SUBJECT:
Forwards results of 1989 reactor vessel exam.
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR ENCL'IZE- ~+
TITLE: OR Submittal: Inservice Inspection/Testing/Relief from XS Emk 05000244 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
ACCESSION NBR:8905160232 DOC.DATE: 89/05/04 NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION SMITH,R.E.
Rochester Gas 6 Electric Corp;-
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIPIENT ID CODE/NAME
.PD1-3 LA STAHLE,C INTERNAL: AEOD/DSP/TPAB NRR/DEST/MTB 9H
~"BFQB G FI Ol EXTERNAL: EGGG,BROWN,B LPDR NRC PDR 1
1 1
1 1
0 1
1 1
1 1
1 1
1 NRR/DEST/MEB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB'GGG ROCKHOLD,H NL 007 HEMMING NSIC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
0
" PDl-3 PD 1
1 COPIES LTTR ENCL 5
5 1
1 1
1 1
0 1
1 1
1 1
1 1
1
/
h D
D h
D
~~'IO ALQ:"RIDS" RECIPIENTS
~
PLEASE HELP US TO REDUCE MME!
CXNZAC1~ DXUMEÃZ CXÃIROL DESK(
RCCM Pl-37 (EXT. 20079,).
KO EILIMINATEYOUR-'NAME FBCH DISTRIBUTION LISTS FOR DOCUMENI'S YOU DClN'T NEZD!
TOTAL NUMBER OF COPIES IREQUIRED:
LTTR 21 ENCL 18
1
t zzxp'isrizziz
, i'III"(II SZSIIII ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N. K 14649.0001 ROBERT E SMITH Vice President Production end Engineering May 4, 1989 TELEPHONE AIIEAcooETI6 546.2700 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
References:
a) License No.
DPR-18 (Docket No. 50-244) b)
1989 Reactor Vessel Examination R.E. Ginna Nuclear Power Plant Gentlemen:
In accordance with the requirements of the R.E.
Ginna Q.A.
- Manual, Appendix B, Second Interval Inspection Plan; Regulatory Guide 1.150, Revision 1;
and ASME Section XI (1974 Edition including addenda through Summer 1975);
enclosed are results of the 1989 Reactor Vessel Examination.
Examination identified. only one reportable. flaw indication in the reactor vessel inlet nozzle N2B, previously described in RG&E's letter dated December 27, 1988.
Based on the attached
- analysis, the nozzle indication is considered to be acceptable, and RG&E does not plan to do augmented examinations.
Very truly yours, ober E. - mith JPO/040 Attachment xc:
Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector S905160232 890504 PDR ADOCK 05000244 Q
Reactor Vessel Inlet Nozzle N2B Indication The 1989 Ginna Station Reactor Vessel Examination consisted of a visual examination of the internal
- surfaces, nozzles and reactor internals and an ultrasonic examination of all accessible welds.
These examinations were performed in accordance with the requirements of the Ginna Station Second Interval Inspection Plan,Section XI of the ASME Boiler and Pressure Vessel Code (1974 Edition including Addenda thru Summer 1975) and Regulatory Guide 1.150, Rev.1.
With the exception of the N2B inlet nozzle, no reportable indications were found.
During the 1979 Reactor Vessel Examination a flaw was first found in the N2B inlet nozzle.
At that time the flaw was sized as 5.27" x.93".
Beam spread correction was applied and the flaw size
~
~
~
~
~
~
~
was corrected to 4.52" x.160".
The corrected flaw size was acceptable per the ASME Code rules as shown in Attachment 1.
In
- addition, a fracture mechanics analysis was performed by Teledyne Engineering which confirmed the acceptability of the flaw as shown in Attachment 2.
At the same
- time, the original construction radiographs were reviewed and confirmed the presence of slag at this location.
The flaw was located at. the 10:30 (306') position looking at, the nozzle from the vessel I.D.
The indication is at the interface of the nozzle to vessel weld preparation and was characterized as a thin planar'slag inclusion near midwall.
The 1989 Examination utilized the Southwest Research Institute (SWRI)
- Programmed and Remote (PAR) examination did.
~
~
~
~
Device just as co%-~o~
the 1979
g a
C
In addition, the 1989 examination utilized the SWRI Enhanced Data Acquisition System (EDAS) to present and analyze the data.
The Ultrasonic Examination Scope is detailed in Attachment 3.
The flaw in'he N2B nozzle was located and scanned with the same techniques and transducers as used in 1979 to obtain a
comparison and to show that the flaw size had not changed.
The size as measured in 1989 with the 1979 techniques was 4.04" x.78" which is very close to that as measured in 1979.
Focused beam transducers were then used, which clearly characterized the flaw as an elongated slag inclusion.
The slag inclusion was ultimately determined to be 4.94" x.48".
The focused transducers were developed jointly by SWRI, EPRI, Wisconsin Electric (WE) and RG&E.
The capabilities of these transducers were demonstrated in early 1989 at a demonstration at SWRI attended by representatives of the NRC, Hartford Steam Boiler, SWRI, WE and RG&E.
The Development of the Focused Transducers is discussed in Attachment 4.
ASME Code sizing techni.ques were applied to the 1989 flaw size (4.94" x.48") as indicated below:
a =.24'),
2a =
~ 48 l = 4.94" a/l =.24/4.94
=.048 a/t =.24/9.25
= 2.59%
Maximum Allowable (a/t)
= 2.44 Based on Code techniques the flaw is slightly larger than allowable. If it is assumed that the length remained constant the allowable thru wall dimension (2a) would be equivalent to.444".
j, w
e 4+~&4
This is a difference of.48"
.444" or.036" which means that the flaw is unallowable by.036".
Because the flaw is unallowable per Code rules as indicated
- above, the 1979 fracture mechanics analysis performed by Bill Cooper of Teledyne Engineering was reviewed by RG&E.
It was determined that the 1979 Analysis bounds the current flaw.
In
- addition, the Teledyne analysis was reviewed by Structural Integrity to verify that the results were still applicable.
This review is documented in a letter from Structural Integrity, Attachment 5,
and also in their analysis which is Attachment 6.
Both the Teledyne analysis and the Structural Integrity analysis show the flaw to be acceptable by a large margin.
In summary, the N2B nozzle flaw is unallowable per Code rules by a very small margin, the 1979 fracture mechanics analysis showed the flaw to be acceptable, this was confirmed by the Structural Integrity Analysis.
Construction radiographs confirmed the presence of slag at this location so it is therefore concluded that this flaw is actually a slag inclusion that has been present since the original construction and has not changed in size since that time.
Because of this the flaw is acceptable for continued operation and RG&E plans no augmented reactor vessel examinations.
r Michael J.
Sa rit Supervisor, Materials Engineering and Inspection Services NDE Level III Jo F.
mit M nager Materials Engxneerxng an Inspection Services d
Rev.1 05/04/89
C
'J 4
ATTACHMENT 1 ULTRASONIC EVALUATION OF INLET NOZZLE INSERVICE INSPECTION INDICATION
I I
f I