William G. Hettel Vice President, Operations P.O. Box 968, Mail Drop PE23 Richland, WA 99352-0968 Ph. 509-377-8311 F. 509-377-4674 wghettel@energy-northwest.com December 21, 2017 10 CFR 50.71(e)
GO2-17-190 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397, 10 CFR 50.71 MAINTENANCE OF RECORDS LICENSING BASIS DOCUMENT UPDATE AND BIENNIAL COMMITMENT CHANGE REPORT
Reference:
Letter, GO2-17-191, W.G. Hettel (Energy Northwest) to NRC, 10 CFR 50.71 Maintenance of Records Non Public Version of the Final Safety Analysis Report (FSAR)
Dear Sir or Madam:
In accordance with the requirements of 10 CFR 50.71(e), Energy Northwest hereby submits the following updated Columbia Generating Station (Columbia) Licensing Basis Documents:
- Final Safety Analysis Report (FSAR), Amendment 64 (publicly available)
- Technical Specification Bases (TSB), Revision 101
- Licensee Controlled Specifications (LCS), Revision 98
- Operational Quality Assurance Program Description (OQAPD), Revision 52 In addition to other changes, FSAR Amendment 64 removes some redundant information and excessive detail from the FSAR to improve its focus and clarity. In accordance with NEI 98-03, Revision 1, Guidelines for Updating Final Safety Analysis Reports, as endorsed by Regulatory Guide 1.181, Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e), a brief description of the information removed is provided in Attachment 1.
contains the Columbia Generating Station 2016 - 2017 Commitment Change Report. This report is submitted pursuant to NEI 99-04, Guidelines for Managing NRC Commitment Changes.
G02-17-190 Page 2 of 2 Columbia License Basis Documents are provided in electronic format in Attachments 4 and 5. The files are in the Portable Document Format (PDF). Attachment 3 contains a listing of the individual document component filenames comprising Attachments 4 and
- 5. The files have been sized to meet file size limitations for electronic submittals.
Additionally, the PDF files in Attachment 5 contain hyperlinks. These hyperlinks are not essential to the FSAR content and are disabled.
Consistent with Energy Northwest's past FSAR submittals, Energy Northwest is providing a publicly available version of the FSAR (Attachment 5) in which information.
previously considered to be "sensitive unclassified (non-safeguards) information" has been removed. A list of information removed from the FSAR submittal is contained in. A complete copy of the FSAR is submitted under separate cover.
There are no commitments being made by this letter; however, two existing commitments have been changed as described in Attachment 2.
If you have any questions or desire additional information pertaining to this report, please contact Ms. LL. Williams, Licensing Supervisor, at (509)377-8148.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the ~
day of December 2017.
Resp\\2Z WG Hettel Ac\\-;\\_ fr Vice President, Operations
Attachment:
- 1.
Redundant Information and Excessive Detail Removed from the FSAR
- 2.
Regulatory Commitment Changes (NEI 99-04 Process)
- 3.
Document Components
- 4.
Technical Specification Bases, Revision 101 Licensee Controlled Specifications, Revision 98 Operational Quality Assurance Program Description, Revision 52
- 5.
Columbia Generating Station FSAR, Amendment 64, Publicly Available
- 6.
Information withheld from Columbia Generating Station FSAR, Amendment 64, Publicly Available (Attachment 5) cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident lnspector/988C CD Sonada-BPA/1399 WA Horin - Winston & Strawn
GO2-17-190 Page 1 Redundant Information and Excessive Detail Removed from the FSAR CHAPTER 2 Section Description of Change Type 2.2.2.1 Removed expected completion time for 618-11 burial site.
Excessive detail CHAPTER 3 Section Description of Change Type 3.9.3.4.1(c)(2)(f)
Delete There are no hydraulic snubbers installed on safety-related systems at CGS; mechanical snubbers are used exclusively.
Excessive detail CHAPTER 8 Section Description of Change Type 8.2.1.3 Removed Main Transformer Bank rating and configuration.
Excessive detail CHAPTER 10 Section Description of Change Type Figure 10.1-2 Delete figure Excessive detail CHAPTER 13 Section Description of Change Type 13.1.2.2.7.1 Removed specific titles.
Excessive detail 13.1.2.2.7.2 Removed specific titles.
Excessive detail 13.1.2.2.7.3 Removed specific titles.
Excessive detail 13.1.2.2.7.4 Removed specific titles.
