Monthly Operating Rept for June 1995 for Shearon Harris Npp
ML18011A962
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/30/1995
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-950633, NUDOCS 9507200032
Download: ML18011A962 (5)


Text

PRIORITY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9507200032

~

DOC.DATE: ~%~0-NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.

Carolina Power

& Light Co.

ROBINSON,W.R.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g

05000400 p

SUBJECT:

Mont operating rept for June 1995 for Shearon Harris NPP.

W 50713 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) 0 NOTES:Application for permit renewal filed.

05000400 I

RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL:

eRS ILE CEN 01 NRR DOPS/OECB EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

0 N

NOTE,TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

Carolina Power & Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant JUL 3 3'199S File: HO-950633 Serial HNP-95-064 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power Sc Light Company herewith submits the report of operation statistics and shutdown experience for the month of June 1995.

Sincerely, SGR/Ijw Enclosure c:

Mr. S. D. Ebneter (NRC-RII)

Mr. S. A. Elrod (NRC-SHNPP)

Mr. N. B. Le (NRR)

HIS/MTH-OPR.RPT/1 9507200032 950630 PDR 4DOCK 05000400 R

PDR State Road1134 NewHill NC Tel 919362-2502 Fax 919362-2095

4 zr F

IP J'

iC CPAL CO RUN DATE 07/05/95 RUN TIME 12:53:55 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1

RPD36-000 Enclosure to Serial HNP-95-064 Sheet 1 of 2 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573

1. UNIT NAME:

HARRIS UNIT 1 NOTES 2.

RBPORTING PERIOD:

JUNE 95 I

3.

LICENSED THERMAL POWER (MWT): 2775 I

4.

NAMBPLATE RATING (GROSS MWB): 950.9 I

5.

DESIGN BLECTRICAL RATING (NET MWB): 900. 0 6

MAX DEPENDABLE CAPACITY (GROSS MWE): 920 0

I 7.

MAX DEPENDABLE CAPACITY (NET MWE): 860. 0 8.

ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

GIVE REASONS:

SINCE LAST REPORT, 9.

POWER LEVEL TO WHICH RESTRICTED ZF ANY (NET MWB):

10.

REASONS FOR RESTRICTION IF ANY:

THIS MONTH YR TO DATE CUMUL ATZVE 11.

HOURS IN REPORTING PERIOD 720.00 4343.00 71568.00 12.

NUMBER OF HOURS REACTOR CRITZCAL 720.00 4343.00 59892.85 13.

REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00 14.

HOURS GENERATOR ON LINE 720.00 4343.00 59317.07 15.

UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00 16.

GROSS THERMAL ENERGY GEN.

(MWH) 1988409.60 11836664.82 158651955.90 17.

GROSS ELEC.

ENERGY GEN.

(MWH) 652770.00 3927832.00 52851358.00 18.

NET ELEC.

ENERGY GENERATED (MWH) 613282. 00 3686656. 00 49277310. 00 19.

UNIT SERVICE FACTOR 100. 00 100.00 82.88 20.

UNIT AVAILABILITYFACTOR 100. 00 100.00 82.88 21.

UNIT CAP.

FACTOR (USING MDC NET) 99.04 98.71

80. 06 22.

UNIT CAP.

FACTOR (USING DER NET) 94.64 94.32

76. 50 23.

UNIT FORCED OUTAGE RATE

.00

.00

2. 71 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit is scheduled for shutdown on September 2,

1995 for refueling outage number 6.

Planned duration of outage is 40 days.

25.

ZF SHUTDOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION MIS/MTH "OPR. RPT/3 1.16 -

9

lt I

)

Enclosure to Serial HNP-95-064 Sheet 2 of 2 CP&L CO PLANT PERFORMANCE DATA SYSTEM RUN DATE 07/05/95 APPENDIX B - AVERAGE DAILY POWER LEVEL RUN TIME 12:53:54 HARRIS UNIT 1 PAGE 1

RPD39-000

(

DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 1995 DAY AVG. DAILY POWER IEVBL (MWE-NET)

DAY AVG. DAILY POWER LEVBL (MWE-NET) 855 17 859 851 18 857 853 856 851 20 858 855 21 853 855 22 850 852 23 850 847 852 848 25 853 10 807 26 851 848 27 851 12 852 28 848 13 862 29 853 861 30 853 15 857 16 857 1.16 -

8 Note: There were no significant power reductions for the month of June.