February 28, 2018 Mr. Anton Andrashov, Director Research and Production Company RadICS 29 Geroyiv Stalingradu Street 25009 Kirovohrad, Ukraine
SUBJECT:
REGULATORY AUDIT PLAN FOR APRIL 2-5, 2018, RADICS TOPICAL REPORT (CAC NO. MF8411; EPID: L-2016-TOP-0010)
Dear Mr. Andrashov:
By letter dated September 20, 2016 (Agencywide Documents Access and Management System Accession (ADAMS) No. ML16274A346), Research and Production Corporation Radiy (RPC Radiy) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Licensing Topical Report (LTR) RadlCS Topical Report." The LTR is supported by documentation that includes plans, requirements, design specifications, programming and hardware testing, independent verification and validation, and equipment qualification testing.
The U. S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the LTR for use in safety system equipment at nuclear power plants. As part of its review, the NRC staff will be performing a regulatory audit of RadICS. The dates for this audit will be April 2-5, 2018.
The audit will determine the degree that the processes and outputs used have resulted in satisfying regulatory requirements for safety system applications at nuclear power plants.
This audit will provide information necessary to complete the NRC staffs evaluation of the LTR. Enclosed is a copy of the plan the NRC staff will follow on the audit.
A. Andrashov If you any questions or require any additional information, please feel free to contact me at 301-415-7297 or via electronic mail at Joseph.Holonich@nrc.gov.
Sincerely,
/RA/
Joseph J. Holonich, Sr. Project Manager Licensing Processes Branch Division of Licensing Processes Office of Nuclear Reactor Regulation
Enclosure:
Audit Plan Docket No. 99902032 cc: Mr. Mark Burzynski, Licensing Manager Research and Production Company RadICS 2036 Marina Cove Dr.
Hixson, TN 37343
ML18051A700; *concurred via e-mail NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DE/EICB* NRO/DEI/ICE* NRR/DLP/PLPB NAME JHolonich DHarrison* MWaters IJung DMorey DATE 2/28/2018 2/27/2018 2/23/2018 2/28/2018 2/28/2018 OFFICE NRR/DLP/PLPB NAME JHolonich DATE 2/28/2018 U. S. Nuclear Regulatory Commission Staff RadlCS I&C Platform Regulatory Audit Plan Toronto, Canada
Background
The Nuclear Regulatory Commission (NRC) staff is currently performing a review of the RadlCS licensing topical report (LTR), 2016-RPC003-TR-001, RadICS Topical Report, Revision 0 (Agencywide Document Access and Management System (ADAMS) Accession No. ML16274A349). RadlCS is seeking generic approval of the RadlCS platform for use in safety systems in nuclear power plants. This regulatory audit is intended to assist the NRC staff in confirming information submitted as part of the LTR.
Regulatory Audit Bases As part of its evaluation, the NRC staff is reviewing RadlCS design and development processes used for the RadlCS platform. To support this review, the NRC staff will visit the Kinectrics qualifications testing facility located in Toronto, Canada, where current RadlCS instrumentation and control (I&C) platform testing is being performed. The primary purpose of this audit is to review evidence that supports the NRC staff determination as to whether the RadICS LTR addresses:
- Commercial Grade Dedication: Title 10 of the Code of Federal Regulations (10 CFR)
Part 21, Reporting of Defects and Noncompliance, and the commercial grade dedication processes and methods as accepted for use by the NRC staff in Electric Power Research Institute TR-106439, Guideline on Evaluation and Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Applications (ADAMS Accession Nos. ML103360462 and ML12205A284).
- Digital Safety System Software Quality and Processes: 10 CFR Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, as discussed in branch technical position (BTP) 7-14 (ADAMS Accession No. ML070670183) and applicable regulatory guides (RGs).
- Secure Development Environment: 10 CFR Part 50 as elaborated in RG 1.152, Revision 3, Criteria for Use of Computers in Safety Systems of Nuclear Power Plants (ADAMS Accession No. ML102870022).
A secondary purpose of the audit will be to gain a better understanding of the RadlCS development life-cycle processes to support the safety evaluation of the RadlCS platform.