Excessive detail 13.1.2.2.7.5 Removed specific titles.
Excessive detail 13.2.2.1.1, 13.2.2.2, 13.2.2.3.2 Removed The accreditation is renewed every 4 years.
Excessive detail Appendix F Section Description of Change Type F.7.3 Delete ISFSI DIC numbers Excessive detail F.7.8.a Delete SWP-FFP-01 subsections Excessive detail
GO2-17-190 Page 1 of 2 Regulatory Commitment Changes (NEI 99-04 Process)
This section reports changes to regulatory commitments consistent with the information pertaining to Regulatory Commitment Changes (RCC) and is included pursuant to the NEI 99-04 criteria for reporting.
From GO2-87-278 (RCC-NA)
The change in Columbias Code of Record for the Inservice Inspection (ISI) Program from the 2001 edition to the 2008 edition of American Society Mechanical Engineers (ASME)Section XI during the 4th 10-year interval update (2015), 10 CFR 50.55a(b)(3(v)(B) mandates that the ASME Operation and Maintenance (OM) Code now be followed for the testing and examination of snubbers.
To support the change, Snubber Surveillance requirements were removed from the Licensee Controlled Specifications (LCS) and relocated the requirements to SWP-PRG-03 Snubber Program. The procedure ensures that the requirements of the ASME OM Code, Subsections ISTA and ISTD are met. This is done to comply with 10 CFR 50.55a(b)(3(v)(B) which states:
Licensees must comply with the provisions for examining and testing snubbers in Subsection ISTD of the ASME OM Code and make appropriate changes to their technical specifications or licensee-controlled documents with using the 2006 Addenda and later editions and addenda of Section XI of the ASME BPV Code.
Per the ASME OM Code, the commitment to have a flowchart in the implementing procedures is not required to support the Snubber Program. The ASME Code Subsection ISTD offers two testing plans to follow, the 10% Plan and the 37 Plan.
Flowcharts for the different available testing plans are provided as Non-Mandatory Appendix E in the current ASME OM Code of record (2004 Edition, 2006 addenda).
The need to commit to reproducing a flowchart specific in the implementing program document is redundant to the Code Non-Mandatory Appendix E. It does not provide an increase in the ability of a structure, system or component (SSC) to perform its intended function.
The original commitment stated:
A flow chart (Attachment 1) shows how snubber Functional Testing Shall be carried out at WNP-2. This flow chart shall be included in implementing procedures.
This commitment is deleted in its entirety.
GO2-17-190 Page 2 of 2 From GO2-05-147 (RCC-AR 354706)
The original commitment required the use of the load bank installed on the DG4 trailer.
This commitment was made in support of the License Amendment Request for Extension of Diesel Generator Completion Time. (GO2-05-0147). The intent of the original statement was to ensure load testing was performed using a load bank rather than installed plant equipment. The wording in the commitment was intended to describe the testability of DG4 with respect to the attached load bank.
Energy Northwest now has an alternative load bank for testing DG5 that is identical to the installed DG4 load bank. The change will allow using the alternate load bank in the event the installed load bank is unavailable. The change will allow for flexibility with respect to testing DG4 in preparation of entering a 14-day Limiting Condition for Operation (LCO) for diesel generator maintenance.
The original commitment stated:
Verification of DG-4s availability to perform its risk management function will be by periodic testing and inspections.... This load testing will be performed using a load bank that is part of the DG-4 mobile unit and completely independent of the plants electrical distribution system.
Commitment description has been revised to say:
Verification of DG-4s availability to perform its risk management function will be by periodic testing and inspections.... This load testing will be performed using a load bank that is part of the DG-4 mobile unit, or equivalent, and completely independent of the plants electrical distribution system.
