ML18040A095
| ML18040A095 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/08/1993 |
| From: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17059A032 | List: |
| References | |
| GL-92-01, GL-92-1, NMP1L-0779, NMP1L-779, TAC-M83486, NUDOCS 9309140272 | |
| Download: ML18040A095 (4) | |
Text
ACCELERATFD DOC'UMEYT DISTR. 8UTION SYS'1'EM REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:9309140272 DOC.DATE: 93/09/08 NOTARIZED:
NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 AUTH.NAME AUTHOR AFFILIATION SYLVIA,B.R.
Niagara Mohawk Power Corp.
tI'~oW~
RECIP'.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
D NOTES:
SUBJECT:
Forwards response to NRC 930722 RAI addressing util 921217 I
submittal for Svc Level A a B loadings 6 util 930226 submittal for Svc Level C
6 D loadings,in ref to GL 92-01, "Reactor Vessel Structural Integrity."
DISTRIBUTION CODE:
R028D COPIES RECEIVED:LTR
( ENCL Q SIZE:
TITLE: Generic Letter 92-01 Responses (Reactor Vessel Structural Integrity 1
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: ACRS NRR/DORS/OGCB NRR/DRPW CARD B REG FIL 01 COPIES LTTR ENCL 1
1 6
6 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME BRINKMAN,D.
NRR/DE/EMCB NRR/DRPE/PDI-1 NUDOCS-ABSTRACT OGC/HDS1 RES/DE/MEB COPIES LTTR ENCL 2
2 2
2 1
1 1
1 1
0 1
1 D
EXTERNAL: NRC PDR 1
ljl/$
NSIC 1
14P D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT TIIE DOCUMEN'I'ON'I'I<OLD)"SK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISCI'RIBU'I'ION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
1 I
".y Llt-'ll
V HIIAS A
U MCjNIAWK September 8, 1993 NMP1L 0779 NIAGARAMOHAWKPOWER CORPORATION/NINE MILEPOINT, P.O. BOX63, LYCOMING,NY13093/TELEPHONE (315) 349-2882 B. Ralph Sylvia Executive Vice President Nuclear U. S. Nuclear Regulatory Commission
- Attn'. Document Control Desk; Washington, D.C.
20555 Re:
Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 TA N
M 4
SUBJECT:
GENERIC LETTER 92-01, REVISION 1, REACTOR VESSEL STRUCTURAL INTEGRITY, REQUEST FOR ADDITIONALINFORMATION
'Gentlemen:
By letters dated December 17, 1992 (NMP1L 0723) and February 26, 1993 (NMP1L 0739),
Niagara Mohawk provided elastic-plastic fracture mechanics assessments for Nine Mile Point Unit 1 beltline plates for Service Level A and B loadings and Service Level C and D loadings, respectively.
These reports demonstrate that a margin of safety exists against fracture equivalent to that required by Appendix G of ASME Code Section III, for beltline plates having upper-shelf energy values below the screening criterion of 50 ft-lb. By letter dated July 22, 1993, the NRC Staff requested that Niagara Mohawk submit additional information for each of the above submittals, as identified in Enclosures 1 and 2 of their letter.
Enclosed is Niagara Mohawk's response to the Staff's July 22, 1993 request for additional information.
The Enclosure 1 responses address our December 17, 1992 submittal for Service Level A and B loadings and the Enclosure 2 responses address our February 26, 1993 submittal for Service Level C and D loadings.
Very truly yours, B. Ralph Sylvia Exec. Vice President-Nuclear AER/mls 004283GG Enclosure pc:
Mr. T. T. Martin, Regional Administrator Mr. R. A. Capra, Director, Project Directorate I-1, NRR Mr. D. S. Brinkman, Senior Project Manager, NRR Mr. W. L. Schmidt, Senior Resident Inspector
- --R~r,orris..Management 9309140272 ya0P08',;.
PDR ADOCK 05000220 P
PDR I pp
'l51~
C
s<