and Copy of 50.54(p)

Analysis To Support Changes To That Plan

All

29

Copy Of Any Licensee-Identified Violations and Associated

Corrective Action Program Documentation To Resolve Issue(s)

All

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

3

In addition to the above information please provide the following:

(1.)

Electronic copy of the Updated Finals Safety Analysis Report and

technical specifications.

(2.)

Name(s) and phone numbers for the regulatory and technical contacts.

(3.)

Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by May 14, 2018, for the

second RFI (i.e., Table RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and submit the list of specific

systems and equipment to your staff by May 14, 2018, for the second RFI

(i.e., Table RFI #2). The second RFI will request additional information required to

evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP

selected for the Cyber-Security Inspection. The additional information requested for the

specific systems and equipment is identified in Table RFI #2. All requests for this

information shall follow the Table RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

June 11, 2018. Please provide five copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table RFI #2

Reference Section 3, Paragraph Number/Title:

Items

5

Plant Computer System Block Diagram (If Plant Computer

System Is Selected for Inspection)

All

6

Plant Security System Block Diagram (If Security Computer

System Is Selected for Inspection)

All

7

Systems That Are Distributed Block Diagrams (For Systems

Selected for Inspection)

All

10

Host-Based Intrusion Detection System Documentation (For

CDAs for Systems Selected for Inspection)

10.a.1)

10.a.2)

13

List All Maintenance and Test Equipment Used On CDAs for

Systems Selected for Inspection

All

15

Configuration Management

All

16

Supply Chain Management

16.b.

16.c.1),

16.c.5),

16.c.6)

17

Portable Media and Mobile Device Control

All

18

Software Management

All

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

4

Table RFI #2

Reference Section 3, Paragraph Number/Title:

Items

20

Vendor Access and Monitoring

All

21

Work Control

All

22

Device Access and Key Control

All

23

Password/Authenticator Policy

All

24

User Account/Credential Policy

All

26

Corrective Actions Since Last U.S. Nuclear Regulatory

Commission Inspection

All

27

Cyber Security Assessments for Selected Systems

All

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide

the following RFI (i.e., Table 1st Week Onsite) on CD by July 9, 2018, the first day of the

inspection. All requests for this information shall follow the Table 1st Week Onsite and

the guidance document referenced above.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).

The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table 1st Week Onsite

Reference Section 3, Paragraph Number/Title:

Items

10

Host-Based Intrusion Detection System Documentation for CDAs

for Systems Selected for Inspection

10.a.3) thru

10.a.12)

11

Network Intrusion Detection System Documentation for CSs That

Have CDAs Associated with Them

11.a.3) thru

11.a.15)

12

SIEM Documentation for CSs That Have CDAs Associated with

Them

12.a.3) thru

12.a.14)

16

Supply Chain Management

16.c.2)

16.c.3)

16.c.4)

19

Cyber-Security Event Notifications

All

29

Update to Licensee Identified Violations and Corrective Action

Program Actions Taken Since the Initial Request Was Made

All

In addition to the above information please provide the following:

(1.)

Copies of the following documents do not need to be solely available to

the inspection team as long as the inspectors have easy and unrestrained

access to them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance Plan;

e. Latest Individual Plant Examination/Probabilistic Risk Assessment

Report; and

f. Vendor Manuals.

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

5

(2.)

Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status

of corrective actions) generated as a result of the most recent

Cyber-Security Quality Assurance audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection

(1.)

Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2.)

Copies of the list of questions submitted by the inspection team members

and the status/resolution of the information requested (provided daily

during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.