GO2-17-190 Page 1 TSB, LCS, OQAPD File Name Description _1 TSB _2 LCS _3 OQAPD FSAR Amendment 64 Publicly Available _1 of 10.pdf General Table of Contents
& List of Effective Pages _2 of 10.pdf Chapters 1 & 2 _3 of 10.pdf Chapters 3 and 3a _4 of 10.pdf Chapters 4, 5 & 6 _5 of 10.pdf Chapter 7 _6 of 10.pdf Chapter 8 _7 of 10.pdf Chapter 9 _8 of 10.pdf Chapters 10 & 11 _9 of 10.pdf Chapter 12 _10 of 10.pdf Chapters 13, 14, 15 16 & 17 Appendices A, B, F, I & J
GO2-17-190 Page 1 of 3 INFORMATION WITHHELD FROM COLUMBIA GENERATING STATION FSAR AMENDMENT 64, PUBLICLY AVAILABLE (ATTACHMENT 5)
Drawing or Section Drawing or Section Drawing or Section Drawing or Section Figure 1.2-1 Figure 3.2-5 Figure 3.5-36 Figure 3.6-35.1 Figure 1.2-2.1 Figure 3.2-6 Figure 3.5-37 Figure 3.6-35.2 Figure 1.2-2.2 Figure 3.2-7 Figure 3.5-38 Figure 3.6-36.1 Figure 1.2-3.1 Table 3.5-5 Figure 3.5-39 Figure 3.6-36.2 Figure 1.2-3.2 Figure 3.5-1 Figure 3.5-41 Figure 3.6-37.1 Figure 1.2-4.1 Figure 3.5-2 Figure 3.5-42 Figure 3.6-37.2 Figure 1.2-4.2 Figure 3.5-3 Figure 3.5-43 Figure 3.6-38.1 Figure 1.2-5 Figure 3.5-4 Figure 3.5-44 Figure 3.6-38.2 Figure 1.2-6 Figure 3.5-5 Figure 3.5-45 Figure 3.6-38.3 Figure 1.2-7 Figure 3.5-6 Figure 3.5-46 Figure 3.6-39.1 Figure 1.2-8 Figure 3.5-7 Figure 3.5-47 Figure 3.6-39.2 Figure 1.2-9 Figure 3.5-8 Figure 3.5-49 Figure 3.6-39.3 Figure 1.2-10 Figure 3.5-9 Figure 3.5-50 Figure 3.6-40.1 Figure 1.2-11 Figure 3.5-10 Figure 3.6-1 Figure 3.6-40.2 Figure 1.2-12 Figure 3.5-11 Figure 3.6-2 Figure 3.6-41.1 Figure 1.2-13 Figure 3.5-12 Figure 3.6-3 Figure 3.6-41.2 Figure 1.2-14 Figure 3.5-13 Figure 3.6-4 Figure 3.6-42.1 Figure 1.2-15 Figure 3.5-14 Figure 3.6-5 Figure 3.6-42.2 Figure 1.2-16 Figure 3.5-15 Figure 3.6-6 Figure 3.6-43.1 Figure 1.2-17.1 Figure 3.5-16 Figure 3.6-7 Figure 3.6-43.2 Figure 1.2-17.2 Figure 3.5-17 Figure 3.6-8 Figure 3.6-44.1 Figure 1.2-18 Figure 3.5-18 Figure 3.6-9 Figure 3.6-44.2 Figure 1.2-19 Figure 3.5-19 Figure 3.6-10 Figure 3.6-45.1 Figure 1.2-20 Figure 3.5-20 Figure 3.6-11 Figure 3.6-45.2 Figure 1.2-21 Figure 3.5-21 Figure 3.6-12 Figure 3.6-46.1 Figure 1.2-22 Figure 3.5-22 Figure 3.6-13 Figure 3.6-46.2 Figure 1.2-23 Figure 3.5-23 Figure 3.6-14 Figure 3.6-47.1 Figure 1.2-24 Figure 3.5-24 Figure 3.6-15 Figure 3.6-47.2 Figure 2.1-3 Figure 3.5-25 Figure 3.6-16 Figure 3.6-48.1 Figure 2.4-6.1 Figure 3.5-26 Figure 3.6-17 Figure 3.6-48.2 Figure 2.4-6.2 Figure 3.5-27 Figure 3.6-18 Figure 3.6-49.1 Figure 2.4-6.3 Figure 3.5-28 Figure 3.6-19 Figure 3.6-49.2 Figure 2.4-6.4 Figure 3.5-29 Figure 3.6-20 Figure 3.6-50.1 Figure 2.4-6.5 Figure 3.5-30 Figure 3.6-32.1 Figure 3.6-50.2 Figure 2.4-16 Figure 3.5-31 Figure 3.6-32.2 Figure 3.6-50.3 Figure 2.4-28 Figure 3.5-32 Figure 3.6-33.1 Figure 3.6-51.1 Figure 3.2-2 Figure 3.5-33 Figure 3.6-33.2 Figure 3.6-51.2 Figure 3.2-3 Figure 3.5-34 Figure 3.6-34.1 Figure 3.6-51.3 Figure 3.2-4 Figure 3.5-35 Figure 3.6-34.2 Figure 3.6-52.1
