Monthly Operating Rept for Aug 1993 for Harris Nuclear Power Plant,Unit 1
ML18011A178
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/1993
From: Crenshaw A, Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO931035, NUDOCS 9309200171
Download: ML18011A178 (9)


Text

ACCELERA"I'4g DOCUMENT DIST

~UTION SYSTEM REGULARLY INFORMATION DISTRIBUTI SYSTEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME'UTHOR AFFILIATION CRENSHAW,A.

Carolina Power a Light Co.

ROBINSON,W.R.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R

SUBJECT:

Monthly operat'or Aug 1993 for Harris Nuclear Power Plant, Unit l.,

930914 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

D NOTES:Application for permit renewal filed.

osooo4oo 1

RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL EG6tG BRYCE iJ

~ H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/DORS/OEAB

EG-

0 1 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT TIIE DOCUMEN'I'ON1'ROL DESV ~

ROOM Pl-37 (EXT. 504-206S) TO ELIMINATEYOUR NA)AE Fl<OM DIS fRIIIU'I'ION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

~Ef' 4

1995 Carolina Power

& Light Company PO Box 1551

Raleigh, NC 27602 File Number:

SHF/10-15505 Letter Number:

H0931035 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power

& Light Company heiewith submits the report of operation statistics and shutdown experience for the month of August 1993.

Yours very truly, W.

R. Robinson General Manager Harris Nuclear Plant APC:bdd Enclosure c:

Mr. S.

D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP)

MIS/MTH-OPR.RPT/1/OS4

,930920017l 930831' PDR;, ) ADOCK 05000400 PDR

r J

tsF w

$ ~ l I f qp

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

August 1993 COMPLETED BY:

Amanda Crenshaw OPERATIONS SULTRY Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 99.01 percent Capacity Factor.

There was one significant power reduction.

There are 157 fuel assemblies in the reactor vessel and 997 spent fuel assemblies

stored in the spent fuel pools.

549 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.

224 of the spent fuel assemblies are from CPKL's Robinson Plant.

MISNMTH-OPR.RPTX2%0S4

CPbl CO RUN DATE 69/16/93 RUN TIME 69: 40: 56

.~LANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMAHDA CRENSHAM TELEPHONE (939)362-2868 UNIT NAME:

HARRIS UNIT 3

NOTES 2.

REPORTIHG PERIOD:

AUGUST 93 I

3.

LICENSED THERMAL POWER (MWT): 2775 See Operations Summary.

4.

NAMEPLATE RATING (GROSS MWE): 950.9 I

5.

DESIGH ELECTRICAL RATING (NET MME): 960.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (HET MWE): 860.6

8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)

SIHCE LAST REPORTS GIVE REASONS:

None.

POWER LEVEL TO WHICH RESTRICTED IF AHY (NET MWE):

None.

16, REASONS FOR RESTRICTION IF ANY:

N/A TH1S MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTIHG PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 34.

HOURS GENERATOR OH LINE 15.

UNIT RESERVE SHUTDOWN HOURS

$ 6.

GROSS THERMAL ENERGY GEH.

(MWH)

$ 7.

GROSS ELEC.

ENERGY GEH.

(MWH)

$ 8.

HET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC HET) 22.

UNIT CAP.

FACTOR (USING DER HET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS None.

744.00 744.60

.00 744.00

.00 2050427.52 675226.00 633523.68 166.66

$ 66.66 99.6$

94.63

.00 (TYPE,

DATE, 5833.00 5864.43

.06 5792.45

.00 15896446.98 5333002.80 5085660.00 99.34 99.34 99.83 95.37

.60 AND DURATIOH 55536.00 45373.31

.00 44848.63

.00

$ 19243552.42 39747843.66 37636736.66 80.76 80.76 77.49 74.05 3.55 OF EACH):

25. IF SHUTDOWN AT EHD OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IH TEST STATUS (PRlOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 MIS /MTH-OPR. RP T/3/OS 4

r

CPhL CO RUH DATE 09/10/93 RUH TIME 09:40:56 LANT PERFORMANCE DATA SYSTEM APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT f PAGE RPD39-000 AUGUST 3993 DAY AVG. DAILY POWER LEVEL (MWE-HET)

DOCKET HO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-HET) 857 853 854 857 856 866 858 859 720 862 867 24 861 30 862 27 859 859 858 817 855 857 852 1.16 8

MIS/MTH-OPR.RPT/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION IO ra O

REPORT MONTH: August 1993 UNIT NAME:

Harris DATE:

September 09, 1993'OMPLETED BY: A. P. Crenshaw TELEPHONE:

(919) 362-2808 No.

93%04 Date 930822 T'

P e

Duration (Hours) 0.0 R~

e a

s 0

n A

Method of Shutting Down Reactor'icensee Event Report ¹ N/A System Code 4 HH Component Code 5 Valve Cause and Corrective Action to Prevent Recurrence Unit power reduced to 85% to perform the monthly turbine valve test.

During performance of the test, a leak was detected on 1HD-325, Moisture Separator Reheater Drain Tank "B" Outlet to Condenser Level Control Valve, and power was further reduced to 80% for repairs to the valve.

The turbine valve test and 1HD-325 repairs were satisfactorily completed and the unit was returned to 100%.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 -Same Source

I I t,

.e 1

C,