Also, the audit will assess the capabilities of the RadlCS platform to determine if a RadlCS based I&C safety system will be capable of meeting acceptance criteria as described in Chapter 7 of the NRC Standard Review Plan, NUREG-0800 (ADAMS Accession No. ML052340534). The NRC staff will use the results of this audit to support its evaluation conclusions.
Enclosure
Regulatory Audit Scope This audit will be conducted in accordance with NRC Office Instruction LIC-111, Regulatory Audits (ADAMS Accession No. ML082900195). The NRC staff will review supporting procedures and records related to the RadlCS platform development processes. The NRC staff will also evaluate the effectiveness of software development activities. It will also confirm that processes described in the RadlCS LTR are being implemented correctly to achieve a high-quality system that can be used to perform safety-related functions in a nuclear facility and whether the results of these actions substantiate that processes described in the LTR are being followed.
Audit Requirements
- Software Verification and Validation (V&V) - Verify the RadlCS platform software V&V plan meets the criteria of IEEE Std. 1012, IEEE Standard for Software Verification and Validation, and the V&V program is implemented in a manner which reliably verifies and validates the design outputs at each stage of the RadlCS software development process.
- Configuration Management - Verify the RadlCS configuration management processes include appropriate hardware and software under configuration management and the configuration management system is effectively controlling the items being managed by these processes.
- Software Quality Assurance (SQA) - Verify the SQA plan is effective in controlling the RadlCS software and field, programmable gate array (FPGA) logic-development process to assure regulatory quality of the RadlCS platform software and FPGA logic.
- Software Safety - Verify that software safety plans and procedures used for safety-analysis activities are adequate to determine that RadlCS software and FPGA developed logic is safe to be used for safety-related nuclear power plant operations.
- Secure Development Environment - Evaluate the RadlCS platform development environment. The results of this audit activity will be used to determine conformance to the secure development environment requirements of RG 1.152, Revision 3.
Information Necessary for the Regulatory Audit In addition to the documents listed in Appendix A of this audit plan and other listed regulatory review items, RadlCS should have documentation and information prepared at the start of the audit that demonstrate utilization and implementation of the regulatory acceptable processes and procedures for the following regulatory audit topics:
- Requirements Tracing o Provide documentation, from the requirements phase through the testing phase (i.e., records related to requirements, design, coding, testing, and verification),
to gain an overview of the RadlCS platform hardware and software development processes.
- Commercial Grade Dedication o Provide a dedication report for a dedicated component of the RadlCS Platform.
NRC staff would like to review the records from the internal audit. If practical,
the NRC staff would also like to interview RadlCS personnel involved in the handling and acceptance of components that have undergone commercial grade dedication.
o Provide the procedures followed for processing of non-conformance reports.
Those procedures, as well as recent examples of records related to non-conformance reports, would be valuable for the staff to review during the audit.
- Digital Safety System Software and FPGA Logic Development o Provide documentation to confirm the V&V processes are implemented, with a focus on record keeping, documentation, and management activities (including identification of documents associated with safety-related components).
o Provide documentation to confirm configuration management processes are implemented, with a focus on record keeping, documentation, and management activities (including identification of documents associated with safety related components).
- Secure Development Environment o Provide documentation to support the NRC staffs review of the RadlCS development environment NRC staff would also like to interview RadlCS personnel involved in this activity.
- RadlCS FPGA Logic Implementation o Provide documentation for the RadlCS Platform FPGA logic development processes and procedures used to configure and implement the FPGA logic.
o Provide documentation of the Radiy Product Configuration Toolset (RPCT) processes used to implement the RadICS module FPGA logic electronic design (ED) and to configure the module units. Observations made during this activity will be documented in the audit report and referenced by the safety evaluation to provide a basis for the safety conclusions.
Team Assignments The NRC staff performing the audit will be:
- Ken Mott - audit team lead; Software Processes (focus: independent V&V and Software Safety activities and FPGA and module unit logic toolset development activities, RadICS toolset selection and evaluation, automated code generation)
- Richard Stattel - software processes (focus: Requirements Thread Reviews, Quality Assurance Programs, Configuration-Management Programs and Secure Development Environment assessment).