GO2-17-190 Page 2 of 3 INFORMATION WITHHELD FROM COLUMBIA GENERATING STATION FSAR AMENDMENT 64, PUBLICLY AVAILABLE (ATTACHMENT 5)
Drawing or Section Drawing or Section Drawing or Section Drawing or Section Figure 3.6-52.2 Figure 3.8-11 Figure 3A.2.1-1 Figure 3A.5.1-14b Figure 3.6-53.1 Figure 3.8-12 Figure 3A.2.1-2 Figure 3A.5.1-15a Figure 3.6-53.2 Figure 3.8-13 Figure 3A.2.1-3 Figure 3A.5.1-15b Figure 3.6-54.1 Figure 3.8-17 Figure 3A.2.1-4 Figure 3A.5.1-16a Figure 3.6-54.2 Figure 3.8-18 Figure 3A.2.1-5 Figure 3A.5.1-16b Figure 3.6-55.1 Figure 3.8-20 Figure 3A.2.1-6 Figure 3A.5.1-17a Figure 3.6-55.2 Figure 3.8-21 Figure 3A.2.1-7 Figure 3A.5.1-17b Figure 3.6-56.1 Figure 3.8-22 Figure 3A.2.1-8 Figure 3A.5.1-18a Figure 3.6-56.2 Figure 3.8-23 Figure 3A.2.1-9 Figure 3A.5.1-18b Figure 3.6-57.1 Figure 3.8-24 Figure 3A.4.1-5 Figure 3A.5.1-19a Figure 3.6-57.2 Figure 3.8-25 Figure 3A.4.1-6 Figure 3A.5.1-19b Figure 3.6-57.3 Figure 3.8-26 Figure 3A.4.1-7 Figure 3A.5.1-20a Figure 3.6-58 Figure 3.8-27 Figure 3A.4.2-1 Figure 3A.5.1-20b Figure 3.6-59 Figure 3.8-28 Figure 3A.4.2-3 Figure 3A.5.1-21a Figure 3.6-60.1 Figure 3.8-29 Figure 3A.5.1-1b Figure 3A.5.1-21b Figure 3.6-60.2 Figure 3.8-30 Figure 3A.5.1-2 Figure 3A.5.1-22a Figure 3.6-65 Figure 3.8-31 Figure 3A.5.1-3a Figure 3A.5.1-22b Figure 3.6-66 Figure 3.8-32 Figure 3A.5.1-3b Figure 3A.5.1-23a Figure 3.6-85 Figure 3.8-33 Figure 3A.5.1-4a Figure 3A.5.1-23b Figure 3.6-86 Figure 3.8-34 Figure 3A.5.1-4b Figure 3A.5.1-24a Figure 3.6-87 Figure 3.8-35 Figure 3A.5.1-5a Figure 3A.5.1-24b Figure 3.6-88 Figure 3.8-36 Figure 3A.5.1-5b Figure 3A.5.1-25a Figure 3.6-92.1 Figure 3.8-37 Figure 3A.5.1-6a Figure 3A.5.1-25b Figure 3.6-92.2 Figure 3.8-38 Figure 3A.5.1-6b Figure 3A.5.1-26a Figure 3.6-92.3 Figure 3.8-39 Figure 3A.5.1-7a Figure 3A.5.1-26b Figure 3.6-93 Figure 3.8-40 Figure 3A.5.1-7b Figure 3A.5.2-1 Figure 3.6-94.1 Figure 3.8-41 Figure 3A.5.1-8a Figure 3A.5.2-2 Figure 3.6-94.2 Figure 3.8-42 Figure 3A.5.1-8b Figure 3A.5.2-3 Figure 3.6-95 Figure 3.8-43 Figure 3A.5.1-9a Figure 3A.5.2-4 Section 3.8.4 Figure 3.8-44 Figure 3A.5.1-9b Figure 3A.5.2-5 Figure 3.8-1 Figure 3.8-45 Figure 3A.5.1-10a Figure 3A.5.2-6 Figure 3.8-2 Figure 3.8-46 Figure 3A.5.1-10b Figure 3A.5.2-7 Figure 3.8-3 Figure 3.8-47 