Emergency Response Organization Staffing and Augmentation - License Amendment Request Pre-Submittal Call Meeting - February 7, 2018
ML18036A714
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/07/2018
From:
Tennessee Valley Authority
To: Farideh Saba
Plant Licensing Branch II
Saba F DORL/LPL2-2 301-415-1447
References
Download: ML18036A714 (13)


Text

Browns Ferry Nuclear Plant Emergency Response Organization Staffing and Augmentation License Amendment Request Pre-Submittal Call Meeting February 7, 2018

Participants WaltLee,TVAEmergencyPreparedness(EP)Director JoshPerrel,TVAEPPlanandProcedures DennisJones,TVAEPSpecialProjects EdSchrull,TVAFleetLicensingManager GordonWilliams,TVAFleetLicensing BradTidwell,TVABFNEPManager MonicaRay,EnergyComplianceConsultants 2

BFNEROStaffingLARl

Agenda

  • Purpose
  • EmergencyPlanLicensingBasis
  • ProposedChanges
  • Precedent
  • RegulatoryRequirementsandGuidance
  • Schedule
  • Conclusion
  • Questions 3

BFNEROStaffingLARl

Purpose TooutlineproposedBrownsFerryNuclearPlant(BFN)

EmergencyPlanchangesandtheconsiderationsusedin developmentoftheLicenseAmendmentRequest, including:

- RegulatoryRequirements

- RegulatoryGuidance

- CurrentNRCStaffpositions

- SequoyahNuclearPlantDraftRequestsforAdditional Information(RAIs) 4 BFNEROStaffingLARl

LicensingBasis

  • BFNEmergencyPlan,Revision0,wasapprovedby theNRCbySafetyEvaluationReportdated November1,1988
  • TVAsRadiologicalEmergencyPlan(REP)hastwo componentsforeachsite

- NPREP(Generic)whichcontainsfleetwideinformation

[CurrentRevision107]

- BFNSiteSpecificREPAppendixA[CurrentRevision108]

5 BFNEROStaffingLARl

ProposedChanges Eliminate30minuteaugmentedresponsepositions Extendtherequirementfordispatchofsamplingteamsfrom30and 60minutesto60and90minutes ExtendaugmentationresponsetimesforonsiteEROpersonnelto 90minutes ReducethenumberofRadiationProtection(RP)immediate responsepositionsfrom12 to6 TransitiononshiftdoseassessmentfunctionfromRPtoChemistry Removemaintenancepersonnelfromonshift Eliminatethe60minuteaugmentedresponsebytheRadwaste Operator(RWO)

RemoveotherasneededsupportpositionsfromREPAppendixA EmergencyPlanFigures 6

BFNEROStaffingLARl

Precedent SafetyEvaluationsissuedforthefollowing:

RequestsforAdditionalInformation(RAIs)associatedwith theSequoyahNuclearPlantsubmittaldatedSeptember29, 2017.(ML17272A940) 7 BFNEROStaffingLARl

ApplicableRegulatoryRequirements

BFNEROStaffingLARl

ApplicableGuidanceDocuments

  • RG1.219,GuidanceonMakingChangestoEmergencyPlans forNuclearPowerReactors,Revision1
  • NSIR/DPRISG01,EmergencyPlanningforNuclearPower Plants
  • NEI1005,AssessmentofOnShiftEmergencyResponse OrganizationStaffingandCapabilities
  • NUREG0654/FEMAREP1,CriteriaforPreparationand EvaluationofRadiologicalEmergencyResponsePlansand PreparednessinSupportofNuclearPowerPlants,Revision1
  • RIS201610,LicenseAmendmentRequestsforChangesto EmergencyResponseOrganizationStaffingand Augmentation BFNEROStaffingLARl 9

Schedule

  • SubmitinMarch2018
  • Requestapprovalwithinoneyearofsubmittal acceptance
  • Proposea180dayimplementationperiod BFNEROStaffingLARl10

Conclusion Basedonthetechnical,functional,andstaffing analysesperformed,TVAhasconcludedthatthe proposedchanges:

  • MaintainsupportfortherequiredEmergencyPlan functions
  • Continuetoensuretheprotectionofpublichealth andsafety
  • Complywithapplicableregulatoryrequirements BFNEROStaffingLARl11

Questions?

12 BFNEROStaffingLARl

13 BFNEROStaffingLARl