Logistics The audit will take place at the Kinectrics facility in Toronto, Canada. The audit will start on the morning of April 2, 2018 (Monday) and conclude at the close of business April 5, 2018 (Thursday). The tentative schedule for the audit is as follows:
- Monday, April 2, 2018 (8:30 am - 5:00 pm) o 8:30 am - Entrance meeting (NRC staff - purpose of audit; RadICS staff - brief overview of platform and testing facilities) o 10:00 am - Presentations and demonstration of platform operation by RADICS o 1:00 pm - audit team to jointly work on a requirements thread to see an overview of the entire platform ED and application ED software and FPGA logic development process.
- Tuesday, April 3, 2018 (8:30 am - 5:00 pm) o 9:00 a.m. - Morning meeting between the NRC staff and RadICS to discuss activities and logistics for the day o 9:30 a.m. - Review of RadICS documentation and interviews with key RadICS personnel - NRC staff may work together or individually, as circumstances dictate o 4:00 p.m. - NRC staff internal meeting o 4:30 p.m. (as needed) - NRC staff and RadICS discuss any observations from the day.
- Wednesday - April 4, 201 (8:30 am - 5:00 pm) o 9:00 am - Morning meeting between NRC staff and RadICS staff to discuss activities and logistics for the day o 9:30 am - Review of RadICS documentation - NRC staff may work together or individually, as circumstances dictate o 1:00 pm - RadICS FPGA Logic ED Programming Demonstration/Discussion o 4:00 pm - NRC staff internal meeting o 4:30 pm (as needed) - NRC staff and RadICS discuss any observations from the day
- Thursday, April 5, 2018 (8:30 am - 5:00 pm) o 9:00 am - NRC staff internal meeting - identification/resolution of any open items o 2:00 pm - Exit meeting (NRC staff - general overview of observations and identification of any open items)
As circumstances dictate, the above schedule can be modified.
Special Requests Because RadICS development activities are performed in Kirovograd, Ukraine, the NRC staff will not be able to directly audit the secure development environment during the audit at the Toronto Kinectrics facility. To compensate for this limitation, the NRC staff requests that a RadICS representative who is familiar with the physical attributes and network configuration of the RadICS/Radiy development facilities be present to discuss security measures in place to establish the secure RadICS platform development environment. The NRC also requests that documentation of the RadICS/Radiy Facility development environment such as the network architecture be available for NRC staff review during the audit.
Deliverables The NRC regulatory audit report should be issued by May 18, 2018.
Appendix A Table of Proprietary Documents Provided via Research and Production Corporation Radiy September 20, 2016, Letter Document Number Description Rev 2016-RPC003-TR-001 RadICS Topical Report 0 D2.1 RadIC Functional Safety Management Plan 3.0 D2.2 RadiCS Configuration Management Plant 3.0 D2.4 RadICS Overall Verification and Validation Plan 3.0 D2.8 RadICS Security Analysis Report 1.1 D2.10 RadICS Functional Safety Management Plan Phase 3 1.0 Extension D3.1 RadICS Safety Requirements Specification 3.0 D4.0 RadICS Safety Validation Test Plan 3.0 D5.1 RadICS Product Architecture Document 3.3 D10.1 RadICS Integration Test Plan 3.0 2016-RTS002-EQTP-004 Equipment Qualification Test Plan 0 2015-RTS001-CGDP-DIM-003 Commercial Grade Dedication Plan for Logic Module 1 2015-RTS001-CGDP-LM-101 Commercial Grade Dedication Plan for Logic Module 1 2015-RTS001-CGDP-DOM-102 Commercial Grade Dedication Plan for Digital Output 1 Module 2015-RTS001-CGDP-AIM-103 Commercial Grade Dedication Plan for Analog Input 2 Module 2015-RTS001-CGDP-AOM-104 Commercial Grade Dedication Plan for Analog Output Module 1 2015-RTS001-CGDP-OCM-106 Commercial Grade Dedication Plan for Optical 1 Communication Module 2015-RTS001-CGDP-CH-107 Commercial Grade Dedication Plan for Dedication Plan for 1 Chasis 2015-RTS001-CGDP-IOPM-131 Commercial Grade Dedication Plan for Input/Output Connections Protection Module 1 2015-RTS001-CGDP-VM-132 Commercial Grade Dedication Plan for Ventilation Module 1