Figure 3A.5.1-11a Figure 3A.5.2-8 Figure 3.8-4.1 Figure 3.8-48 Figure 3A.5.1-11b Figure 3A.5.2-9 Figure 3.8-4.2 Figure 3.8-49 Figure 3A.5.1-12a Figure 3A.5.2-10 Figure 3.8-6 Figure 3.8-50 Figure 3A.5.1-12b Figure 3A.D-11 Figure 3.8-7 Figure 3.8-51 Figure 3A.5.1-13a Figure 3A.I-1 Figure 3.8-8 Figure 3.8-52 Figure 3A.5.1-13b Figure 4.6-4 Figure 3.8-10 Figure 3.8-53 Figure 3A.5.1-14a Figure 5.4-15.3
GO2-17-190 Page 3 of 3 INFORMATION WITHHELD FROM COLUMBIA GENERATING STATION FSAR AMENDMENT 64, PUBLICLY AVAILABLE (ATTACHMENT 5)
Drawing or Section Drawing or Section Drawing or Section Drawing or Section Figure 6.2-23 Figure 8.3-2 Figure 12.3-1 Figure F.6-21 Figure 6.2-32 Figure 8.3-4.1 Figure 12.3-2 Figure J.6-1.1 Figure 6.2-33 Figure 8.3-4.2 Figure 12.3-3 Figure J.6-1.2 Figure 8.1-1 Figure 8.3-4.3 Figure 12.3-4 Figure J.6-2.1 Figure 8.1-2.1 Figure 8.3-4.4 Figure 12.3-5 Figure J.6-2.2 Figure 8.1-2.2 Figure 8.3-4.5 Figure 12.3-6 Figure J.6-3.1 Figure 8.1-2.3 Figure 8.3-4.6 Figure 12.3-7 Figure J.6-3.2 Figure 8.1-2.4 Figure 8.3-5 Figure 12.3-8 Figure J.6-4 Figure 8.1-3 Figure 8.3-6 Figure 12.3-9 Figure J.6-5 Figure 8.1-4 Figure 8.3-7 Figure 12.3-10 Figure J.6-6 Figure 8.1-5 Figure 8.3-8 Figure 12.3-11 Figure J.6-7 Figure 8.1-6.1 Figure 8.3-9 Figure 12.3-12 Figure J.6-8 Figure 8.1-6.2 Figure 8.3-10 Figure 12.3-13 Figure J.6-9 Section 8.2.2 Figure 8.3-23 Figure 12.3-14 Figure J.6-10 Figure 8.2-1.1 Figure 8.3-24 Figure 12.3-15 Figure J.6-11 Figure 8.2-1.2 Figure 8.3-25 Figure 12.3-16 Figure J.6-12 Figure 8.2-2.1 Figure 8.3-26 Figure 12.3-17 Figure J.6-13 Figure 8.2-2.2 Figure 8.3-27 Figure 12.3-18 Figure J.6-14 Figure 8.2-3.1 Figure 8.3-28 Figure 12.3-22 Figure J.6-15 Figure 8.2-3.2 Figure 8.3-29 Section F.4.4.4 Figure J.6-16 Figure 8.2-3.3 Figure 8.3-30 Figure F.6-1 Figure J.6-17 Figure 8.2-3.4 Figure 8.3-32 Figure F.6-2 Figure J.6-18 Figure 8.2-4.1 Figure 8.3-33 Figure F.6-3 Figure 8.2-4.2 Figure 8.3-34 Figure F.6-4 Figure 8.2-4.3 Figure 8.3-35 Figure F.6-5 Figure 8.2-4.4 Figure 8.3-36 Figure F.6-6 Figure 8.2-5.1 Figure 8.3-37 Figure F.6-7 Figure 8.2-5.2 Figure 8.3-38 Figure F.6-8 Figure 8.2-5.3 Figure 8.3-52.1 Figure F.6-9 Figure 8.2-5.4 Figure 8.3-52.2 Figure F.6-10 Figure 8.2-6.1 Figure 8.3-53 Figure F.6-11 Figure 8.2-6.2 Figure 9.1-4 Figure F.6-12 Figure 8.2-6.3 Figure 9.1-5 Figure F.6-13 Figure 8.2-6.4 Figure 9.1-13 Figure F.6-14 Figure 8.2-7.1 Figure 9.2-7 Figure F.6-15 Figure 8.2-7.2 Figure 9.2-13 Figure F.6-16 Figure 8.2-7.3 Figure 9.2-14 Figure F.6-17 Figure 8.2-7.4 Table 9.5-1 Figure F.6-18 Figure 8.3-1 Figure 9.5-2 Figure F.6-19 Figure F.6-20